't r; i
IMHrrHI!JWilFFtl.rFIIIS 1
%"LT/XJ2"Of"~
N4" foe CONNECTICUT 06101 1
"Jni=J."'0'.0""~
aan eeweii LI L
a 00:::O=='O*.T November 9, 1979 Docket No. 50-336 Mr. Boyce H. Grier, Director Region 1 Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406
References:
(1)
B. H. Grier letter to W. G. Counsil dated July 26, 1979, transmitting I&E Bulletin No.79-06C.
(2)
D. F. Ross letter to G. E. Liebler dated September 2, 1979.
(3)
W. G. Counsil letter to B. H. Grier dated August 29, 1979.
(4)
G. E. Liebler letter to D. F. Ross dated October 31, 1979.
Gentlemen:
Millstone Nuclear Power Station, Unit No. 2 I&E Bulletin No.79-06C In Item (5) of Reference (1) and in Reference (2), Northeast Nuclear Energy Company (NNECO) was requested to provide information regarding inadequate core cooling in accordance with the recommendations in Section 2.1.9 of NUREG-0578.
As indicated in Reference (3), the Combustion Engineering Report CEN-ll7, "Rea-c v:' t:1 ""JI ISE %11 atin Mg 06C, Item (5)", was submitted in accordance with the scope and schedule agreed upon with f.6 le.t hwil via Aeietatimu T,.
NNECO's review of this report has determined that the information is applicable to Millstone Unit No. 2 and as such, fulfills the Reference (1) request.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY
/
/
/s 1
W. G. Counsil '
Vice President 1609 082 79121tu) W 7