Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215C639 + (03:58:40, 4 December 2024)
- ML20215C638 + (03:58:41, 4 December 2024)
- ST-HL-AE-1840, Responds to Questions Re Review of Component Cooling Water Pump Logic Diagrams.Operator Action Based on Existing Alarms Has Been Determined to Be Adequate for Both Equipment Protection & Plant Safety.One Oversize Drawing Encl + (03:58:45, 4 December 2024)
- ML20215C635 + (03:58:45, 4 December 2024)
- TXX-5036, Interim Deficiency Rept CP-86-11 Re Component Cooling Water Pump Impeller Linear Indications.Initially Reported on 860623.Requisition for Offsite Repair of Replacement Spare Impeller Being Processed.Next Rept Anticipated by 861205 + (03:58:46, 4 December 2024)
- ML20215C630 + (03:58:47, 4 December 2024)
- ML20215C629 + (03:58:47, 4 December 2024)
- ML20215C628 + (03:58:48, 4 December 2024)
- ML20215C627 + (03:58:48, 4 December 2024)
- ML20215C626 + (03:58:49, 4 December 2024)
- ML20215C624 + (03:58:50, 4 December 2024)
- ML20215C623 + (03:58:50, 4 December 2024)
- ML20215C621 + (03:58:51, 4 December 2024)
- ML20215C620 + (03:58:51, 4 December 2024)
- ML20215C616 + (03:58:52, 4 December 2024)
- ML20215C614 + (03:58:53, 4 December 2024)
- ML20215C615 + (03:58:53, 4 December 2024)
- ML20215C612 + (03:58:54, 4 December 2024)
- ML20215C613 + (03:58:54, 4 December 2024)
- ML20215C611 + (03:58:56, 4 December 2024)
- ML20215C608 + (03:58:57, 4 December 2024)
- ML20215C607 + (03:58:58, 4 December 2024)
- ML20215C606 + (03:58:58, 4 December 2024)
- ML20215C601 + (03:58:59, 4 December 2024)
- ML20215C605 + (03:58:59, 4 December 2024)
- ML20215C597 + (03:59:00, 4 December 2024)
- PNO-III-86-143, on 861209,plant Shut Down Due to Discovery That 200 AMP Electrical Splices Supplied by GE May Not Meet Environ Qualification Requirements.Special Region III Insp Will Review Splice Problem & Licensee Corrective Action + (03:59:01, 4 December 2024)
- ML20215C596 + (03:59:01, 4 December 2024)
- ML20215C592 + (03:59:02, 4 December 2024)
- ML20215C590 + (03:59:03, 4 December 2024)
- TXX-6146, Interim Deficiency Rept CP-86-53 Re Seismic Design of Conduit.Initially Reported on 861021.Testing Program Schedule Delayed.Next Rept Expected by 870220 + (03:59:04, 4 December 2024)
- ML20215C588 + (03:59:05, 4 December 2024)
- ML20215C586 + (03:59:07, 4 December 2024)
- ML20215C584 + (03:59:08, 4 December 2024)
- ML20215C583 + (03:59:09, 4 December 2024)
- ML20215C582 + (03:59:09, 4 December 2024)
- ML20215C579 + (03:59:10, 4 December 2024)
- ML20215C577 + (03:59:11, 4 December 2024)
- ML20215C576 + (03:59:11, 4 December 2024)
- ML20215C573 + (03:59:12, 4 December 2024)
- PLA-2701, Monthly Operating Rept for Jul 1986 + (03:59:13, 4 December 2024)
- ML20215C569 + (03:59:14, 4 December 2024)
- ML20215C566 + (03:59:15, 4 December 2024)
- 05000341/LER-1987-017, :on 870513,south Reactor Feed Pump Turbine (Srfpt) Tripped Due to Apparent Srfpt High Pressure Casing Drain Valve Being Closed During Startup.Caused by Inadequate Procedure.Procedure Revised + (03:59:17, 4 December 2024)
- ML20215C563 + (03:59:17, 4 December 2024)
- ML20215C558 + (03:59:18, 4 December 2024)
- ML20215C557 + (03:59:19, 4 December 2024)
- TXX-6002, Final Deficiency Rept CP-86-15 Re Diesel Generator Controls. Initially Reported on 860314.Controls Reviewed by Tdi Under Owners Group Design Review & Quality Revalidation Program. Condition Not Reportable Per 10CFR50.55(e) + (03:59:19, 4 December 2024)
- ML20215C554 + (03:59:20, 4 December 2024)
- ML20215C555 + (03:59:20, 4 December 2024)
- ML20215C550 + (03:59:21, 4 December 2024)
- ML20215C551 + (03:59:21, 4 December 2024)