ML18227D178
| ML18227D178 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 06/20/1975 |
| From: | Robert E. Uhrig Florida Power & Light Co |
| To: | Anthony Giambusso Office of Nuclear Reactor Regulation |
| References | |
| Download: ML18227D178 (4) | |
Text
~,
NRC DISTRIBUTION FOR PART 50 DOCKET MATERIAL (TEMPORARY FORM)
CONTROL NO:
FILE'951 ERR FROM: Florida Power Ec Light Co Mist(ii, Fla.
33101 DATE OF DOC 6-20-75 DATE R EC'D 6-30-75 LTR TWX RPT OTHER TO:
Mr. A. Giambusso ORIG 1 signed CC OTHER SENT NRC PDR SENT I OCAL PDR XX CLASS UNCLASS PROPINFO INPUT NO CYS REC'D 1
DOCKET NO:
50-251 Ltr furnishing results of inspection of safety related hydraulic pkpe restraints accessible during power operation on 5-29-75....
ENCLOSURES:
PLANT NAME:
Turkey Pt Unit 4 FOR ACTION/INFORMATION DHL 6-3 BUTLER (L)
W/ Copies CLARK (L)
W/ Copies PARR (L)
W/ Copies KNI EL (L)
W/ Copies, SCHWENCER (L)
W/ Copies STOLZ (L)
W/ Copies VASSALLO (L)
W/ Copies PURPLE (L)
W/ Copies ZIEMANN(L)
W/ Copies DICKER (E)
W/ Copies KN I G H TON (E)
W/ Copies YOUNGBLOOD (E)
W/ Copies REGAN (E),,
/ Copies EAP (0 WNCopies SPIES
'/
Copies LPM W/
opies INTERNALDISTRIBUTION Fl DR OGC, ROOM P-506A GOSS I CK/STAF F CASE OC IAiVIRUSSO BOYD MOORE (L)
DEYOUNG (L)
SKOVHOLT (L)
GOLLER (L) (Ltr)
P. COLLINS DENISE REG OPR
@Pi LE B REGION (2)
MIPC TECH REVIEW SCHROEDER MACCARY KNIGHT PAWLICK I SHAO STELLO I-IOUSTON NOVAK ROSS IPPOLITO TEDESCO LONG LAI NAS BENAROYA VOLLMER DENTON G R IMES GAMMILL KASTNER BALLARD SPANGLER ENVIRO MULLER DICKER KNIGHTON YOUNGBLOOD REGAN PROJECT I DR HAR LESS LIC ASST R. DIGGS (L)
H. G EAR IN (L)
E. GOULBOURNE (L)
P. KR E UTZE R (E)
J. LEE (L)
M. MAIGRET (L)
S. REED(E)
M. SERVICE (L)
S. SHEPPARD (L)
M. SLATER (E)
H. SMITH (L)
S. TEETS'(L)
G. WILLIAMS(E)
. WILSON (0
. INGRA~ (L)
M. DUNCAN A/T IND
~
BRAITMAN SALTZMAN MELTZ PLANS Q5CDONALD CHAPMAN.
DUBE (Ltr)
E. COUPE PETERSON HARTF I E LD (2)
KLECKER EISENHUT WlG G INTON EXTERNALDISTRIBUTION
>fLOCALPORMaami Pla.
1 TIO (ABERNATHY)
(1)(2)(10) NATIONALLABS 1 NSIC (BUCHANAN) 1 W. PENNINGTON, Rrn E-201 GT 1 ASLB 1
CONSULTANTS Newton Anderson NEWMARK/8LUME/AGBABIAN QACRS ik&WNNN'SENT 7og,g 1 PD R-SAN/LA/NY 1 BROOKHAVEN NAT LAB 1 G. ULRIKSON ORNL
', g'
~
~
~ h
~
~
~
~
CP.
oo
. O. BOX 013100, MIAMI, FLORIDA 33101 Qll/y~
Aiein Ill FLORIDA POWER & LIGHT COMPANY 4g
+y4'une 20, 1975 L-75-313 pllj ~
JUN80197$ =
IIX QL'A5 KINE IlÃ;II!'"'~I0II 8 ",hs,III
~
. +
IKM S~~"Qe Fife' Mr. Angelo Giambusso, Director Division of Reactor Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear Mr. Giambusso:
'R'eRUfatory Docket TURKEY POINT UNIT NO.
4 DOCKET NO. 50-251 INSPECTION OF SAFETY RELATED HYDRAULIC PIPE RESTRAINTS ACCESSIBLE DURING POWER OPERATION The subject inspection was completed on May 29, 1975, in accordance with the continuing requirements of the Directorate of Licensing letter dated November 8, 1973.
The inspection showed that all restraints were in satisfactory condition.
Ver truly yours, Robert E. Uhrig Vice President REU/HNP/cpc cc:
Mr. Norman C. Moseley Jack R.
Newman, Esquire 8953; HELPING BUILD FLORIDA