Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19206A795 + (05:45:31, 5 January 2025)
- ML19206A794 + (05:45:32, 5 January 2025)
- ML19206A793 + (05:45:33, 5 January 2025)
- ML19206A792 + (05:45:34, 5 January 2025)
- ML19206A791 + (05:45:35, 5 January 2025)
- ML19206A790 + (05:45:36, 5 January 2025)
- ML19206A786 + (05:45:37, 5 January 2025)
- ML19206A784 + (05:45:39, 5 January 2025)
- IR 05000219/2019002 + (05:45:40, 5 January 2025)
- ML19206A783 + (05:45:40, 5 January 2025)
- ML19206A781 + (05:45:42, 5 January 2025)
- 2CAN071902, Request for Alternative ANO 2-PT-002 End-of-Interval System Leakage Test for Extended Reactor Coolant Pressure Boundary Piping + (05:45:43, 5 January 2025)
- ML19206A780 + (05:45:43, 5 January 2025)
- ML19206A776 + (05:45:45, 5 January 2025)
- ML19206A775 + (05:45:46, 5 January 2025)
- ML19206A774 + (05:45:47, 5 January 2025)
- ML19206A773 + (05:45:48, 5 January 2025)
- ML19206A772 + (05:45:49, 5 January 2025)
- ML19206A771 + (05:45:51, 5 January 2025)
- ML19206A769 + (05:45:52, 5 January 2025)
- ML19206A767 + (05:45:53, 5 January 2025)
- ML19206A764 + (05:45:54, 5 January 2025)
- ML19206A762 + (05:45:55, 5 January 2025)
- ML19206A760 + (05:45:56, 5 January 2025)
- ML19206A759 + (05:45:57, 5 January 2025)
- ML19206A758 + (05:45:58, 5 January 2025)
- ML19206A756 + (05:45:59, 5 January 2025)
- ML19206A755 + (05:46:00, 5 January 2025)
- ML19206A754 + (05:46:01, 5 January 2025)
- ML19206A752 + (05:46:02, 5 January 2025)
- ML19206A751 + (05:46:03, 5 January 2025)
- ML19206A750 + (05:46:04, 5 January 2025)
- ML19206A748 + (05:46:06, 5 January 2025)
- ML19206A747 + (05:46:08, 5 January 2025)
- ML19206A746 + (05:46:09, 5 January 2025)
- 05000320/LER-1978-039, /03L-0 on 780523:following Replacement of Vertical Shaft Coupling Identified in LER 78-039/03L-0,diesel Tripped on High Crankcase Pressure.Caused by Plugged Orifice Plate + (05:46:10, 5 January 2025)
- 05000320/LER-1978-040-03, /03L-0 on 780520:control Room Chiller AH-C-8B Failed During Reactor Bldg Isolation & Cooling Surveillance Test.Caused by Defective Micro Switch + (05:46:12, 5 January 2025)
- 05000320/LER-1978-039-03, /03L-0 on 780520: B Diesel Generator Failed to Start During Performance Surveillance Procedure.Caused by Improper Matl Used in Vertical Crank Shaft + (05:46:14, 5 January 2025)
- ML19206A739 + (05:46:16, 5 January 2025)
- ML19206A738 + (05:46:17, 5 January 2025)
- ML19206A737 + (05:46:18, 5 January 2025)
- ML19206A736 + (05:46:19, 5 January 2025)
- ML19206A735 + (05:46:20, 5 January 2025)
- ML19206A734 + (05:46:21, 5 January 2025)
- ML19206A733 + (05:46:22, 5 January 2025)
- 05000320/LER-1978-019-01, /01T-0:on 780328,amplifier Failure Produced Erroneous Readings on Absolute Control Rod Position Indicator for Rod 5 of Group 8.Caused by Misunderstanding + (05:46:24, 5 January 2025)
- 05000320/LER-1978-019, Forwards LER 78-019/01T-0 + (05:46:26, 5 January 2025)
- ML19206A728 + (05:46:27, 5 January 2025)
- 05000320/LER-1978-038-03, /03L-0 on 780512:setting of BS-PS-3260 Was Greater than Allowable Value During Reactor Bldg Isolation & Cooling Injection Surveillance.Caused by Instrument Drift + (05:46:29, 5 January 2025)
- ML19206A726 + (05:46:30, 5 January 2025)
- 05000320/LER-1978-038, Forwards LER 78-038/03L-0 + (05:46:32, 5 January 2025)