ML19256F319
| ML19256F319 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 12/11/1979 |
| From: | Metropolitan Edison Co |
| To: | |
| Shared Package | |
| ML19256F313 | List: |
| References | |
| NUDOCS 7912180491 | |
| Download: ML19256F319 (4) | |
Text
.#
CRGMlIZATIc7 png7 Dir-2 1609 071 2 912180 + 9/
ORGANIZATION PLAN - TMI-2 1.0 Organization The organization described in this plan indicates the functional areas required to support the reco'ery of TMI-2.
Because of the changing priorities which exist during the Recovery Mode, changes will have to be made in a timely fashion.
1.1 TMI Generation Group Organization The TMI Generation Group Organization is as shown in Figure 1.1 and provides management and technical support.
1.2 TMI-2 Organization The TMI-2 Organization is as shown in Figure 1.2 and provides the necessary operation, maintenance, and management support.
2.0 Administration 2.1 Plan Approval and Audit 2.1.1 The TMI-2 Organization Plan and changes thereto shall be approved by the head of the TMI Generation Group.
2.1.2 The initial Organization Plan shall be submitted to the NRC for approval.
2.1.3 Changes to Organization Plan shall be submitted to the NRC within 45 days of the affected change.
2.1.4 The QA Departm2nt shall conduct annual audits to verify conformance of the organization with the Plan.
1609 072
mNO OO N
tnes rme ee c ggi aav nnr aae MMS yg t n ii e
rl r I
c oie yn tbe t a can ir eii l u rl g as i en us DRE QA NO I
l l
T a
a A
t t
Z l
n ng I
a g
e en N
t n
nr mi A
nd i
ne nr G
en s
oe oo R
rt a n
rn rt O
r on e
ii ii t o ):
y c
vg vn P
crtt i
nn no U
eil e L
EE EM O
rvaf R
n i nea G
t o DEHS ns N
ei dd O
I iE T
s A
en R
ra E
Pt r
N i
o E
el t2 G
co c -
ip eI I
Vo rM M
r iT T
.t D
re SM 1
1 e
rug e
i ct F
rin oV e t
dd cliE e - s -
rI et iM re DTPM lac ig' r
o!
e l s g2 or a
it nId n aMao MTRC yr
/
e 5
g g
g vg n
n n
on i
i i
ci r
r r
er e
e t e R e en me ce e
l s ng en en 2 n ran i i ti ji i
oco gs sg og I g tii ne yn rn Mn cnt ED SE PE TE ehc rcn ieu r
DTF
DIRECTOR TMI-2 N
l O
Security Manager Training Manager Manager UMI-2 m
Administration Site Project Recovery o
and Services Operations Operations Engineering c
/
I Site Process Manager Maintenance' Plant Operation Support Operations Engineering Services L
/
Liquid /
Processing Supervisor Decontam-Gas Plant ination Process Operations (SEO)
' Solid Shift Waste Foreman (SRO)
Waste Control Room Disposal Operator (RO)
Auxiliary Operator Figure 1.2 TMI-2 ORGANIZATION e