Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20214D073 + (07:36:13, 4 December 2024)
- ML20214D068 + (07:36:14, 4 December 2024)
- ML20214D067 + (07:36:15, 4 December 2024)
- ML20214D055 + (07:36:16, 4 December 2024)
- PY-CEI-NRR-0652, Monthly Operating Rept for Apr 1987 + (07:36:17, 4 December 2024)
- ML20214D048 + (07:36:18, 4 December 2024)
- ML20214D039 + (07:36:21, 4 December 2024)
- ML20214D032 + (07:36:22, 4 December 2024)
- IR 05000029/1986014 + (07:36:23, 4 December 2024)
- ML20214D021 + (07:36:27, 4 December 2024)
- ML20214D022 + (07:36:27, 4 December 2024)
- ML20214D019 + (07:36:28, 4 December 2024)
- ML20214D014 + (07:36:30, 4 December 2024)
- ML20214D013 + (07:36:30, 4 December 2024)
- ML20214D012 + (07:36:31, 4 December 2024)
- ML20214D008 + (07:36:36, 4 December 2024)
- 05000354/LER-1986-080, :on 861018,full Reactor Scram Occurred from Valid Reactor Vessel Low Water Level 3 Signal.Caused by Loss of RFP Flow Due to Incorrect Field Installation of Test Jack Leads.Leads Reinstalled + (07:36:44, 4 December 2024)
- ML20214D004 + (07:36:44, 4 December 2024)
- ML20214D002 + (07:36:45, 4 December 2024)
- ML20214C999 + (07:36:46, 4 December 2024)
- ML20214C996 + (07:36:47, 4 December 2024)
- ML20214C990 + (07:36:51, 4 December 2024)
- NUREG-0562, Advises That NUREG-0562 Fuel Failure Criteria Not Approved as Basis for Licensing.Use of Criteria Should Be Discontinued to Eliminate Licensing Delays.List of Plants Applying Criteria Requested + (07:36:52, 4 December 2024)
- ML20214C984 + (07:36:53, 4 December 2024)
- ML20214C983 + (07:36:54, 4 December 2024)
- ML20214C979 + (07:36:55, 4 December 2024)
- ML20214C968 + (07:36:56, 4 December 2024)
- ML20214C974 + (07:36:56, 4 December 2024)
- ML20214C965 + (07:36:57, 4 December 2024)
- ML20214C964 + (07:36:58, 4 December 2024)
- TXX-6093, Interim Deficiency Rept CP-86-51 Re Anchor Bolts Supplied by Hilti Not Meeting Average Ultimate Tensile Loads in Certain Sizes as Published by Supplier.Initially Reported on 860717. Next Rept Will Be Submitted by 870130 + (07:36:59, 4 December 2024)
- ML20214C960 + (07:37:00, 4 December 2024)
- ML20214C958 + (07:37:02, 4 December 2024)
- ML20214C951 + (07:37:08, 4 December 2024)
- ML20214C950 + (07:37:09, 4 December 2024)
- ML20214C949 + (07:37:09, 4 December 2024)
- ML20214C936 + (07:37:11, 4 December 2024)
- ML20214C934 + (07:37:11, 4 December 2024)
- ML20214C929 + (07:37:12, 4 December 2024)
- ML20214C928 + (07:37:14, 4 December 2024)
- AECM-86-0030, Forwards Response to Items Addressed in Section 4 of NRC Interim SER & Request for Addl Info Re Reg Guide 1.97 Commitments.Design,Specs & Schedule for Performing Work Being Developed + (07:37:15, 4 December 2024)
- 05000213/LER-1986-042, :on 861016,discovered Chain on Valve SI-MOV-24 Disengaged & Lock Open.Caused by Operator Error in Using Faulty Lock & Failure to Check Status of Lock.Further Operator Training Re Lock Surveillance Planned + (07:37:18, 4 December 2024)
- ML20214C923 + (07:37:19, 4 December 2024)
- ML20214C917 + (07:37:20, 4 December 2024)
- IR 05000412/1986025 + (07:37:21, 4 December 2024)
- ML20214C914 + (07:37:22, 4 December 2024)
- ML20214C907 + (07:37:23, 4 December 2024)
- ML20214C912 + (07:37:23, 4 December 2024)
- ML20214C903 + (07:37:24, 4 December 2024)
- ML20214C899 + (07:37:25, 4 December 2024)
- ML20214C898 + (07:37:26, 4 December 2024)