ML18227D181

From kanterella
Jump to navigation Jump to search
Letter Results of Inspection of Safety Related Hydraulic Pipe Restraints Accessible During Power Operation
ML18227D181
Person / Time
Site: Turkey Point  
Issue date: 06/02/1975
From: Robert E. Uhrig
Florida Power & Light Co
To: Anthony Giambusso
Office of Nuclear Reactor Regulation
References
Download: ML18227D181 (4)


Text

NRC DISTRIBUTION FOR PART 50 DOCKET MATERIAL (TEMPORARY FORM)

CONTROL NO:

FILE FROM:Florida Power & Light Co.

P.O.

Box 3100, Miami,'la ~

33101 R.E ~hM TO:

Mr. A. Giambusso 6-2-75 ORIG 1 si ned 6-13-75 CC OTHER DATE OF DOC DATE REC'D LTR TWX RPT OTHE R SENT NRC PDR SENT LOCALPDR CLASS UNCLASS PROP(NFO INPUT NO CYS REC'D 1

DOCKET NO:

50-251 DFSCRII TION:

Ltr submitting addi info on ENCLOSURES:

inspection of safety related hydraulicpipe rest aints accessible during power operation on 5-17-75...

PLANT NAME: Turkey Pt. Unit 4

\\

LIltnlt}WISII KKT~

FOR ACTION/INFORMATION D

6-BUTLER (L)

M// Copies CLARK (L)

W/ Copies, PARR (L)

M// Copies KNIEL (L)

W/ Copies SCHWENCER (L)

W/ Copies STOLZ (L)

W/ Copies VASSALLO (L)

W/ Copies PURPLE (L)

W/ Copies ZIEMANN(L)

M// Copies DICKER (E)

M// Copies KNIGHTON (E)

W/ Copies YOUNGBLOOD (E)

M// Copies REGAN (E)

W/ Copies KEAg,(L)

=

W/~opies SPMsS W/ Copies LPM

'RC PDR OGC, ROOM P-506A GOSSI CK/STAF F CASF yCIAMBUSSO BOYD MOORE (L)

DEYOUNG (L)

SKOVHOLT (L)

GOLLL=R (L) {Ltr)

P. COI LINS DENISE EG OPR I LE 5 REGION (2)

MIPC TECH REVIFW SCHROEDE R MACCARY KNIGHT PAM/LICK I SHAO STELLO HOUSTON NOVAK ROSS IPPOLITO TEDESCO LONG LAINAS BENAROYA VOLLMER INTERNALDISTRIBUTION DENTON G R IMES GAMM ILL KASTNER BALLARD SPANGLER LIC ASST R. DIGGS (L)

H. GEAR IN (L)

E. GOULBOURNE (L)

P. KREUTZER (E)

J. LEE (L)

M. MAIGRET(L)

S. REED (E)

M. SERVICE (L)

S. SHEPPARD (L)

M. SLATER (E)

H. SMITH (L)

S. TEETS {L)

G. WILLIAMS(E)

'. WILSON {L)

~. INGRAM (L) fC/P8 ENVIRO MULLER DICKER KNIGHTON YOUNGBLOOD BEGAN PROJECT LDR HAR LESS M,

DU?

EXTERNALDISTRIBUTION A/T IND

~

BRAITMAN SALTZMAN iVIELTZ PLANS

. %MCDONALD CHAPMAN DUBE {Ltr)

E. COUPE PETERSON HARTFIELD (2(

KLECK'ER EISENHUT WlGG INTON LOCALPDR Miami, Fla.

1 TIC. (ABERNATHY)

(1)(2)(10) NATIONALLABS 1 NSIC (BUCHANAN) 1 W. PENNINGTON, Rm E-20'I GT 1 ASLB 1

CONSULTANTS y1 Newton Anderson

'NEWMARK/BLUME/AGBABI'AN Ig AGRs IAowieeesssit'sENT 1 P D R-SAN/LA/NY 1 BROOKHAVENNAT LAB 1 G. ULRIKSON ORNL

>>.>> f',,

~ f>>,

~ f lf'4'I

=

~

~

If

~ >>

~

~,>>

Pi'f "8 ". '-

',>>'.',$ W 0 F(tt "i4.,

3 '

",f'>'r

'l

"~"

>> lf>>>>l"K 4

~

~ '

'l ~" >>

'5 )

4

'ff>>lI 0K'Nk If 4

4 1>>

>> ~4)

\\

>>(

~ "

" >>/

qual>> ~

~

I, 4>>lt

~

BogIIlatory Docket Hji FLORIDA POWER 8I UGHT COMPANY June 2,

1975 L-75-275 Mr. Angelo Giambusso, Director Division of Reactor Licensing Office of Nuclear Reactor Regulation U., S. Nuclear Regulatory Commission Washington, D. C.

20555

Dear Mr. Giambusso:

TURKEY POINT UNIT NO.

4 DOCKET NO. 50-251 INSPECTION OF SAFETY RELATED HYDRAULIC PIPE RESTRAINTS ACCESSIBLE DURING POWER OPERATION The subject inspection was completed on May 17, 1975, in accordance with the continuing requirements of the Directorate of Licensing letter dated November 8,

1973.

The inspection showed that all of the restraints were in satisfactory condition.

Ve r

y yours, Robert E. Uhrig Vice President REU/HNP/cpc cc:

Mr. Norman C. Moseley Jack R.

Newman, Esquire

>o Ol 3

6 HELPING 8UILD FLORIOA

~ 4i (

~

l4

~ ~

P