0 NRC DISTRIBUTION FOR PART 50 DOCKET MATERIAL (TEMPORARY FORM)
CONTROL NO:
FILE'ROM.
Florida Power 6 Light Co Miami, Fla Robert E. Uhrig 10-8<<75 10-14-75 xxx DATE OF DOC DATE REC'D LTR TWX RPT OTHER TO:
NRC ORIG 3-signed CC OTHER SENTNRC PDR SENT LOCAL PDR xxx CLASS UNCLASS PROPINFO xxx INPUT NO CYS REC'D 3
DOCKET NO'0-250 an 251 DESCR IPTION:
7
'Ltr re Mro D ~ Elliotts ltr,.~, ~
advising that the work for -Phase I, which
~ is the waste evaporator package phase is scheduled for completion by" 10-15-75
'nd phase II is scheduled for completion on 4-30-76
~ ~, txans the following:
PLANT NAME:
Turkey Point 83 and 4 ENCLOSURES:
List Of Enclosed. Drawings
( 3 cy enc'1 rec'd)
Dist Per D. Elliott FOR ACTION/INFC:Ri'YIIATION 10" 15 "75 JGE BUTLER (L)
W/ Copies CLARK (L)
W/ Copies PARR (L)
W/ Copies KNI EL (L)
W/ Copies SCHWENCER (L)
W/ Copies STOLZ (L)
W/ Copies VASSALLO (L)
W/ Copies PURPLE (L)
W/ Copies ZIEMANN(L)
W/ Copies DICKER (E)
W/ Copies KNIGHTON (E)
W/ Copies
~
YOUNGBLOOD (E)
W/ Copies REID(L)
W/
COPIES REGAN (E)
W/ Copies I EAR (L)
W/ Copies SPIES
'r.m'.
4( 'O~
W/
op(es INTERNALDISTRIBUTION NRC PDR OGC, ROOM P:506A GOSSICK/STAFF CASE GIAMBUSSO BOYD MOORE (L)
DEYOUNG (L)
SKOVHOLT (L)
'OLLER (L) (Ltr)
P. COLLINS DENISE REG OPR FILE & REGION (2)
HIPC TECH REVIEW SCHROEDER MACCARY KNIG HT PAWLICKI SHAO STELLO HOUSTON NOVAK ROSS IPPOLITO TEDESCO J COLLINS LAINAS BEMAROYA VOLLMER DENTON GR I MES.
GAMMILL KASTNER BALLARD SPANGLER ENVIRO MULLER DICKER KNIGHTON YOUNGB LOOD BEGAN
'ROJECT LDR
/
a HAN ESS LIC ASST R. DIGGS (L)
H. GEARIN (L)
E. GOULBOURNE (L)
P. KREUTZE R (E)
J. LEE (L)
M. RU3HBROOK(L)
S. REED (E)
M. SERVICE (L)
S. SH EPPAR D (L)
M. SLATER (E)
H. SMITH (L)
S. TEETS (L)
G. WILLIAMS(E)
V. WILSON (L)
R. INGR "9 (L)
M. DUNCAN A/T IND
~
BRAITMAN SALTZMAN MELTZ PLANS MCDONALD CHAPMAN.
DUBE (Ltr)
E. COUPE PETERSON HARTFIELD (2)
KLECKER EISENHUT WIGGINTON EXTERNAL DISTRIBUTION 1 LOCAL POR )Iiami Fla 1
. TIC (ABERNATHY)
(1)(2)(10) NATIONALLABS 1 NSIC (BUCHANAN) 1 W. PENNINGTON, Rm E-201 GT 1 ASLB 1
CONSULTANTS 1 Newton Anderson NEWMARK/BLUME/AGBA8IAN.
ACRS HOLDING/SENT 1 PD R-SAN/L'A/NY 1 BROOKHAVENNAT LAB 1 G, ULRIKSON ORNL I
ale
1.$0.GX ~
P.Oi BOX 3100 lhl/JAI. FI.OPIO* 331(!I x9Ilgl
':;-'~ ~-" --": t <~i~in~N.
FLORIDA POWER 5 LIGHT COMPANY October 8, 1975 L-75-485
~ Director of Nuclear Reactor Regulation ATTN'oger'oyd, Deput:y Director for Reactor Pro)ects Directorate of Licensing U. S. Nuclear'egulatory Commission Washington, D. C.
20555
~,>, 'i";"ff").
I'.0 a i fiPg 3g )9I
.IArn>T, 9
f"<II-vdlc+
Deax Nr.
Boyd'ei Turkey Point Units 3
6 4
Docket Nos.= 50-250 6 50-251 This letter is in reference to your Hr. D. E13.iott's request. for a description of the new waste handling facility at Turkey Point Plant Units 3 a 4.
Please find enclosed a copy of the.design description o
the facility and a set. of drawings.
The draying numbers and titles are enclosed on a separate sheet.
The work for. this project io being conducted under our plant change/modification number 74-56.
The work for Phase X, which is the waste evaporator package phase, is scheduled for completion on approximately October 15, 1975.
Phase IX, which consists of the solidification system, is ocheduled fox'ompletion on April 30, 1976.
Ãe hope that this information will.be of assistance to you.
Xf you have any questions pleaso contact us.
Very truly yours, IIP-go~
Robext E. Uhrig Vice President
'EU:nch Enclosure ugypn os OgI.I r
ccrc Jack R. Newman, Hsq.
'oo'LQQ c'0 HELPING BUILD FLOFIIDA
f I