Final Deficiency Rept Re Lengths on Containment Bldg Prestressing Tendon Wires.Nonconforming Tendons Removed & Production Equipment at Inryco Wiremil Modified to Eliminate Source of Unacceptable Wire Length Variations
ML19254F268
Person / Time
Site: Midland
Issue date: 10/31/1979
From: Howell S
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
References
HOWE-281-79, NUDOCS 7911070447
Download: ML19254F268 (2)


Text

.

J O Power Q@ consumers Company *;:::"";,": L, -

General offices: 1945 West Pernall Road, Jackson, Michigan 49203 + (517) 788-0453 October 31, 1979 Hove-281-79 e

Mr J G Keppler, Regional Director Office of Inspection and Enforcement US Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDIAND NUCLEAR PLANT -

UNIT NO 1, DOC M NO 50-329 UNIT NO 2, DOC M NO 50-330 CONIAIINEIR BUILDDiG PRESTRESSDiG TENDONS

Reference:

1) S H Howell letter to J G Keppler; Midland Nuclear Plant; Unit No 1, Docket No 50-329; Unit No 2, Docket No 50-330; Containment Building Prestressing Tendons; Serial Hove-226-79; dated August 23, 1979
2) C a Howell letter to J G Keppler; Midland Nuclear Plant; Unit No 1, Docket No 50-329; Unit No 2, Docket No 50-330; Containment Building Prestressing Tendons; Serial Hove-254-79; dated September 28, 1979 The referenced letters were interim 50 55(c) reports on tendon wires which were in nonconfomance to length requirements. This letter is our final report on this subject.

The production equipment at Inryco's Wiremil facility was modified to eliminate the sources of unacceptable wire length variations in the manufacturing process.

On August 27, 1979, a Quality Control Inspection procedure for tendon vire length verification was implemented at the Wiremil facility. Other improvements were made in Wiremil's Quality Program prior to the release for continued production. CPCo and Dechtel Quality Assurance personnel visited Inryco's Melrose Park and Wiremil facilities on August 21 and September 27, 1979, respectively. Their Quality Programs were revieved and determined to be effectively implemented.

The seven nonconfbrma installed vertical tendons have been removed from Unit 2 and scrapped. All other tendCns previously identified as nonconfoming I

2 232 7911070

2 Howe-281-79 or indeterminate have been zmoved from t'ae Midland Site and have been returned to Inryeo. Therefore, the Midland Site is now in compliance in this regard.

. - - a gr,Q

, wRn/ir CC: Director of Office af Inspection & Enforcement Att: Mr Victor Stello, USNRC (15)

Director, Office of Management Information and Program Control, USHRC (1)

~