Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215B903 + (04:11:17, 4 December 2024)
- ML20215B902 + (04:11:17, 4 December 2024)
- 3F0687-09, Forwards Revised Page 23 to 840821 Rept Re Compliance of Each Variable W/Rev 3 to Reg Guide 1.97.Page 23 Re Borated Storage Tank Level Revised,Reflecting Mounting of Recorder on Nonseismic Section of Control Panel.Compliance Unchanged + (04:11:18, 4 December 2024)
- ML20215B897 + (04:11:19, 4 December 2024)
- 05000410/LER-1986-003-01, :on 861108,partial Loss of Secondary Containment Isolation Actuation Instrumentation Occurred. Caused by Personnel Error.Training Mod Recommendation Initiated + (04:11:26, 4 December 2024)
- ML20215B887 + (04:11:26, 4 December 2024)
- IR 05000266/1987009 + (04:11:28, 4 December 2024)
- W3P87-1096, Responds to Generic Ltr 87-06 Re Measures to Assure Integrity of Pressure Isolation Valves (Pivs) as Independent Barriers for Rcpb.Pivs Separating RCS from Attached Low Pressure Sys Listed in Tech Spec Table 3.4-1 + (04:11:29, 4 December 2024)
- ML20215B882 + (04:11:30, 4 December 2024)
- ML20215B878 + (04:11:31, 4 December 2024)
- ML20215B879 + (04:11:31, 4 December 2024)
- ML20215B877 + (04:11:32, 4 December 2024)
- ML20215B876 + (04:11:33, 4 December 2024)
- IR 05000424/1986113 + (04:11:34, 4 December 2024)
- ST-HL-AE-2248, Forwards Annotated Rev to FSAR Table 3.12-1, Reg Guide Matrix, Incorporating Editorial Corrections Re Reg Guides 1.61 & 1.62.Rev Will Be Included in FSAR Amend 61 + (04:11:34, 4 December 2024)
- ML20215B872 + (04:11:37, 4 December 2024)
- 05000416/LER-1987-008, :on 870511,LPCI/RHR a Subsystem Quarterly Surveillance for RHR Pump a Performed at Differential Pressure Not Meeting Tech Spec Acceptance Criteria.Caused by Personnel Error.Surveillance Reperformed + (04:11:39, 4 December 2024)
- ML20215B865 + (04:11:39, 4 December 2024)
- ST-HL-AE-2239, Requests Rev of Sser 3,Page 8-2,to Reflect Actual Program Performed to Address Raychem Splice Issue.Termination Ends Required to Perform Function of Providing Electrical Insulation,Not Environ Seal + (04:11:40, 4 December 2024)
- IR 05000293/1986038 + (04:11:41, 4 December 2024)
- ML20215B859 + (04:11:42, 4 December 2024)
- 05000249/LER-1986-021-06, :on 861110,w/unit in Run Mode,Reactor Scram Occurred Due to Loss of Control Air to Msivs.Caused by Mechanic Inadvertently Removing Power Lead.Mechanic Reprimanded & Tailgate Conducted + (04:11:44, 4 December 2024)
- SNRC-1281, Advises of Formation of New Ofc for Training on 860401.Ofc Will Provide Training for Operators,Mechanics,Technicians & Prof & Mgt Personnel That Staff Nuclear & Fossil Plants. Organizational Chart & Functional Responsibilities Encl + (04:11:45, 4 December 2024)
- ML20215B854 + (04:11:45, 4 December 2024)
- ML20215B852 + (04:11:46, 4 December 2024)
- ML20215B851 + (04:11:47, 4 December 2024)
- 05000483/LER-1986-038, :on 861107,containment Purge Isolation Signal & Control Room Ventilation Isolation Occurred Due to Increased Gaseous Radioactivity Levels in Containment.Caused by Unanticipated Leakage from Pressurizer PORV Block Valve + (04:11:49, 4 December 2024)
- ML20215B847 + (04:11:50, 4 December 2024)
- ML20215B845 + (04:11:51, 4 December 2024)
- ML20215B846 + (04:11:51, 4 December 2024)
- ST-HL-AE-2257, Forwards Revised FSAR Figures 12.3.1-1 Through 12.3.1-4 Re Radiation Zones for Reactor Containment Bldg Elevations.As Result of Bechtel Reanalysis,Area 308 SW Could Become Radiation Zone 5 After Lifting of Pressurizer Relief Valve + (04:11:52, 4 December 2024)
- 05000528/LER-1986-055, :on 861106,Surveillance Test 36ST-9SA02 Identified as Incomplete,Per Tech Spec 4.0.2.Caused by Inability to Position Control Room Intake Damper Due to Actuator Malfunction.Actuator Adjusted + (04:11:54, 4 December 2024)
- ML20215B842 + (04:11:55, 4 December 2024)
- ML20215B835 + (04:11:57, 4 December 2024)
- 05000322/LER-1987-015, :on 870515,unplanned Initiation of Control Room Air Conditioning B Train Occurred Due to Low Reactor Bldg Differential Pressure.Caused by Failed Interlock Switch. Switch Indicating Door Position Repaired + (04:11:59, 4 December 2024)
- ML20215B831 + (04:12:01, 4 December 2024)
- ML20215B830 + (04:12:02, 4 December 2024)
- ML20215B828 + (04:12:02, 4 December 2024)
- ML20215B827 + (04:12:03, 4 December 2024)
- ST-HL-AE-2206, Forwards Annotated Revs to FSAR App 3.6.A, Isolation Valve Cubicle Subcompartment Analysis. Rev Due to Calculation Results Showing That Some High Energy Line Break Effects Worse than Main Steam Line Break.Rev Will Be in FSAR Amend + (04:12:05, 4 December 2024)
- ML20215B821 + (04:12:06, 4 December 2024)
- ML20215B820 + (04:12:06, 4 December 2024)
- ML20215B819 + (04:12:07, 4 December 2024)
- 05000278/LER-1986-024-01, :on 861108,partial Group V Primary Containment Isolation Occurred During Testing of RCIC Sys Steam Tunnel Temp Switch.Caused by Loose Wire Connection.Wire Tightened + (04:12:09, 4 December 2024)
- ML20215B816 + (04:12:09, 4 December 2024)
- ML20215B814 + (04:12:10, 4 December 2024)
- NRC-87-3229, Informs of Completion of Preliminary Design & Engineering of Advanced Pwr.Westinghouse Currently Working on Final Design & Engineering Efforts & Encouraged That Issuance of Preliminary Design Approval Will Be Achieved in Early 1988 + (04:12:10, 4 December 2024)
- A06097, Submits Addl Info Re SEP Topic III-3.C, Inservice Insp of Water Control Structures, in Response to 860918 Request. Qualified Engineer Will Be Assigned Responsibility for All Phases of Insps + (04:12:11, 4 December 2024)
- 05000344/LER-1987-011, :on 870501,excessive Leakage Detected from Penetration E-107 During Check of Penetrations E-112 & E-115.Caused by Leakage Past Electrical Penetration Conductor Seals & Seal Displacement Due to Age + (04:12:13, 4 December 2024)
- ML20215B807 + (04:12:14, 4 December 2024)
- ML20215B808 + (04:12:14, 4 December 2024)