Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19225A021 + (20:50:50, 4 January 2025)
- 05000336/LER-1979-016-03, /03L-0 on 790611:pressurizer Pressure Channel for One of Two power-operated Pressurizer Relief Valves Found to Be Reading 250 PSI Lower than Actual Pressure.Caused by Shift at Zero Point.Zero Point Readjusted + (20:50:52, 4 January 2025)
- 05000334/LER-1979-017-03, /03L-0 on 790609:during insp,1B Lhsi Pump Suction Valve from Refueling Water Storage Tank Found Inoperable. Caused by Failure of Motor Operator Torque Switch.Switch Assembly Replaced,Tested & Returned to Svc + (20:50:53, 4 January 2025)
- ML19225A008 + (20:50:56, 4 January 2025)
- ML19225A007 + (20:51:00, 4 January 2025)
- ML19225A005 + (20:51:01, 4 January 2025)
- 05000366/LER-1979-054-03, /03L-0 on 790619:drywell Pressure Exceeded Tech Specs Limit Following Shutdown from Load Reject Test.Caused by Loss of Drywell Cooling from Tripped Chillers.Drywell Venting Returned Pressure Below Limit within 15 Minutes + (20:51:02, 4 January 2025)
- 05000250/LER-1979-022-01, /01T-0 on 790626:loss of 3B 4160 V Bus Would Not Result in Automatic Transfer of Shared D Motor Ctr to Alternative Supply from 4A 4160 V Bus.Operating Procedures Are Being Revised to Correct Situation + (20:51:04, 4 January 2025)
- 05000366/LER-1979-054, Forwards LER 79-054/03L-0 + (20:51:06, 4 January 2025)
- 05000250/LER-1979-022, Forwards LER 79-022/01T-0 + (20:51:08, 4 January 2025)
- 05000366/LER-1979-056-03, /03L-0 on 790620:during Startup Test,Reactor Core Isolation Exhaust & RHR Heat Exchanger Vents to Torus Increased Water Level to 150.9 Inches,Exceeding Tech Specs. Drainage Decreased Water Level Below Limit within One Hour + (20:51:09, 4 January 2025)
- ML19224D830 + (20:51:11, 4 January 2025)
- ML19224D829 + (20:51:13, 4 January 2025)
- 05000336/LER-1979-015-03, /03L-0 on 790610:leak Identified in RCS & Traced to Isolation Valve.Cause Unknown.Isolation Valve Repaired & power-operated Relief Valve Declared Operable + (20:51:15, 4 January 2025)
- 05000366/LER-1979-056, Forwards LER 79-056/03L-0 + (20:51:19, 4 January 2025)
- 05000336/LER-1979-015, Forwards LER 79-015/03L-0 + (20:51:21, 4 January 2025)
- 05000298/LER-1979-014-03, /03L-0 on 790509:chamber Vent Valve for Torus Level Transmitter Was Left Closed.Caused by Technician Error.Vent Valve Opened & PC-LT-12 Placed Back Into Svc + (20:51:25, 4 January 2025)
- ML19224D818 + (20:51:27, 4 January 2025)
- 05000298/LER-1979-014, Forwards LER 79-014/03L-0 + (20:51:28, 4 January 2025)
- ML19224D815 + (20:51:29, 4 January 2025)
- ML19224D813 + (20:51:30, 4 January 2025)
- ML19224D812 + (20:51:31, 4 January 2025)
- ML19224D811 + (20:51:31, 4 January 2025)
- ML19224D809 + (20:51:35, 4 January 2025)
- 05000298/LER-1979-013-03, /03L-0 on 790508:correct Drywell to Suppression Chamber Reading Not Established.Caused by Leaking Inlet Purge Valve.Valve Repaired & Leak Tested + (20:51:36, 4 January 2025)
- 05000298/LER-1979-013, Forwards LER 79-013/03L-0 + (20:51:37, 4 January 2025)
- ML19224D804 + (20:51:38, 4 January 2025)
- 05000321/LER-1979-041-03, /03L-0 on 790624:diesel Generator Tripped While Performing Procedure HNP-1-3801.Cause Not Yet Determined. Procedure Performed Again Successfully.Investigation Is in Progress + (20:51:41, 4 January 2025)
- 05000348/LER-1979-025-03, /03L-0 on 790623:during Surveillance Test FNP-1-STP-256.11 Both Source Range Channels Inadvertently Were Deenergized. Caused by Procedure Deficiency. Power Restored & Procedure Changed + (20:51:42, 4 January 2025)
- ML19224D799 + (20:51:43, 4 January 2025)
- 05000298/LER-1979-012-03, /03L-0 on 790503:vessel Water Temp Increased to 220 F W/Primary Containment Integrity Not Established.Caused by Omission in Operating Procedures.Setpoint of Interlock Verified & Procedures Revised + (20:51:45, 4 January 2025)
- 05000321/LER-1979-041, Forwards LER 79-041/03L-0 + (20:51:47, 4 January 2025)
- ML19224D795 + (20:51:49, 4 January 2025)
- 05000298/LER-1979-012, Forwards LER 79-012/03L-0 + (20:51:50, 4 January 2025)
- ML19224D792 + (20:51:52, 4 January 2025)
- ML19224D790 + (20:51:52, 4 January 2025)
- ML19224D788 + (20:51:53, 4 January 2025)
- ML19224D787 + (20:51:54, 4 January 2025)
- ML19224D786 + (20:51:54, 4 January 2025)
- 05000333/LER-1979-038-03, /03l-0 on 790611:main Steam Line Tunnel High Temp Detectors 02-TS-121A Through 02-TS-124D Could Not Be Demonstrated as Fully Operable Due to Calibr Failure of Instrument 02-TIC-200 + (20:51:56, 4 January 2025)
- ML19224D784 + (20:51:58, 4 January 2025)
- 05000346/LER-1979-067-01, /01T-0 on 790628:short Circuit Caused Loss of Essential Bus Y4 Sypplying Power to Safety Feature Actuation Sys.Blown Inverter Fuse Was Replaced & Y4 Bus Returned to Normal Supply + (20:51:59, 4 January 2025)
- ML19224D781 + (20:52:00, 4 January 2025)
- ML19224D780 + (20:52:00, 4 January 2025)
- 05000333/LER-1979-038, Forwards LER 79-038/03L-0 + (20:52:02, 4 January 2025)
- 05000346/LER-1979-067, Forwards LER 79-067/01T-0 + (20:52:05, 4 January 2025)
- ML19224D772 + (20:52:07, 4 January 2025)
- ML19224D769 + (20:52:08, 4 January 2025)
- ML19224D771 + (20:52:08, 4 January 2025)
- ML19224D768 + (20:52:09, 4 January 2025)
- ML19224D767 + (20:52:10, 4 January 2025)