Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19254F338 + (10:41:52, 4 January 2025)
- ML19254F337 + (10:42:02, 4 January 2025)
- ML19254F336 + (10:42:04, 4 January 2025)
- ML19254F334 + (10:42:07, 4 January 2025)
- ML19254F333 + (10:42:09, 4 January 2025)
- ML19254F332 + (10:42:12, 4 January 2025)
- ML19254F331 + (10:42:13, 4 January 2025)
- ML19254F330 + (10:42:15, 4 January 2025)
- ML19254F329 + (10:42:20, 4 January 2025)
- ML19254F328 + (10:42:23, 4 January 2025)
- ML19254F326 + (10:42:25, 4 January 2025)
- ML19254F325 + (10:42:28, 4 January 2025)
- ML19254F323 + (10:42:31, 4 January 2025)
- ML19254F322 + (10:42:39, 4 January 2025)
- ML19254F321 + (10:42:45, 4 January 2025)
- ML19254F320 + (10:42:47, 4 January 2025)
- IR 05000546/1979017 + (10:42:53, 4 January 2025)
- ML19254F318 + (10:42:56, 4 January 2025)
- ML19254F317 + (10:42:58, 4 January 2025)
- ML19254F315 + (10:43:00, 4 January 2025)
- IR 05000344/1979015 + (10:43:04, 4 January 2025)
- ML19254F313 + (10:43:09, 4 January 2025)
- ML19254F312 + (10:43:12, 4 January 2025)
- ML19254F311 + (10:43:15, 4 January 2025)
- ML19254F310 + (10:43:17, 4 January 2025)
- ML19254F308 + (10:43:19, 4 January 2025)
- ML19254F307 + (10:43:23, 4 January 2025)
- ML19254F306 + (10:43:24, 4 January 2025)
- ML19254F304 + (10:43:25, 4 January 2025)
- ML19254F303 + (10:43:31, 4 January 2025)
- ML19254F302 + (10:43:33, 4 January 2025)
- ML19254F301 + (10:43:41, 4 January 2025)
- ML19254F299 + (10:43:44, 4 January 2025)
- ML19254F298 + (10:43:48, 4 January 2025)
- ML19254F290 + (10:43:50, 4 January 2025)
- 05000336/LER-1979-028-03, /03X-1:on 790904,during Routine Power Operation, Hydraulic Snubber on Main Stream Atmospheric Dump Valve B Declared Inoperable.Caused by Personnel Breaking Fluid Reservoir & Fatigue Failure of Reservoir Outlet Nipple + (10:44:30, 4 January 2025)
- 05000295/LER-1979-071-03, /03L-0:on 791002,control Room Air Intaker Particulate Radiation Monitor Failed to Respond to Check Source.No Cause Found.Monitor Returned to Svc + (10:44:43, 4 January 2025)
- 05000317/LER-1979-058-03, /03L-0:on 791004,component Cooling Heat Exchanger 11 Removed from Svc for Corrective Maint on Operator for Heat Exchanger Salt Water Outlet Valve 1-CV-5206.Valve Would Not Open Due to Faulty Pneumatic Converter.Adjustments M + (10:45:16, 4 January 2025)
- 05000295/LER-1979-071, Forwards LER 79-071/03L-0 + (10:45:23, 4 January 2025)
- 05000317/LER-1979-058, Forwards LER 79-058/03L-0 + (10:45:43, 4 January 2025)
- 05000295/LER-1979-073-03, /03L-0:on 790927,condenser Air Ejector Offgas Radiation Monitor Failed Low.Caused by Improperly Connected Cam Controlling Movement of Check Source.Connection Repaired & Monitor Returned to Svc + (10:45:55, 4 January 2025)
- 05000295/LER-1979-073, Forwards LER 79-073/03L-0 + (10:45:59, 4 January 2025)
- 05000254/LER-1979-029-03, /03L-0:on 790929,false High Radiation Signal Automatically Started Reactor Bldg Ventilation Sys & Standby Gas Treatment Sys.Caused by Burned Coil on Relay 1-1705-101. Relay Coil Replaced + (10:46:06, 4 January 2025)
- ML19254F274 + (10:46:08, 4 January 2025)
- ML19254F273 + (10:46:10, 4 January 2025)
- 05000254/LER-1979-029, Forwards LER 79-029/03L-0 + (10:46:13, 4 January 2025)
- ML19254F270 + (10:46:15, 4 January 2025)
- ML19254F269 + (10:46:16, 4 January 2025)
- ML19254F268 + (10:46:17, 4 January 2025)
- 05000336/LER-1979-023-03, /03X-1:on 790803,seismic Bracings for Cells in 201A & B Batteries Removed to Allow Insp.Batteries Declared Inoperable.Caused by Reduction in Cell Voltages. Replacement of 201A Battery complete;201B Work in Progress + (10:46:20, 4 January 2025)
- 05000336/LER-1979-023, Forwards LER 79-023/03X-1 + (10:46:27, 4 January 2025)