ML18227D176
| ML18227D176 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 06/30/1975 |
| From: | Robert E. Uhrig Florida Power & Light Co |
| To: | Anthony Giambusso Office of Nuclear Reactor Regulation |
| References | |
| Download: ML18227D176 (4) | |
Text
o NRC DISTRIBUTION FOR PART 50 DOCKET. MATERIAL (TEMPORARY FORM)
CONTROL NO:
7332 FILE FROM:Florida Power 6: Li.ght Co.
Miami, Fla.
33101 6-30-75 7-10-75 DATE OF DOC DATE REC'D LTR TWX RPT OTHER TO:
Mr. A. Giambusso ORIG
,1 signed CC OTHER SENTHRC PDR SENT LOCALPDR CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:
50-251 DESCRIPTION: Ltr furnishing results of the inspection of safety related hydraulic pipe restraints accessible during power operation.....
ENC LOSUR ES:
W858¹VK PLANT NAME:
Turkey Pt. Unit 4 FOR ACTION/INFORMATION DHL 7-11-75 BUTLER (L),
W/ Copies CLARK (L)
W/ Copies PARR (L)
W/ Copies KNIEL (L)
W/ Copies SCHWENCER (I )
W/ Copies STOLZ (I )
W/ Copies VASSALLO (L)
W/ Copies PURPLE (L)
W/ Copies ZlEMANN (L)
W/ Copies DICKER (E)
W/ Copies KNIG HTON (E)
W/ Copies YOUNGBLOOD (E)
W/ Copies REGAN (E)
W/ Copies KEAJ3, (L)
W opies SPXES W/ Copies LPM W/
opuses INTERNALDISTRIBUTION G-R OGC, ROOM P-505A GOSSI CK/STAF F ASE IAMBUSSO BOYD MOORE (L)
DEYOUNG (L)
SKOVHOLT (L)
GOLLER (L) (Ltr)
P. COLLINS DENISE EG OPR ILE 8( REGION (2)
MXPC TECH REVIEW SCHROEDER MACCARY KNIGHT PAW LICK I SHAO STELLO HQUSTON NOVAK ROSS IPPOLITO TEDESCO J,COLLXHS LAI NAS BENAROYA VOLLMER DENTON G R IMES GAMMILL KASTNER BALLARD SPANGLER ENVIRO MULLER DICKER KNIGHTON YOUNGBLOOD REGAN PROJECT LDR HAR LESS LIC ASST R. DIGGS (L)
H. GEARIN (L)
E. GOULBOURNE (L)
P. KR EUTZE R (E)
J. LEE (L)
M.RU3HBZOOZ(L)
S. REED (E)
M. SERVICE (L)
S. SHEPPARD (L)
M. SLATER (E)
H. SMITH (L)
S. TEETS (L)
G. WILLIAMS(E)
V.. WILSON (L) i4. INGRAM (L)
H.
DUHCAH A/T IND
~
BRAITMAN SALTZMAN ME LTZ PLANS fiACDONALD CHAPMAN DUBE (Ltr)
E. COUPE PETERSON HARTFIELD (2)
KLECKER EISENHUT WlGG I NTON EXTERNALDISTR IBUTION LOCALPDR Miami Pla.
1 TIC (ABERNATHY) (I)(2)(10) NATIONALLABS 1 NSIC (BUCHANAN) 1 W. PENNINGTON, Rm E-201 GT 1 ASLB 1
CONSULTANTS P Newton Anderson NEWMARK/BLUME/AGBA8 IAN
/lj(ACRE NgsM&Ntt)/SENT tc Lit. Asst. R. Tcgtsm 5-11-75 1 PD R-SAN/LA/NY 1 BROOKHAVEN NAT LAB 1 G. ULRIKSON ORNL
m I'
~
~
~
~ ~
~
~
iRegulatory Docket File O~
4o~
+G(.
~4gq~o 4'@ 4P~
0~
4, L.
P. O. BOX 013100, MIAMI, FLORIDA 33101
@yVlggj~
/AiiA FLORIDA POWER 8I LIGHT COMPANY June 30, 1975 L-75-239 Mr. Angelo Giambusso, Director Division of Reactor Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear Mr. Giambusso:
ggfi$Q $9~~
gal TURKEY POINT UNIT NO.
4 DOCKET NO. 50-251 INSPECTION OF SAFETY RELATED HYDRAULIC PIPE RESTRAINTS ACCESSIBLE DURING POWER OPERATION The subject inspection was completed on June 19, 1975, in accordance with the continuing requirements of the Directorate of Licensing letter dated November 8,
1973.
The inspection showed that all of the restraints were in satisfactory condition.
Very y yours, Ro ert E. Uhrig Vice President REU/HNP/cpc cc:
Mr. Norman C. Moseley Jack R.
Newman, Esquire HELPING BUILD FLORIDA
I W
%r