Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19256F340 + (04:57:39, 4 January 2025)
- 05000324/LER-1979-096, Forwards LER 79-096/03L-0 + (04:57:54, 4 January 2025)
- ML19256F337 + (04:57:56, 4 January 2025)
- ML19256F336 + (04:57:57, 4 January 2025)
- ML19256F335 + (04:58:06, 4 January 2025)
- ML19256F334 + (04:58:07, 4 January 2025)
- ML19256F333 + (04:58:08, 4 January 2025)
- ML19256F331 + (04:58:10, 4 January 2025)
- ML19256F330 + (04:58:12, 4 January 2025)
- ML19256F329 + (04:58:13, 4 January 2025)
- 05000278/LER-1979-035-03, /03L-0:on 791102,during Insp of Traveling in Core Probe Sys,Shear Valves in Guide Tube Assemblies Detected Installed Backwards.Caused by Facility Const Error.Five Shear Valves Removed & Properly Reinstalled + (04:58:55, 4 January 2025)
- ML19256F327 + (04:58:59, 4 January 2025)
- ML19256F325 + (04:59:00, 4 January 2025)
- 05000324/LER-1979-100-03, /03L-0:on 791120,during Normal Reactor Startup, Full Out Indication Not Received by Reactor Sequence Control Sys from Control Rod 06-27.Caused by Defective Optical Isolator.Isolator Replaced + (04:59:34, 4 January 2025)
- ML19256F323 + (04:59:39, 4 January 2025)
- 05000324/LER-1979-100, Forwards LER 79-100/03L-0 + (05:00:18, 4 January 2025)
- ML19256F320 + (05:00:23, 4 January 2025)
- ML19256F319 + (05:00:25, 4 January 2025)
- 05000271/LER-1979-034-01, /01P-0:on 791211,during Seismic Analyses of Seismic Class 1 Pipe Supports,Discovered That Pipe Supports in Portion of Two Sys May Not Support Seismic Loads.Caused by Incorrect Design or Application of Supports + (05:00:49, 4 January 2025)
- ML19256F317 + (05:00:51, 4 January 2025)
- 05000271/LER-1979-034, Forwards LER 79-034/01P-0 + (05:01:32, 4 January 2025)
- ML19256F314 + (05:01:35, 4 January 2025)
- ML19256F312 + (05:01:38, 4 January 2025)
- 05000324/LER-1979-099-03, /03L-0:on 791120,coolant Iodine Activity Exceeded Tech Spec Limit.Caused by Two Reactor Scrams & Increase in Fission Product Inventory in Coolant from Fuel Element Leak. Fuel Bundles to Be Sipped & Leaking Bundles to Be Remo + (05:02:25, 4 January 2025)
- ML19256F310 + (05:02:30, 4 January 2025)
- 05000324/LER-1979-099, Forwards LER 79-099/03L-0 + (05:03:01, 4 January 2025)
- ML19256F307 + (05:03:05, 4 January 2025)
- ML19256F306 + (05:03:07, 4 January 2025)
- ML19256F305 + (05:03:09, 4 January 2025)
- 05000317/LER-1979-075-04, /04T-0:on 791129,waste Neutralizing Tank Overflowed to Ground in Unmonitored Discharge Against Environ Tech Specs.Caused by Operator Error in Reading Tank Level.Procedures Revised + (05:03:44, 4 January 2025)
- ML19256F303 + (05:03:53, 4 January 2025)
- ML19256F302 + (05:03:56, 4 January 2025)
- ML19256F300 + (05:04:06, 4 January 2025)
- 05000317/LER-1979-075, Forwards LER 79-075/04T-0 + (05:04:41, 4 January 2025)
- ML19256F297 + (05:04:44, 4 January 2025)
- ML19256F296 + (05:04:45, 4 January 2025)
- ML19256F295 + (05:04:46, 4 January 2025)
- ML19256F293 + (05:04:47, 4 January 2025)
- ML19256F291 + (05:04:48, 4 January 2025)
- ML19256F290 + (05:04:50, 4 January 2025)
- PM-79-107, Forwards Monthly Operating Rept for Nov 1979 + (05:04:53, 4 January 2025)
- ML19256F289 + (05:04:53, 4 January 2025)
- ML19256F285 + (05:05:36, 4 January 2025)
- ML19256F284 + (05:05:38, 4 January 2025)
- ML19256F283 + (05:05:40, 4 January 2025)
- ML19256F281 + (05:05:41, 4 January 2025)
- ML19256F280 + (05:05:43, 4 January 2025)
- ML19256F279 + (05:05:46, 4 January 2025)
- ML19256F277 + (05:05:47, 4 January 2025)
- ML19256F276 + (05:05:49, 4 January 2025)
- ML19256F275 + (05:05:50, 4 January 2025)