Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- SNRC-1344, Advises That Change of Power Supply for Alternate Rod Insertion Sys Trip Logic to Uninterruptible Source Installed,Per 870526 Committment + (03:19:49, 4 December 2024)
- ML20215G876 + (03:19:52, 4 December 2024)
- ML20215G875 + (03:19:53, 4 December 2024)
- PNO-V-87-045, licensee Discovered Seperation Between Base Plate Grout & Concrete on Support SS-81 on Main Steam Line B.On 870616,dynamic Analysis Reperformed for Main Steam Supports.Supports Reinstalled W/Proper Design Loads + (03:19:53, 4 December 2024)
- ST-HL-AE-2069, Forwards marked-up Rev to FSAR Section 2.5.6 Re Embankment Settlement,Changing Settlement Estimate from 1 to 2 Inches to 2 to 4 Inches.Proposed SER Revs Also Encl + (03:19:54, 4 December 2024)
- 05000528/LER-1986-054, :on 860914,Limiting Condition for Operation 3.0.3 Entered Due to Inoperable Msiv.Caused by Inconsistent Tech Specs.Tech Spec Rev to Allow Testing W/O Inoperability Condition Will Be Pursued + (03:19:56, 4 December 2024)
- ML20215G868 + (03:19:56, 4 December 2024)
- ML20215G865 + (03:19:57, 4 December 2024)
- ML20215G864 + (03:19:57, 4 December 2024)
- ML20215G862 + (03:19:58, 4 December 2024)
- ML20215G857 + (03:19:59, 4 December 2024)
- ML20215G858 + (03:19:59, 4 December 2024)
- 0CAN108602, Forwards Addl Info in Response to IE Bulletin 85-003 Re motor-operated Valve Common Mode Failures.Method to Determine Differential Pressure Across Valves & to Estimate Switch Settings Addressed + (03:20:00, 4 December 2024)
- ML20215G850 + (03:20:01, 4 December 2024)
- IR 05000461/1986064 + (03:20:03, 4 December 2024)
- ML20215G848 + (03:20:04, 4 December 2024)
- ML20215G846 + (03:20:04, 4 December 2024)
- ML20215G845 + (03:20:05, 4 December 2024)
- ML20215G843 + (03:20:06, 4 December 2024)
- ML20215G835 + (03:20:07, 4 December 2024)
- ML20215G833 + (03:20:07, 4 December 2024)
- 05000155/LER-1987-007-01, :on 870518,reactor Protection Sys Actuation Occurred During Normal Reactor Shutdown.Caused by Susceptibility of Picoameters to Electrical Noise at Low Neutron Flux Levels + (03:20:10, 4 December 2024)
- ML20215G829 + (03:20:10, 4 December 2024)
- ML20215G827 + (03:20:11, 4 December 2024)
- ML20215G821 + (03:20:12, 4 December 2024)
- ML20215G820 + (03:20:12, 4 December 2024)
- 3F1086-11, Suppl 2 to Tech Spec Change Request 139,amending License DPR-72 to Reduce Frequency of Diesel Generator Cold Fast Start Tests to Semiannual.Amend Fee Submitted W/Original Request on 851028.W/Certificate of Svc + (03:20:13, 4 December 2024)
- ML20215G816 + (03:20:13, 4 December 2024)
- ML20215G812 + (03:20:14, 4 December 2024)
- ML20215G809 + (03:20:15, 4 December 2024)
- ML20215G803 + (03:20:16, 4 December 2024)
- ML20215G804 + (03:20:16, 4 December 2024)
- ML20215G802 + (03:20:17, 4 December 2024)
- ML20215G796 + (03:20:18, 4 December 2024)
- ML20215G788 + (03:20:21, 4 December 2024)
- RBG-26132, Ro:On 870420,during Surveillance Test Procedure STP-000-0001,temps in North End of Main Steam Tunnel Rose Above Tech Spec Limit of 122 F for More than 8 H.Tech Spec Mod Request 86-0342 Submitted to Increase Temp Limits + (03:20:22, 4 December 2024)
- PNO-IV-87-029, on 870618,151 Days of Continuous Operation Terminated Due to Reactor Scram on High Water Level in Reactor Vessel.Licensee Investigating Cause.Plant to Be Shut Down for 7 Days for Maint Activities + (03:20:25, 4 December 2024)
- ML20215G779 + (03:20:26, 4 December 2024)
- ML20215G783 + (03:20:26, 4 December 2024)
- ML20215G774 + (03:20:27, 4 December 2024)
- ML20215G772 + (03:20:28, 4 December 2024)
- ML20215G771 + (03:20:29, 4 December 2024)
- ML20215G768 + (03:20:30, 4 December 2024)
- 05000237/LER-1986-023-04, :on 860920,reactor Bldg Ventilation Sys Isolated & Standby Gas Treatment Sys Initiated.Caused by Power Supply 2-1705-7B Failure Due to Defective Dial Component.Power Supply Replaced + (03:20:32, 4 December 2024)
- ML20215G765 + (03:20:32, 4 December 2024)
- ML20215G759 + (03:20:33, 4 December 2024)
- 05000311/LER-1986-009-02, :on 860911,during Routine Power Operation, Reactor Trip Occurred.Caused by Electrical Fault in 4,160/ 230-volt Transformer 2F.Transformer Replaced.Investigation Continuing + (03:20:35, 4 December 2024)
- 05000440/LER-1987-033, :on 870517,discovered That Performance of Surveillance Instruction Placed Both Trains of Standby Liquid Control Sys in Inoperable Condition.Caused by Inadequate Procedure.Procedure Revised + (03:20:36, 4 December 2024)
- ML20215G754 + (03:20:37, 4 December 2024)
- ML20215G749 + (03:20:38, 4 December 2024)
- ML20215G753 + (03:20:38, 4 December 2024)
- 05000313/LER-1987-002-01, :on 870516,problems Encountered W/Main Turbine electro-hydraulic Control During Electrical Storm.Caused by Defective Analog Comparator Card.On 870517,turbine Tripped Upon Insertion of New Card.Plant Stabilized + (03:20:40, 4 December 2024)