ML18227D148

From kanterella
Jump to navigation Jump to search
Advising Inspection of Safety Related Hydraulic Pipe Restraints Located Outside Containment Was Completed N 1/19/1976 & in Satisfactory Condition
ML18227D148
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 02/05/1976
From: Robert E. Uhrig
Florida Power & Light Co
To: Stello V
Office of Nuclear Reactor Regulation
References
L-76-48
Download: ML18227D148 (4)


Text

NRC FORM 195 (2g76)

U.S. NUCLEAR REGULATORV COI4M' DOCKET NUMBER 50-251 NRC DISTR)BUTION FoR PART 50 DOCKET MATERIAL FILE NUMSER TO:

BETTE B ORIGINAL QCOPV Mr. V. Stello

'RC QNOTOBIZED

~NC LASSIF IE D PROP Florida Power 6c Light Co.

Mmami, Fla.

33101 Robert E. Uhrig INPUT FORM DATE OF DOCUMENT 2-5>>76 DATE RECEIVED 2-12-76 NUMSER OF COPIES RECEIVED DEscBIPTIoN Ltr furn info on inspection of saf related hydraulic pipe restraints outside the containment.

~ ~ ~

tQNCLOSU BE ocated DK8I)Il,Rj)lIII))6 C

PLANT NAME:

Turkey Pt. Unit 4 S

FETY FOR ACTION/INFORMATION ENVXRO DHL 76 ASSIGNED AD:

BRANCH CHXHP:

PROJECT MANAGER:

LXC, SST, ASSIGNED AD:

BRANCH CHIEF

~

PROJECT IIANAGHR:.

LIC~ ASST' RHG F PDR I ic>>E

~EM GOSSICK E>> STAFF CA~S

~hHhHF

~QQQZ PROJECT MANAGEMENT BOYD P,

COLLINS HOUSTON PETERSON MELTZ HELTEMES SKOVHOLT INTERNALD ENGINEER N KNXGHT SIHt<EXL PAMLXCKX REACTOR SAFETY ROSS NOVAK ROSZTOCZY CHECK AT6c I SALTZMAN RUTBERG EXTERNALDISTRIBUTION ISTRI BUTION BENAROYA hXHh IPPOLITO OPERATING REACTORS STELLO OPERATING TECH EXSENHUT SHAO BARR SCHNENCHR GRIMES SITE SAFETY Sc HNV RC ANALYSXS DHNTON Sc MULLH ERNST MALLARD SPANGLER SXTE TECH STEPP HULI N

SITE ANALYSIS VOLLlIHR BUNCH-J.

COLLXNS CONTROL NuMBE LPDR'IC NS ASLB am, a

NATL LAB RHG, V"XE LA PDR CONSULTANTS BROOKHAVEN NATL LAB ULRIKSON(ORNL)

NRC FOAM 166 {2-76)

t' k

~

0 1

~ a m

~ ~ ~ ~

l,

P 0 BO 013100'IAMI'LORIDA3310'I Ver (gggIIigPIlI DPCk8$ fg~

FLORIDA POWER 8I LIGHT COMPANY February 5,

1976 L-76-~)8 Director of Nuclear Reactor Regulation Attention:

Mr. Victor Stello, Jr., Director Division of Operating Reactors U. S. Nuclear Regulatory Commission washington, I.

C.

20555

Dear Mr. Stello:

TURKEY POINT UNIT 4 DOCKET NO. 50-251 INSPECTION OF SAFETY RELATED HYDRAULIC PIPE RESTRAINTS LOCATED OUTSIDE CONTAINMENT

~Ci~+iy~

1g rr I%

The subject inspection was completed on January 19, 1976, in accordance with the continuing recluirements of the Directorate of Licensing letter dated November 8, 1973.

All safety related hydraulic pipe restraints located outside containment were in satisfactory condition.

Very truly yours, Vice P..esident REU/MAS/cpc cc:

blr. Norman C. Moseley Jack R.

Newman, Esauire HELPING BUILD FLORIDA

f 0

11