Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215D688 + (03:50:18, 4 December 2024)
- ML20215D687 + (03:50:19, 4 December 2024)
- IR 05000219/1986034 + (03:50:21, 4 December 2024)
- ML20215D682 + (03:50:22, 4 December 2024)
- ML20215D683 + (03:50:22, 4 December 2024)
- ML20215D681 + (03:50:23, 4 December 2024)
- ST-HL-AE-1834, Forwards Revised Pages 2,7 & 10 to ,Correcting Response to Sqrt/Pvort Preaudit Questions.Related Correspondence + (03:50:24, 4 December 2024)
- TXX-6121, Interim Deficiency Rept CP-86-45 Re Interaction of Nonseismic Category I Structures & Components W/Seismic Category I Structures.Initially Reported on 860606. Evaluation to Be Completed by 870116.Next Rept by 870206 + (03:50:25, 4 December 2024)
- ML20215D677 + (03:50:25, 4 December 2024)
- IR 05000482/1986027 + (03:50:27, 4 December 2024)
- ML20215D674 + (03:50:27, 4 December 2024)
- ML20215D669 + (03:50:28, 4 December 2024)
- ML20215D667 + (03:50:29, 4 December 2024)
- ML20215D662 + (03:50:29, 4 December 2024)
- TXX-6122, Interim Deficiency Rept CP-86-08 Re Control of Stamps Used to Identify Super Hilti Kwik Bolts.Initially Reported on 860206.Ultrasonic Testing Will Be Completed by 870227.Next Rept Anticipated by 870320 + (03:50:30, 4 December 2024)
- ML20215D656 + (03:50:31, 4 December 2024)
- ML20215D660 + (03:50:31, 4 December 2024)
- ML20215D655 + (03:50:32, 4 December 2024)
- IR 05000458/1986033 + (03:50:33, 4 December 2024)
- ML20215D651 + (03:50:33, 4 December 2024)
- ML20215D650 + (03:50:34, 4 December 2024)
- ML20215D647 + (03:50:35, 4 December 2024)
- ML20215D646 + (03:50:35, 4 December 2024)
- ML20215D645 + (03:50:36, 4 December 2024)
- PNO-IV-86-035, on 861210,Region IV Advised That Source Disconnect Occurred 2 Days Before While Radiography Operations Being Conducted.Doe Authorities Investigating Incident.Medical Attention Provided for Radiographers + (03:50:37, 4 December 2024)
- ML20215D640 + (03:50:38, 4 December 2024)
- ML20215D639 + (03:50:39, 4 December 2024)
- ML20215D637 + (03:50:39, 4 December 2024)
- ML20215D631 + (03:50:43, 4 December 2024)
- ML20215D632 + (03:50:43, 4 December 2024)
- ML20215D630 + (03:50:44, 4 December 2024)
- SNRC-1297, Forwards Dcrdr Implementation Plan,Per NUREG-0737,Suppl 1. Completion of Plans for Performance of Emergency Operating Procedure Upgrades,Dcrdr & SPDS Safety Analysis Anticipated by Jan 1987.W/o Encl + (03:50:45, 4 December 2024)
- ML20215D629 + (03:50:45, 4 December 2024)
- ML20215D627 + (03:50:46, 4 December 2024)
- TXX-6123, Interim Deficiency Rept CP-86-39 Re Dimensional Tolerances of Shims Used in Conjunction w/C-Type Clamps on Cable Trays. Initially Reported on 860527.Evaluation of Test Data Will Be Completed by 870331.Next Rept Anticipated by 870421 + (03:50:46, 4 December 2024)
- ML20215D624 + (03:50:47, 4 December 2024)
- ML20215D622 + (03:50:48, 4 December 2024)
- ML20215D623 + (03:50:48, 4 December 2024)
- ML20215D621 + (03:50:49, 4 December 2024)
- ML20215D620 + (03:50:49, 4 December 2024)
- ML20215D619 + (03:50:50, 4 December 2024)
- IR 05000458/1986034 + (03:50:51, 4 December 2024)
- TXX-6111, Interim Deficiency CP-86-17 Re Min Concrete Coverage Required for Reinforcing Steel in Walls & Floors Necessary to Maintain 3 H Fire Rating.Initially Reported on 860321. Next Rept Will Be Submitted by 861223 + (03:50:52, 4 December 2024)
- ML20215D617 + (03:50:52, 4 December 2024)
- ML20215D611 + (03:50:53, 4 December 2024)
- ML20215D607 + (03:50:54, 4 December 2024)
- ML20215D606 + (03:50:55, 4 December 2024)
- IR 05000289/1986016 + (03:50:56, 4 December 2024)
- ML20215D602 + (03:50:57, 4 December 2024)
- ML20215D596 + (03:50:58, 4 December 2024)
- ML20215D599 + (03:50:58, 4 December 2024)
- 05000397/LER-1986-030, :on 860903,reactor Scram Occurred Due to Low Reactor Water Level.Caused by Reactor Feedwater Pump Trip & Failure of Recirculation Flow Control Valve to Run Back. Preventive Maint Procedure Will Be Written + (03:51:01, 4 December 2024)