Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215B343 + (04:16:22, 4 December 2024)
- ML20215B344 + (04:16:22, 4 December 2024)
- ML20215B342 + (04:16:23, 4 December 2024)
- ML20215B339 + (04:16:24, 4 December 2024)
- ML20215B337 + (04:16:24, 4 December 2024)
- ML20215B334 + (04:16:25, 4 December 2024)
- ML20215B333 + (04:16:26, 4 December 2024)
- ML20215B331 + (04:16:27, 4 December 2024)
- ML20215B330 + (04:16:27, 4 December 2024)
- ML20215B326 + (04:16:28, 4 December 2024)
- ML20215B324 + (04:16:29, 4 December 2024)
- ML20215B325 + (04:16:29, 4 December 2024)
- ML20215B321 + (04:16:30, 4 December 2024)
- ST-HL-AE-1743, Revised Final Deficiency Rept Re Interaction of safety-related & nonsafety-related Instruments Connected to Same Process Taps.Initially Reported on 851009.Item Not Reportable Per 10CFR50.55(e).Related Correspondence + (04:16:31, 4 December 2024)
- ML20215B318 + (04:16:31, 4 December 2024)
- 05000362/LER-1985-036, :on 851223,determined That Shutdown Cooling Sys HX Isolation Valves 3HV-8150 & 3HV-8151 Not Fully Closed Per Tech Specs.Caused by Premature Actuation of Valve Motor Operator Position Indication Limit Switches + (04:16:33, 4 December 2024)
- BECO-86-145, Forwards Augmented Insp Program for Piping Susceptible to Igscc,Per Generic Ltr 84-11.Preliminary List of Welds to Be Examined During Refueling Outage 7 & Isometric Drawings, Depicting Location of Subj Welds,Encl + (04:16:34, 4 December 2024)
- ML20215B316 + (04:16:34, 4 December 2024)
- ML20215B312 + (04:16:35, 4 December 2024)
- ML20215B309 + (04:16:36, 4 December 2024)
- ML20215B308 + (04:16:36, 4 December 2024)
- 05000295/LER-1987-012-05, :on 870515,discovered Logic Surveillance High Steam Flow Safety Injection Block Permissive Not Done. Caused by Faulty Test Procedure Requiring Closure of MSIV & Subsequent Unit Trip.New Procedure Developed + (04:16:38, 4 December 2024)
- ML20215B305 + (04:16:38, 4 December 2024)
- ST-HL-AE-1751, Submits Detailed Description of Plant Emergency Lighting Sys in Response to Telcon Re Util Response to Closing of SER (NUREG-0781) Confirmatory Item 20.Related Correspondence + (04:16:40, 4 December 2024)
- ST-HL-AE-1763, Forwards Harza Engineering Co Rept, Main Cooling Reservoir Performance Evaluation for Filling to Elevation 35, in Response to SER Confirmatory Item 4.Related Correspondence + (04:16:41, 4 December 2024)
- ML20215B293 + (04:16:41, 4 December 2024)
- ML20215B292 + (04:16:42, 4 December 2024)
- ML20215B290 + (04:16:42, 4 December 2024)
- ML20215B288 + (04:16:43, 4 December 2024)
- ML20215B287 + (04:16:44, 4 December 2024)
- ML20215B285 + (04:16:44, 4 December 2024)
- ML20215B283 + (04:16:45, 4 December 2024)
- 05000528/LER-1986-044, :on 860902,automatic Reactor Protection Sys Actuation Initiated Reactor Trip.Caused by Spurious Low Reactor Coolant Flow (Lrcf) Trip on Channels B & D on Steam Generator 2.LCRF Trip Setpoints Evaluated + (04:16:47, 4 December 2024)
- TXX-5031, Interim Deficiency Rept CP-86-49 Re Effects of polar-organic Solvents on Sealants of Conax Adaptor Modules & Electrical Penetrations.Investigation Continuing.Next Rept Expected by 861010 + (04:16:48, 4 December 2024)
- ML20215B280 + (04:16:49, 4 December 2024)
- ML20215B270 + (04:16:53, 4 December 2024)
- ST-HL-AE-1765, Forwards Probabilistic Boron Dilution Analysis Final Rept, Per SER Open Item 15.Analysis Demonstrates That at Least 15 Minutes Available for Operator Response in Event of Boron Dilution Transient.Related Correspondence + (04:16:55, 4 December 2024)
- TXX-6507, Interim Deficiency Rept CP-86-72 Re Scope of Plant Mods Resulting from Project Pipe Support Reverification Program. Initially Reported 860609.List of Support Mods Issued to Date Encl.Next Rept Will Be Submitted by 870820 + (04:16:55, 4 December 2024)
- ML20215B258 + (04:16:57, 4 December 2024)
- TXX-5025, Final Deficiency Rept CP-86-56 Re Fastening of Standby Diesel Generator Engine Connecting Rod Assembly Identified by Tdi.Initially Reported on 860814.Issue Not Reportable Per 10CFR50.55(e) + (04:16:58, 4 December 2024)
- ML20215B253 + (04:16:58, 4 December 2024)
- ML20215B248 + (04:17:00, 4 December 2024)
- ML20215B242 + (04:17:01, 4 December 2024)
- ML20215B243 + (04:17:01, 4 December 2024)
- ML20215B234 + (04:17:02, 4 December 2024)
- ML20215B233 + (04:17:03, 4 December 2024)
- ML20215B231 + (04:17:04, 4 December 2024)
- ML20215B227 + (04:17:05, 4 December 2024)
- ML20215B224 + (04:17:06, 4 December 2024)
- ML20215B222 + (04:17:07, 4 December 2024)
- ST-HL-AE-2249, Forwards Annotated Rev to FSAR Section 6.4.5.1, Control Room Envelope HVAC Integrity & Leaktightness Test. Revised Section 6.4.5.1 Will Be Included in Future FSAR Amend + (04:17:07, 4 December 2024)
- ML20215B217 + (04:17:09, 4 December 2024)