- PNO-II-86-054, on 860722,unscheduled Shutdown Longer than 48 H Occurred Due to Inoperable Recirculation Containment Spray Heat Exchanger.Unit Placed in Cold Shutdown for Component Repairs.Commonwealth of VA Informed + (11:24:38, 4 December 2024)
- ML20212E794 + (11:24:41, 4 December 2024)
- 05000482/LER-1987-007, :on 870122,while NSSS Computer Maint Being Performed,Axial Flux Difference Annunciator Began Alarming Spuriously.Caused by Cognitive Personnel Error.Rept Added to Required Reading as Reminder to Personnel + (11:24:43, 4 December 2024)
- ML20212E789 + (11:24:43, 4 December 2024)
- ML20212E788 + (11:24:44, 4 December 2024)
- ML20212E784 + (11:24:45, 4 December 2024)
- ML20212E785 + (11:24:45, 4 December 2024)
- ML20212E783 + (11:24:46, 4 December 2024)
- ML20212E781 + (11:24:47, 4 December 2024)
- ST-HL-AE-1940, Forwards marked-up FSAR Pages Re Cumulative Usage Factor for Accumulator Safety Injection Lines & Pressurizer Surge Lines.Changes Support Preparation of SER & Will Be Incorporated Into FSAR Amend 59 + (11:24:47, 4 December 2024)
- BVY-99-114, Provides Notification That Licensee Completed Y2K Remediation Efforts Described in Util 990608 Response to NRC GL 98-01,Suppl 1 + (11:24:48, 4 December 2024)
- ML20212E778 + (11:24:48, 4 December 2024)
- ML20212E776 + (11:24:49, 4 December 2024)
- ML20212E773 + (11:24:49, 4 December 2024)
- ML20212E771 + (11:24:50, 4 December 2024)
- ML20212E768 + (11:24:51, 4 December 2024)
- ML20212E769 + (11:24:51, 4 December 2024)
- ML20212E767 + (11:24:52, 4 December 2024)
- B16829, Informs That Date for Beginning Second 10-yr Interval, Corresponding W/Implementation of Revised IST Program Plan, Will Be Specified within IST Program Plan Submitted Prior to Startup Due to Extended Shutdown.Revised Commitments,Encl + (11:24:53, 4 December 2024)
- PNO-V-86-094, on 861224,facility Tripped from 100% Power. Cause Believed to Be Electrical Malfunction on Vital Bus B. Definitive Cause of Malfuncion Under Investigation.Unit Will Be Maintained in Mode 3 Until Cause Identified + (11:24:53, 4 December 2024)
- IR 05000232/1951001 + (11:24:54, 4 December 2024)
- ML20212E759 + (11:24:55, 4 December 2024)
- ML20212E758 + (11:24:56, 4 December 2024)
- ML20212E757 + (11:24:56, 4 December 2024)
- PNO-II-86-059, on 860826,CP&L Plans to Keep Robinson Unit in Unscheduled Shutdown Longer than 48 H.Inadvertent Overboration of Unit During Efforts to Match Erratic Flow Resulted in Temp & Pressure Reduction.State of Nc Informed + (11:24:57, 4 December 2024)
- ML20212E754 + (11:24:58, 4 December 2024)
- ML20212E750 + (11:24:59, 4 December 2024)
- ML20212E748 + (11:25:00, 4 December 2024)
- ML20212E747 + (11:25:00, 4 December 2024)
- ML20212E745 + (11:25:01, 4 December 2024)
- ML20212E743 + (11:25:02, 4 December 2024)
- ML20212E740 + (11:25:03, 4 December 2024)
- ML20212E738 + (11:25:03, 4 December 2024)
- ML20212E737 + (11:25:04, 4 December 2024)
- ML20212E736 + (11:25:04, 4 December 2024)
- ML20212E734 + (11:25:05, 4 December 2024)
- LIC-99-0087, Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams + (11:25:06, 4 December 2024)
- ML20212E731 + (11:25:06, 4 December 2024)
- ML20212E728 + (11:25:07, 4 December 2024)
- ML20212E726 + (11:25:09, 4 December 2024)
- TXX-6134, Responds to NRC 861117 Request for Addl Info on Violation & Deviation Noted in Insp Repts 50-445/85-18 & 50-446/85-15. Corrective actions:CP-QP-2.1 Revised to Eliminate Need for Min OJT & OJT Waivers & Verification Package Reinspected + (11:25:10, 4 December 2024)
- ML20212E721 + (11:25:11, 4 December 2024)
- ML20212E724 + (11:25:11, 4 December 2024)
- ML20212E717 + (11:25:12, 4 December 2024)
- ML20212E715 + (11:25:13, 4 December 2024)
- ML20212E716 + (11:25:13, 4 December 2024)
- ML20212E713 + (11:25:15, 4 December 2024)
- ML20212E711 + (11:25:16, 4 December 2024)
- L-86-324, Responds to Violations Noted in Insp Rept 50-250/85-43. Corrective actions:100% Power Meter Indication Alignment of Neutron Flux Detectors Completed on 850916.Civil Penalty Payment Encl + (11:25:17, 4 December 2024)
- 05000413/LER-1987-003, :on 870124,results of Boron Analyses Performed on Samples from Cold Leg Accumulator B After Each of Four Water Additions Exceeded Tech Specs.Cause by Personnel Error.Personnel Counseled + (11:25:18, 4 December 2024)
- LIC-97-0174, Forwards Fort Calhoun Station Performance Indicators, for Sept 1997 + (11:25:20, 4 December 2024)