Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215A991 + (04:18:30, 4 December 2024)
- ML20215A990 + (04:18:31, 4 December 2024)
- NRC-87-3231, Forwards Nonproprietary WCAP-11508 & Proprietary WCAP-11506, Full-Flow Filter Recovery & Equipment Assessment. Proprietary Rept Withheld (Ref 10CFR2.790).Application for Withholding Rept & Affidavit Encl + (04:18:32, 4 December 2024)
- ML20215A986 + (04:18:33, 4 December 2024)
- ML20215A976 + (04:18:44, 4 December 2024)
- ML20215A973 + (04:18:45, 4 December 2024)
- ML20215A970 + (04:18:46, 4 December 2024)
- ML20215A969 + (04:18:46, 4 December 2024)
- ML20215A967 + (04:18:47, 4 December 2024)
- ML20215A966 + (04:18:47, 4 December 2024)
- ML20215A964 + (04:18:48, 4 December 2024)
- ML20215A963 + (04:18:49, 4 December 2024)
- ML20215A961 + (04:18:49, 4 December 2024)
- 05000354/LER-1987-021, :on 870508,ESF Actuation Occurred When Reactor Protection Sys Bus a de-energized.Caused by Design Deficiency Re Use of Nonregulated Transformer.Regulating Transformer Will Be Installed + (04:18:51, 4 December 2024)
- ML20215A959 + (04:18:52, 4 December 2024)
- ML20215A958 + (04:18:53, 4 December 2024)
- IR 05000289/1986018 + (04:18:54, 4 December 2024)
- ML20215A950 + (04:18:54, 4 December 2024)
- ML20215A947 + (04:18:55, 4 December 2024)
- 05000461/LER-1987-028, :on 870518,noble Gas Detector Chamber Pressure Correction Factor Improperly Applied During Calibr Procedures on Gaseous Effluent Monitors.Caused by Personnel Error.Procedures Revised & Calibr Corrected + (04:18:57, 4 December 2024)
- ML20215A943 + (04:18:58, 4 December 2024)
- ML20215A941 + (04:18:58, 4 December 2024)
- ML20215A939 + (04:18:59, 4 December 2024)
- ML20215A932 + (04:19:00, 4 December 2024)
- ML20215A931 + (04:19:01, 4 December 2024)
- ML20215A929 + (04:19:02, 4 December 2024)
- RBG-26070, Forwards Supplemental Info to Attachments 1 & 4 of 870310 Submittal Re Safety Relief Valves & Leak Rate Tests,Per NRC Request + (04:19:03, 4 December 2024)
- ML20215A917 + (04:19:04, 4 December 2024)
- ML20215A915 + (04:19:04, 4 December 2024)
- TAC:60870 + (04:19:05, 4 December 2024)
- ML20215A914 + (04:19:07, 4 December 2024)
- ML20215A909 + (04:19:08, 4 December 2024)
- ML20215A903 + (04:19:09, 4 December 2024)
- ML20215A905 + (04:19:09, 4 December 2024)
- B12556, Clarifies 861231 Application to Amend License DPR-61, Revising Tech Specs Re Significance of Value Represented as Three Loop Power Level,Per NRC Request + (04:19:10, 4 December 2024)
- ML20215A899 + (04:19:11, 4 December 2024)
- ML20215A897 + (04:19:12, 4 December 2024)
- ML20215A896 + (04:19:12, 4 December 2024)
- 05000348/LER-1987-010, :on 870514,w/unit Operating at 100% Reactor Power,Reactor Tripped Due to Steam Flow Greater than Feedwater Flow Coincident W/Low Steam Generator Level.Caused by Personnel Error.Individual Counseled + (04:19:14, 4 December 2024)
- ML20215A894 + (04:19:14, 4 December 2024)
- ML20215A885 + (04:19:16, 4 December 2024)
- ML20215A884 + (04:19:17, 4 December 2024)
- ML20215A881 + (04:19:17, 4 December 2024)
- ST-HL-AE-1766, Forwards Estimates of Needs for Operator Licensing Exams for FY87-90,in Response to Generic Ltr 86-14.Info Also Provided on Dates for Scheduled Requalification Exams & Dates for Each Licensing Exam Site Visit.Related Correspondence + (04:19:18, 4 December 2024)
- ML20215A875 + (04:19:19, 4 December 2024)
- TXX-5027, Supplemental Deficiency Rept CP-86-18 Re Difficulties in Starting & Operating Safety Chilled Water Chiller Units. Initially Reported on 860521.Gibbs & Hill Performing Review of Vendor Specs.Next Rept Will Be Submitted by 861217 + (04:19:19, 4 December 2024)
- ML20215A873 + (04:19:20, 4 December 2024)
- ML20215A870 + (04:19:22, 4 December 2024)
- ML20215A864 + (04:19:24, 4 December 2024)
- IR 05000483/1987016 + (04:19:26, 4 December 2024)
- ML20215A859 + (04:19:27, 4 December 2024)