Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20211N521 + (02:38:04, 6 December 2024)
- ML20211N518 + (02:38:05, 6 December 2024)
- ML20211N515 + (02:38:06, 6 December 2024)
- ML20211N516 + (02:38:06, 6 December 2024)
- ML20211N514 + (02:38:07, 6 December 2024)
- 05000333/LER-1997-009-01, :on 970905,discovered Radwaste Bldg Exhaust Monitor Instrument Channel Calibr Test,Required Ts.Caused by Personnel Error.Comprehensive Root Cause Analysis Completed to Review & Identified Human Performance Considerations + (02:38:09, 6 December 2024)
- IR 05000528/1987006 + (02:38:11, 6 December 2024)
- ML20211N507 + (02:38:13, 6 December 2024)
- ML20211N506 + (02:38:13, 6 December 2024)
- 05000333/LER-1997-009, Forwards LER 97-009-00 Re Exceeded Quarterly Calibr Frequency for Radwaste Bldg Exhaust Radiation Monitor.No Commitments Contained in Rept + (02:38:14, 6 December 2024)
- ML20211N505 + (02:38:14, 6 December 2024)
- ML20211N503 + (02:38:15, 6 December 2024)
- ML20211N502 + (02:38:16, 6 December 2024)
- ML20211N501 + (02:38:16, 6 December 2024)
- 3F0287-13, Forwards Rev 4-09 to Modified Amended Security Plan.Rev Withheld (Ref 10CFR73.21) + (02:38:17, 6 December 2024)
- ML20211N498 + (02:38:17, 6 December 2024)
- ML20211N496 + (02:38:18, 6 December 2024)
- ML20211N493 + (02:38:19, 6 December 2024)
- ML20211N492 + (02:38:20, 6 December 2024)
- ML20211N491 + (02:38:21, 6 December 2024)
- ML20211N490 + (02:38:22, 6 December 2024)
- B12149, Forwards Rev 1 to Inservice Testing Program MP-3 for Pumps & Valves.Encl Listed Valves Under Evaluation for Inclusion in Program & Includes Updated Surveillance Intervals for Tech Specs + (02:38:23, 6 December 2024)
- ML20211N488 + (02:38:23, 6 December 2024)
- 0CAN109706, Forwards Rev 1 to SIR-94-080-A, Relaxation of Reactor Coolant Pump Flywheel Insp Requirements. Rev Consistent W/ NRC + (02:38:24, 6 December 2024)
- ML20211N485 + (02:38:24, 6 December 2024)
- ML20211N484 + (02:38:25, 6 December 2024)
- ML20211N483 + (02:38:26, 6 December 2024)
- ML20211N482 + (02:38:26, 6 December 2024)
- ML20211N480 + (02:38:27, 6 December 2024)
- ML20211N479 + (02:38:27, 6 December 2024)
- ML20211N476 + (02:38:28, 6 December 2024)
- ML20211N475 + (02:38:28, 6 December 2024)
- LR-N970667, Requests Approval of Encl Repair Plan for Nozzle to Safe End Weld Associated W/Plant a Core Spray Loop.Action Necessary to Allow Repair of Through Wall Leak Discovered on Weld N5B on 970919 + (02:38:29, 6 December 2024)
- ML20211N472 + (02:38:30, 6 December 2024)
- ML20211N469 + (02:38:31, 6 December 2024)
- ML20211N468 + (02:38:32, 6 December 2024)
- ML20211N466 + (02:38:33, 6 December 2024)
- ML20211N467 + (02:38:33, 6 December 2024)
- ML20211N464 + (02:38:34, 6 December 2024)
- ML20211N465 + (02:38:34, 6 December 2024)
- ML20211N463 + (02:38:35, 6 December 2024)
- ML20211N460 + (02:38:36, 6 December 2024)
- 2CAN109704, Forwards ANO-2 SG Tube Integrity Evaluation, for NRC Info. ANO-2 SGs Was Last Inspected During Twelfth Refueling Outage Which Ended on 970609 + (02:38:37, 6 December 2024)
- ML20211N458 + (02:38:38, 6 December 2024)
- ML20211N454 + (02:38:39, 6 December 2024)
- ML20211N453 + (02:38:39, 6 December 2024)
- ML20211N452 + (02:38:40, 6 December 2024)
- ML20211N451 + (02:38:40, 6 December 2024)
- NPL-97-0629, Submits Response to Violations Noted in EA & Insp Repts 50-266/96-18,50-301/96-18,50-266/97-05 & 50-301/97-05. Corrective Actions:Rev 3 to DCS 3.1.20, Offsite Power Operability, Was Issued on 970627 + (02:38:41, 6 December 2024)
- ML20211N448 + (02:38:42, 6 December 2024)
- 0CAN109704, Informs That Final Publication Date of TR SIR-94-080 Has Been Delayed Until 971014,due to Miscommunication Between CEOG & Ano.Portion of TS Change Request Submitted on 950404, Re Elimination of Rc Flywheel Isis,Withdrawn + (02:38:43, 6 December 2024)