Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18227D260 + (19:35:11, 5 January 2025)
- ML18227D258 + (19:35:12, 5 January 2025)
- ML18227D237 + (19:35:13, 5 January 2025)
- ML18227D216 + (19:35:14, 5 January 2025)
- ML18227D195 + (19:35:16, 5 January 2025)
- ML18227D196 + (19:35:16, 5 January 2025)
- ML18227D193 + (19:35:17, 5 January 2025)
- ML18227D194 + (19:35:17, 5 January 2025)
- L-75-129, Response to AEC Tech Report WASH-1270 Which Requested to Submit Analysis of Consequences of Atwt Events + (19:35:18, 5 January 2025)
- L-75-113, Advising Inspection of Safety Related Hydraulic Pipe Restraints Were Completed on 02/14/1975 & All 15 Restraints Were in Satisfactory Condition + (19:35:18, 5 January 2025)
- ML18227D188 + (19:35:19, 5 January 2025)
- ML18227D187 + (19:35:20, 5 January 2025)
- ML18227D186 + (19:35:20, 5 January 2025)
- ML18227D185 + (19:35:21, 5 January 2025)
- ML18227D181 + (19:35:22, 5 January 2025)
- ML18227D180 + (19:35:22, 5 January 2025)
- ML18227D179 + (19:35:23, 5 January 2025)
- ML18227D178 + (19:35:23, 5 January 2025)
- ML18227D177 + (19:35:24, 5 January 2025)
- ML18227D176 + (19:35:25, 5 January 2025)
- ML18227D175 + (19:35:25, 5 January 2025)
- ML18227D174 + (19:35:26, 5 January 2025)
- ML18227D172 + (19:35:27, 5 January 2025)
- ML18227D173 + (19:35:27, 5 January 2025)
- ML18227D170 + (19:35:28, 5 January 2025)
- ML18227D171 + (19:35:28, 5 January 2025)
- L-75-475, Provide Information Concerning Steam Generator Water Chemistry Conversion & Integrity of Steam Generator Tube Inspection as Requested + (19:35:29, 5 January 2025)
- ML18227D169 + (19:35:29, 5 January 2025)
- L-75-495, Advising Inspection of Safety Hydraulic Pipe Restraints Was Completed on 9/22/1975, & Both Inside & Outside Reactor Container to Be Operational + (19:35:30, 5 January 2025)
- L-75-547, Advising Inspection of Safety Related Hydraulic Pipe Restraints Located Outside Containment Was Completed on 10/24/1975 & One with Less than Minimum Acceptable Fluid Level Was Replaced with Spare Unit + (19:35:31, 5 January 2025)
- L-75-524, Response to Request for Information on Main Steam Isolation Valves, Advising Information Will Be Submitted by 2/1/1976 + (19:35:31, 5 January 2025)
- L-75-552, Submit Annual Financial Report for 1974 + (19:35:32, 5 January 2025)
- L-75-574, Response to Request for Reviewing Design Bases Reactor Vessel Support System & Feel Design Is Appropriately Conservative + (19:35:32, 5 January 2025)
- ML18227D160 + (19:35:33, 5 January 2025)
- ML18227D157 + (19:35:42, 5 January 2025)
- ML18227D156 + (19:35:42, 5 January 2025)
- ML18227D153 + (19:35:43, 5 January 2025)
- ML18227D152 + (19:35:44, 5 January 2025)
- ML18227D150 + (19:35:44, 5 January 2025)
- ML18227D149 + (19:35:45, 5 January 2025)
- ML18227D148 + (19:35:45, 5 January 2025)
- ML18227D146 + (19:35:46, 5 January 2025)
- ML18227D145 + (19:35:47, 5 January 2025)
- ML18227D144 + (19:35:47, 5 January 2025)
- ML18227D143 + (19:35:48, 5 January 2025)
- L-76-130, Response to Request for Plans to Meet Requirements of Paragraph 50.34a to 10 CFR 50, Forwarding Outline of Accomplishments to Date & Plans + (19:35:49, 5 January 2025)
- L-76-164, Advising FPL Will Conduct Liquid Penetrant & Ultrasonic Volumetric Examinations of Safe End Welds of Inlet & Outlet Nozzles on Unit 4 During Next Refueling Outage During Spring of 1976 + (19:35:49, 5 January 2025)
- L-26-161, Advising Inspection on Safety Related Hydraulic Pipe Restraints Located Outside of Containment on 3/20/1976 Was in Satisfactory Condition + (19:35:50, 5 January 2025)
- L-76-169, Letter Submitting Additional Reload Information Concerning Florida Power and Light Companys Reload Submittal for Core Cycle 3 of Unit 4 + (19:35:51, 5 January 2025)
- L-76-178, Responding to Letter of 4/6/1976, Letter Transmitting Supplemental Information Related to Proposed Modification of Spent Fuel Storage Facility Originally Submitted on January 28, 1976 + (19:35:53, 5 January 2025)
- ML18227D137 + (19:35:55, 5 January 2025)
- L-76-181, Letter Furnishing Additional Information About Inputs FPL Plans to Use to Meet the Paragraph 50.34a Requirements on Appendix I + (19:35:58, 5 January 2025)