MONTHYEARBSEP-99-0168, Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with ML20212D0431999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Brunswick Steam Electric Plant,Units 1 & 2 ML20210R1191999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Bsep,Units 1 & 2 BSEP-99-0118, Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with ML20210R1311999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Bsep,Unit 2 BSEP-99-0095, Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-99-0075, Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With BSEP-99-0059, Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-99-0043, Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-99-0005, Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0231, Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0218, Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with BSEP-98-0202, Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0185, Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0164, Monthly Operating Repts for July 1998 for BSEP Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for BSEP Units 1 & 2 BSEP-98-0142, Monthly Operating Repts for June 1998 for BSEP Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for BSEP Units 1 & 2 ML20151S9041998-05-31031 May 1998 Revised Pages to Monthly Operating Rept for May 1998 for Brunswick Steam Electric Plant,Unit 1 BSEP-98-0129, Monthly Operating Repts for May 1998 for Bsep,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Bsep,Units 1 & 2 ML20151S8991998-04-30030 April 1998 Revised Pages to Monthly Operating Rept for Apr 1998 for Brunswick Steam Electric Plant,Unit 1 BSEP-98-0104, Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-98-0080, Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 2 BSEP-98-0055, Monthly Operating Repts for Feb 1998 for Brunswick Steam Electric Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-98-0038, Monthly Operating Repts for Jan 1998 for Brunswick Steam Electric Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-98-0007, Monthly Operating Repts for Dec 1997 for Brunswick Steam Electric Plant,Unit 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Brunswick Steam Electric Plant,Unit 1 & 2 BSEP-97-0528, Monthly Operating Repts for Nov 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0500, Monthly Operating Repts for Oct 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0456, Monthly Operating Repts for Sept 1997 for Brunswick Steam Electric Plant1997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Brunswick Steam Electric Plant BSEP-97-0410, Monthly Operating Repts for Aug 1997 for Bsep,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Bsep,Units 1 & 2 BSEP-97-0373, Monthly Operating Repts for Jul 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0323, Monthly Operating Repts for June 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0266, Monthly Operating Repts for May 1997 for Brunswick Steam Electric Plant Units 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Brunswick Steam Electric Plant Units 1 & 2 BSEP-97-0219, Monthly Operating Repts for Apr 1997 for Brunswick Steam Electric Plant,Units 1 & 21997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-97-0142, Monthly Operating Repts for March 1997 for Bsep,Units 1 & 21997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Bsep,Units 1 & 2 BSEP-97-0105, Monthly Operating Repts for Feb 1997 for Bsep,Units 1 & 21997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Bsep,Units 1 & 2 BSEP-97-0055, Monthly Operating Repts for Jan 1997 for Brunswick Steam Electric Plant Units 1 & 21997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Brunswick Steam Electric Plant Units 1 & 2 ML20138H7881996-12-31031 December 1996 Corrected Monthly Operating Rept for Dec 1996 for Brunswick Unit 1 BSEP-97-0015, Monthly Operating Repts for Dec 1996 for Brunswick Steam Electric Plant Units 1 & 21996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Brunswick Steam Electric Plant Units 1 & 2 BSEP-96-0451, Monthly Operating Repts for Nov 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Brunswick Steam Electric Plant,Units 1 & 2 ML20138H7821996-11-30030 November 1996 Corrected Monthly Operating Rept for Nov 1996 for Brunswick Unit 1 BSEP-96-0422, Monthly Operating Repts for Oct 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-96-0375, Monthly Operating Repts for Sept 1996 for Brunswick Steam Electric Plant Unit 1 & 21996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Brunswick Steam Electric Plant Unit 1 & 2 BSEP-96-0330, Monthly Operating Repts for Aug 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-96-0295, Monthly Operating Repts for July 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-07-31031 July 1996 Monthly Operating Repts for July 1996 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-96-0253, Monthly Operating Repts for June 1996 for Brunswick Steam Electric Plant Units 1 & 21996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Brunswick Steam Electric Plant Units 1 & 2 BSEP-96-0236, Monthly Operating Repts for May 1996 for Brunswick Steam Electric Plant Units 1 & 21996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Brunswick Steam Electric Plant Units 1 & 2 BSEP-96-0204, Monthly Operating Repts for April 1996 for BSEP1996-04-30030 April 1996 Monthly Operating Repts for April 1996 for BSEP BSEP-96-0146, Monthly Operating Repts for Mar 1996 for Brunswick Steam Electric Plant,Units 1 & 21996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Brunswick Steam Electric Plant,Units 1 & 2 BSEP-96-0097, Monthly Operating Repts for Feb 1996 for BSEP1996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for BSEP BSEP-96-0053, Monthly Operating Repts for Jan 1996 for BSEP Units 1 & 21996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for BSEP Units 1 & 2 BSEP-96-0008, Monthly Operating Repts for Dec 1995 for Brunswick Steam Electric Plant1995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Brunswick Steam Electric Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N3271999-10-21021 October 1999 Part 21 Rept Re non-linear Oxygen Readings with Two (2) Model 225 CMA-X Containment Monitoring Sys at Bsep.Caused by High Gain Produced by 10K Resistor Across Second Stage Amplifier.Engineering Drawings Will Be Revised BSEP-99-0168, Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with ML20212D0431999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Brunswick Steam Electric Plant,Units 1 & 2 ML20210P9441999-08-10010 August 1999 Safety Evaluation Accepting Licensee Assessment of Impact on Operation of Plant,Unit 1,with Crack Indications of 2.11, 6.36 & 1.74 Inches in Three Separate Jet Pump Risers ML20210P9181999-08-10010 August 1999 Safety Evaluation Authorizing Request for Reliefs CIP-01,02, 06,07,08,09,10 & 11 (with Certain Exceptions) & 12-18,for Second 10-year ISI Interval.Request CIP-04 & 05 Would Result in hardship,CIP-03 Not Required & CIP-11 Denied in Part ML20210N2341999-08-0505 August 1999 SER Accepting Response to NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issues (USI) A-46 ML20210R1191999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Bsep,Units 1 & 2 ML20210R1311999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Bsep,Unit 2 BSEP-99-0118, Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with BSEP-99-0095, Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20210M8581999-05-14014 May 1999 B214R1 RPV Hydrotest Bolted Connection Corrective Action Evaluation, Rev 0 ML20211L3711999-05-10010 May 1999 Rev 0 to ESR 98-00333, Unit 2 Invessel Feedwater Sparger Evaluation ML20206G1871999-05-0404 May 1999 Safety Evaluation Approving Third 10-year ISI Program Requests for Relief (RR) RR-08,RR-15 & RR-17 BSEP-99-0075, Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With ML20206N1791999-04-23023 April 1999 Rev 0 to 2B21-0554, Brunswick Unit 2,Cycle 14 Colr BSEP-99-0059, Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20205F9031999-03-30030 March 1999 Safety Evaluation Supporting Proposed Rev to BSEP RERP to Licenses DPR-62 & DPR-71,respectively ML20206N1831999-02-28028 February 1999 Rev 0 to Suppl Reload Licensing Rept for Bsep,Unit 2 Reload 13 Cycle 14 BSEP-99-0043, Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20203D7061999-02-0909 February 1999 SER Accepting Proposed Alternatives Contained in Relief Requests PRR-04,VRR-04,VRR-13,PRR-01,PRR-03,VRR-01.VRR-07, VRR-08 & VRR-09 Denied BSEP-99-0005, Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0231, Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With BSEP-98-0218, Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with BSEP-98-0210, Special Rept:On 980824,temp Element 2-CAC-TE-1258-22 Failed. Cause of Failed Temp Element Cannot Be Conclusively Determined.Temp Element Will Be Replaced & Cable Connections Repaired1998-10-30030 October 1998 Special Rept:On 980824,temp Element 2-CAC-TE-1258-22 Failed. Cause of Failed Temp Element Cannot Be Conclusively Determined.Temp Element Will Be Replaced & Cable Connections Repaired ML20154P8151998-10-16016 October 1998 SER Accepting Revised Safety Analysis of Operational Transient of 920117,for Plant,Unit 1 ML20154P8591998-10-16016 October 1998 SER Accepting Equivalent Margins Analysis for N-16A/B Instrument Nozzles for Plant,Units 1 & 2 BSEP-98-0202, Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20151Y6211998-09-14014 September 1998 BSEP Rept Describing Changes,Tests & Experiments, for Bsep,Units 1 & 2 ML20151Y6371998-09-14014 September 1998 Changes to QA Program, for Bsep,Units 1 & 2 BSEP-98-0185, Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With1998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With ML20151T5021998-08-0505 August 1998 Project Implementation Plan, Ngg Yr 2000 Readiness Program, Rev 2 BSEP-98-0164, Monthly Operating Repts for July 1998 for BSEP Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for BSEP Units 1 & 2 ML20236T1961998-07-0101 July 1998 Rev 1 to 2B21-0088, Brunswick Unit 2,Cycle 13 Colr ML20236T1921998-07-0101 July 1998 Rev 1 to 1B21-0537, Brunswick Unit 1,Cycle 12 Colr BSEP-98-0142, Monthly Operating Repts for June 1998 for BSEP Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for BSEP Units 1 & 2 ML20236T1971998-06-30030 June 1998 Rev 2 to 24A5412, Supplemental Reload Licensing Rept for Brunswick Steam Electric Plant Unit 2 Reload 12 Cycle 13 ML20249B9691998-06-11011 June 1998 Rev 1 to VC44.F02, Brunswick Steam Electric Plant,Units 1 & 2,ECCS Suction Strainers Replacement Project,Nrc Bulletin 96-003 Final Rept BSEP-98-0129, Monthly Operating Repts for May 1998 for Bsep,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Bsep,Units 1 & 2 ML20151S9041998-05-31031 May 1998 Revised Pages to Monthly Operating Rept for May 1998 for Brunswick Steam Electric Plant,Unit 1 BSEP-98-0104, Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Brunswick Steam Electric Plant,Units 1 & 2 ML20151S8991998-04-30030 April 1998 Revised Pages to Monthly Operating Rept for Apr 1998 for Brunswick Steam Electric Plant,Unit 1 ML20247N7501998-04-30030 April 1998 Rev 0 to BSEP Unit 1,Cycle 12 Colr ML20247N7721998-04-30030 April 1998 Rev 0 to J1103244SRLR, Supplemental Reload Licensing Rept for BSEP Unit 1,Reload 11,Cycle 12 ML20217K8461998-04-24024 April 1998 Safety Evaluation Approving Proposed Use of Code Case N-535 at Brunswick Unit 1 During Second 10-yr Interval,Pursuant to 10CFR50.55a(a)(3)(i).Authorizes Use of Code Case N-535 Until Code Case Included in Future Rev of RG 1.147 ML20217K3941998-04-24024 April 1998 SER Approving Relief Request for Pump Vibration Monitoring, Brunswick Steam Electric Plant,Units 1 & 2 ML20217E6841998-04-23023 April 1998 Safety Evaluation Accepting Code Case N-547, Alternative Exam Requirements for Pressure Retaining Bolting of CRD Housings ML20217E7471998-04-21021 April 1998 Safety Evaluation Accepting Alternative to Insp of Reactor Pressure Vessel Circumferential Welds ML20217B5241998-04-20020 April 1998 SE Accepting Licensee Request for Approval to Use Alternative Exam Requirement for Brunswick,Unit 1,reactor Vessel Stud & Bushing During Second 10-yr ISI Interval Per 10CFR50.55a(a)(3)(ii) BSEP-98-0080, Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Bsep,Units 1 & 2 ML20216B1041998-03-0404 March 1998 SER Approving Alternative to Insp of Reactor Pressure Vessel Circumferential Welds for Brunswick Steam Electric Plant, Unit 1 1999-09-30
[Table view] |
Text
'
I APPENDIX B AVERAGE DAILY POWER LEVEL DOCKET NO. 050-0325 UNIT oRUNSWICK UtlIT I DATe 07/02/79 COMPLETED BY EULIS WILLIS TELEPHOrlE 919-457-6701 JUNE 79 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL U4WE-r!ET) (MWE-NET) 1 0. 17 785.
2 0. Ic 787.
3 0. 19 785.
4 0. 20 789.
5 O. 21 789.
6 0. 22 791 7 0. 23 784 d O. 24 786.
9 0 25 783.
10 81. 26 781.
11 572. 27 722.
12 683. 28 510.
13 765. 29 702.
14 671. 30 749, 15 785.
16 784 790717063/ 1.16 - 8 35g 7q3
OPERATING DATA REPORT DOCKET NO. 050-0325 DATE 07/02/79 COMPLETED BY EULIS WILLIS TELEPHONE 919-457-9521 OPERATING STATUS
- 1. UNIT NAME: BRUNSWICK UNIT I I NOTES I
- 2. REPORTING PERIOD: JUNE 79 I I
- 3. LICENSED THERMAL POWER (MNT): 2436 I I
- 4. NAMEPLATE RATING (GROSS MWE): 867.0 I I
- 5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 I I
- 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I I
- 7. MAX DEPENDABLE CAPACITY (NET MPIE): 790.0 -- =
- d. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7 ) SINCE LAST REPORT, GIVE REASONS:
- 9. PorER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): NONE
- 10. REASONS FOR RESTRICTION IF ANY:
YHIS YR TO CUuUL MONTH DATE ATIVE
- 11. HOURS IN REPORTING PERIOD 720.0 4343.0 20040.0
- 12. NUMBLJ OF HOURS REACTOR WAS CRITICAL 505.6 1731.4 14042.0
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1647.1 14 HOURS GENERATOR ON LINE 488.9 1591.3 13141.6
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 1.0 0.0
- 15. GROSS THERMAL ENERGY GENERATED (MWM) Il336c_.9 3433325.3 27380516.5
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 369625.0 1144048.0 9075325.0
- 18. NET ELECTRICIAL ENERGY GENERATED (MWH) 354645.0 1093959.0 8732557.0
- 19. UNIT SERVICE FACiOR 67.9 35.7 65.6
- 20. UNIT AVAILABILITY FACTOR 67.9 36.7 65.6
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 62.3 31.9 55.2
- 22. UNIT CAP ACITY FACTOR (USING DER NET) co.O 30.7 53.1
- 23. UNIT FORCED OUTAGE RATl 0.0 7.0 21.9
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTES (TYPE, DAfE, AND DUR ATION OF EACH):
Support Inspection : 790728 96 Hours
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 0/ o / 0
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERICIAL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY -------- --------
INITI AL ELECTRICITY -------- -----
COMMERICIAL OPERATION ---- - - - - - - - -
. _ . 1.16 - 9 356 23g
s i 1 l 2 a s r .
od e - s .
l l 5 a f eh et G f i 9 o g w e (i c rf E k 9 W 7
- t nno t b e f i R iI t sl - d1if sh U 5 c 7 . 5 dc m iint 2 i 9 A 4 r L a3d oas N 3 w 1 ii rm o suii m o w (
0 s s ) gsCf sP sl - d u s yb n l mw l e e le
- n y i 9 ea et a s a si e 0 u l l 1 i& riCeasn rneiin nt nF c 5 r u u 9 eeE es rnaae eorvao ioae) c r
u 0 B J E ( e e h sU pydt a t
l es d st h wieeci tc fLDiR S
o v c 0 nsar eee t wr t . ur o E
i n m1 eanicht gt si ef d ts nf(
rL o e O,FEYE tc e o nd s gh d e m h wauitqncna Ino e r od t ntd k is t a N AMTBNADO r
r tor on ce u rnw f o ) seshlht eah i ari t oud A r o
- tae : o ep r
S T ND i d rsricf c cnpnn Gahe r -
E El TP Coi R d seee eie d e A pi a .
w pSR I
KT t
E E &t ct enierCshree p ut e e i e ) it
.sn I b r yt b CN L L eAn s e t of nt R w sr s , c r ipr n1 i aiiisNe h h O P E yei n e e6 D U u v rt t g osi x ro tnv1 x e h nlhu MT C a
P r aanneet olTq i y) civ l1 sr w EfEE0 E O pceEhh a e di4 eye e C eid - t t t ,u . r er hl s m4 5 sfit ast s . rof t a i i cf ,h ccnsnit o no t sd seonti aonwuc aot t o ,ir oo qal o nat r wmriwiyt e ohetf edit tid ef a sd v t epciiimedct rstd ee o ioeen ik prvd rosneu et t srrd nauAed esaoph h a ac u a.
U ms( ravib css Tsab st r S
N t O
I r m T o <
a )n r
C p mci a U 9 7
ef.3O gou p u
aSl r cp D 9 S cix St aE E 1 l R la m oe(r s a uu R e- nnt E " ?O a a uth W J
" hgm Z Z
M14O A-O 234 P
D l i
3 N T A N S O c a N M et s t W T n nr o O R e e c e v p A iE / n D O L R N o T P i u E ta l
i R in S m T a I
N hl5 =M6 E x
U E~ Z ;
1
)
n e )
_j23e ia n in lp e a x
c l p
niL x E o 345 D
( t e e rT s
ic&
t ig I
(
s u
lif tr n s su) e u ao u es in F e Rai v1 l
a
?gE 4 snn c r t yT a lap i3j 2 ea gr or tr n%
o1 7 mnnt o smi(
el at pt cl a i
t as 3
nino o u i 't geneh u < i. r e s ig a e e pd pt a
,&e S el -M.rrDI R- R- O A. O O.
rat :'
1 GI I 2
e t
a 6 2
D 5 0
' d e
9 7 d lu ed rc he o c fS )
2 7
% 1 fS 7 0
. se j ) _s fg ~'s^ '
APPENDIX .
D()CKET N0i, 050-0325
(~ ,
IJNIT Brunswick No. 1 DATE Julv '1979 COMPLETED BY Eulis A. Willis OPERATIONS
SUMMARY
Brunswick Na,1 Brunswick Unit No. 1 operated at a 62.3% capacity factor for the month of June.
The following power changes and shutdowns occurred during the month:
May 26: Unit was separated from grid for the first 231 hours0.00267 days <br />0.0642 hours <br />3.819444e-4 weeks <br />8.78955e-5 months <br /> of the month for inspections and modifications of pipe supports.
June 13: Power reduction for valve testing and rod shuffle.
June 21: Power reduction for condenser waterbox work.
For more information on individual outages, see the Unit Shutdowns and Power Reductions Logs for the month of June.
Availability factor for the month was 67.9%.
i There are 154 PWR spent fuel assemblies and 320 BWR spent fuel assemblies stored in the BSEP 1 spent fuel pool.
7C' nn JJO t o ull
I APPENDIX E AVERAGE DAILY POWER LEVEL DOCKET NO. 050-0324 UNIT BRUPISWICK UNIT 2 DATE 07/02/79 COMPLETED BY EULIS WILLIS TELEPHONE 919-457-6701 JUNE 79 DAY AVG. DAILY POWER LEVEL JAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 0. 17 515.
2 0. 18 585.
3 0. 19 636.
4 C. 20 369.
5 O. 21 407 6 0. 22 499 7 0. 23 627.
8 0. 24 666.
9 0. 25 647 10 0. 26 4 88.
11 0. 27 629.
12 63. 28 539.
13 195. 29 525.
14 365. 30 0.
15 403.
16 434 1.16 - 8 }Sh 2N
OPERATING DATA REPORT DOCKET NO. 050-0324 DATE 07/02/79 COMPLETED BY EULIS WILLIS TELEPHONE 919-457-9521 OPERATING STATUS
- i. UNIT NAME: BRUNSWICK UNIT 2 I NOTES I
- 2. REPORTING PERIOD: JUNE 79 I I
- 3. .ICENSED THERMAL POWER (MNT): 2436 I I
- 4. NAMEPLATE RATING (GROSS MWE): 867.0 I I
- 5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 I I
- 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 315.0 I I
- 7. MAX DEPENDABLE CAPACITY (NET MWE): 790.0 - - - - - - - - - - - - - - -- - - - -
- d. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9 POWER LEVEL TO WHICH RESTRICTED IF ANY ( NET M WE ) : NONE
- 10. REASONS FOR RESTRICTION IF ANY:
THIS YR TO CUMUL MONTH DATE ATIVE II. HOURS IN REPORTING PERIOD 720.0 4343.0 32064.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 440.1 2120.3 21408.5
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 14 HOURS CENERATOR ON LINE 17.3 1959.1 20088.2
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 637190,.7 3568754.5 36036588.7
- 17. GROSS ELECTRICAL ENERGY GENERATED (.MWH) 214439.0 1217895.0 12034222.0
- 18. NET ELECTRICIAL ENERGY GENERATED (MWH) 204035.0 1163469.0 11551681.0
- 19. UNIT SERVICE FACTOR 56.6 15 .1 62.7
- 20. U'rII AVAILABILITY FACTOR 56.6 45.I 62.7
- 21. UNIT CAPACITY FACIDR (USING MDC NET) 35.9 33.9 45.6 2 .' . UdIT CAPACITY FACTOR (USING DER NET) 34.5 32.6 43.9
- 23. ' TIT FORCED OUTAGE RATE 4.1 4.1 14.1
- 24. iUTDOWNS SCHEDULED DVER NEXT 6 MONTHS (TYPE, DATE, AND DUP ATION OF EACH):
Support Inspection: 780831 96 Hours
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTI?.ATED DATE OF START UP: 7/ 5/79
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERICIAL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY - - - - - - - - -- ---
INITIAL ELECTRICITY - - - - - - - - --------
COMMERICIAL OPERATION -------- --
1.16 - 9
[) Sib 2b
~
050-0324 UNIT SililTDOWNS AND POWER REDUCTIONS DOCKETNO. _
brunswick st 4 UNIT N AME DATE July 19/9 REPORT MONTil June 1979 COMPLETED BY Eulis A. Willis TELEPHONE (919) 457-9521 .
"i -
=_ r. 5 u, = E L Ee s 7sa Licensee bo g*L A. & Correceive No- Date g 3g 4 jg5 Fvent E7 MV Action to
" 5 $0
$5 ji g Report # bcVent Recurrence S
009 790525 S 419.1 0 1 N/A ZZ Support Unit was separated from the grid to make modifications on 10 seismic supports identified when UE6C *
(Architect-Engineer) was performing a review of the stress analysis. In addition, the NRC required CP&L to verify that the seismic stress isomet-rics, on which the analysis was based,
'_]j actually reflected as-built conditions, g I These changes and inspections required that the unit be shut down.
p) The required inspections were made q satisfactorily. An additional 37 (for
@. a total of 47) supports were modified based on the continu.ing review of the stress analysis, and the unit was re-turned to service. Additional shifts and overtime were worked.
t 2 3 F: Forced 4
Reason: Method:
S: Scheduled Exhibis G . Instructions A 1 quipment Failure (E= plain) 1 Manual for Preparation of Data ll Maintenance of Test 2 Manual Scram. Entry Shecis for Licensee C Rerucling 3 Automatic Scram. Event Report (LER) File (NUREG.
D Regniator> Resisielion 4 Other (Explain) 0161) 1:-Operator Traimog & Ucense Examination I -Adonnistrative 5 G-Og-crational Emn (1:xplain) Extilbli 4. Same Source eII77) Il-Oihen lihplain)
- DOCKET NO. 050-0324 UNIT S!!UTDOWNS AND POWER REDUCTIONS UNIT N AME Brunswick f/2 DATE July 1979 REPORT MONTil June 1979 COMPLETED BY Eulis A. Willis TELEPHONE (919) 457-9521-5 "i
-, !E 3 Ek Licensec h % Cause & Corrective N"- DJte R 5?
E
? 2s5 Event ::5 Ti Nu Do Action to
$ :. j5g Report
010 790612 F 17.2 A 3 N/A CD Valvex Reactor scram becausa of an indicated MSIV closure. MSIV closure caused by blown fuses on F022D. An invesfigation revealed a wiring error which led to the scram when en intermittent ground occurred on the DC system.
The wiring problem was corrected and all other MSIVs were checked and found j normal. A recorder has been connected n to the battery ground detector to Cs monitor for intermittent grounds. A procedure is being developed to isolate ano remove battery grounds. This in-I' 3 cident will be reviewed with all 16C g Technicians and Electricians, and the importance of making correct termina-tions will be stressed.
I 2 3 4 F: Forced Reason: Method:
S Scheduled Exhibit G Instructions A.I quipment Failure (Explain) 1-Mancal for Preparation of Data ll-Maintenance of Test 2-M.r.ual Scram. En:ry Sheets for Licensee C Refueling 3#atomatic Scram. Event Report (LER) File (NUREG-D-Regulatory Resnietion 4-Other (Explain) 0161)
I: Operator Trainmg a Ucense Examination 12 Administrative 5
G Operational 1:nm (lixplain) Exhibii 1 Same Sou ce r8l77) Il-Osl.ca IIisplain)
APPENDi~ -
^' DOCKET NO. 050-0324 UNIT Brunswick No. 2 114TE July 1979 COMPLETED BY Eulis A. Willis OPERATIONS
SUMMARY
Brunswick No. 2 Brunswick Unit No. 2 operated at a 35.9% capacity factor for the month of June. The following power changes and shutdowns occurred during the month:
May 25: Unit was separated from grid for the first 270 hours0.00313 days <br />0.075 hours <br />4.464286e-4 weeks <br />1.02735e-4 months <br /> of the month for inspections and modifications of pipe supports.
June 11: Reactor scram because of blown fuses on an MSIV.
June 25: Power was reduced for condenser waterbox work.
June 29: Separated from grid for pipe support inspections and modifications.
For more information on individual outages, see the Unit Shutdowns and Power Reductions Logs for the month of June. Unit availability factor--56.6%.
The unit is expected to return to service on July 5.
There are 28 FWR spent fuel assemblies and 132 BWR spent fuel assemblies in the BSEP #2 spent fuel pool.