Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20214U004 + (05:21:46, 4 December 2024)
- ML20214U001 + (05:21:47, 4 December 2024)
- ML20214U002 + (05:21:47, 4 December 2024)
- BSEP-86-1657, Responds to Violations Noted in Insp Repts 50-324/86-25 & 50-325/86-24.Corrective Actions:Auxiliary Operator Involved Counseled to Ensure Understanding of Mandatory Procedure Compliance & Operating Procedure 39 Revised + (05:21:48, 4 December 2024)
- ML20214T998 + (05:21:49, 4 December 2024)
- ML20214T995 + (05:21:50, 4 December 2024)
- ML20214T994 + (05:21:50, 4 December 2024)
- ML20214T991 + (05:21:51, 4 December 2024)
- IR 05000263/1986009 + (05:21:52, 4 December 2024)
- ML20214T989 + (05:21:52, 4 December 2024)
- ML20214T986 + (05:21:53, 4 December 2024)
- 05000255/LER-1986-033, :on 860825,discovered That LPSI Pump P-67B Flow Did Not Meet FSAR Specs.Caused by Impeller Installed in Pump in 1983.Impeller Replaced.Performance Tests Indicate That Pump Now Satisfies FSAR Specs + (05:21:55, 4 December 2024)
- ML20214T981 + (05:21:55, 4 December 2024)
- ML20214T978 + (05:21:56, 4 December 2024)
- ML20214T976 + (05:21:57, 4 December 2024)
- ML20214T977 + (05:21:57, 4 December 2024)
- ML20214T974 + (05:21:58, 4 December 2024)
- ML20214T972 + (05:21:58, 4 December 2024)
- ML20214T971 + (05:21:59, 4 December 2024)
- ML20214T966 + (05:22:01, 4 December 2024)
- ML20214T965 + (05:22:02, 4 December 2024)
- ML20214T963 + (05:22:03, 4 December 2024)
- ML20214T961 + (05:22:04, 4 December 2024)
- TXX-6495, Interim Deficiency Rept CP-87-09 Re Terminal Studs in PK-2 Test Blocks.Initially Reported on 870507.Susceptibility to Stress Corrosion Due to Mfg Failure to Follow Required Mfg Processes.Next Rept Will Be Submitted by 870807 + (05:22:05, 4 December 2024)
- ML20214T954 + (05:22:05, 4 December 2024)
- ML20214T951 + (05:22:06, 4 December 2024)
- ML20214T949 + (05:22:07, 4 December 2024)
- ML20214T950 + (05:22:07, 4 December 2024)
- ML20214T947 + (05:22:08, 4 December 2024)
- ML20214T948 + (05:22:08, 4 December 2024)
- ML20214T943 + (05:22:09, 4 December 2024)
- ML20214T946 + (05:22:09, 4 December 2024)
- B12353, Forwards Rev 3 to Physical Security Plan.Rev Withheld (Ref 10CFR73.21 & 2.790) + (05:22:11, 4 December 2024)
- ML20214T938 + (05:22:11, 4 December 2024)
- IR 05000354/1987013 + (05:22:12, 4 December 2024)
- ML20214T935 + (05:22:13, 4 December 2024)
- IR 05000315/1986040 + (05:22:16, 4 December 2024)
- AECM-86-0376, Final Deficiency & Part 21 Rept 4 Re Low Flow Condition Through Standby Svc Water (SSW) Pump A.Initially Reported on 820415.Procedures to Ensure That Min Pump Flow Provided When SSW Sys Automatically Started,Issued + (05:22:16, 4 December 2024)
- ML20214T927 + (05:22:17, 4 December 2024)
- 0CAN098605, Responds to Violations Noted in Insp Repts 50-313/86-21 & 50-368/86-22.Corrective Actions:Policy Document,Detailing Implementation of 10CFR50.59 Review Process W/Supporting Training Program,Developed + (05:22:19, 4 December 2024)
- 05000278/LER-1986-022-02, :on 861030,manual Scram Occurred After Resin Injection.Caused by Resin Left in Demineralizer Outlet Plenum or Piping After Recent Filter Element Replacement. Maint Work Instructions Revised + (05:22:19, 4 December 2024)
- ML20214T921 + (05:22:20, 4 December 2024)
- ML20214T920 + (05:22:21, 4 December 2024)
- ML20214T919 + (05:22:21, 4 December 2024)
- ML20214T914 + (05:22:22, 4 December 2024)
- ML20214T912 + (05:22:23, 4 December 2024)
- 05000285/LER-1987-018, :on 870504,design Deficiencies of Valve Operator Sys for HCV-385 & HCV-386 Identified.Mod Completed & Valves Retested + (05:22:24, 4 December 2024)
- IR 05000461/1986071 + (05:22:27, 4 December 2024)
- ML20214T906 + (05:22:28, 4 December 2024)
- ML20214T904 + (05:22:29, 4 December 2024)
- TXX-6102, Forwards Comanche Peak Response Team (Cprt) Responses to Case 850814 Comments on Welding,As Requested in NRC 850930 Evaluation of Cprt Program Plan.Emphasizes That Reinsp Efforts by Third Party Are Not Insps of Record + (05:22:29, 4 December 2024)