Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20216B918 + (01:59:13, 4 December 2024)
- ML20216B917 + (01:59:14, 4 December 2024)
- 05000336/LER-1998-003-02, :on 980113,inadequate Evaluation Between Reactor Internals & Rv Occurred.Caused by Inadequate Design Review.Appropriate Structural Analyses Revised + (01:59:16, 4 December 2024)
- ML20216B909 + (01:59:17, 4 December 2024)
- ML20216B906 + (01:59:18, 4 December 2024)
- ML20216B905 + (01:59:19, 4 December 2024)
- ML20216B903 + (01:59:20, 4 December 2024)
- ML20216B902 + (01:59:21, 4 December 2024)
- ML20216B897 + (01:59:24, 4 December 2024)
- ML20216B898 + (01:59:24, 4 December 2024)
- 05000336/LER-1998-003, Forwards LER 98-003-00,documenting Event That Occurred at Unit 2 on 980113.Util Commitments Made within Ltr Included in Attachment 1 + (01:59:25, 4 December 2024)
- ML20216B894 + (01:59:26, 4 December 2024)
- B17154, Provides Response to Violations Noted & Payment of Civil Penalty in Amount of $55,000.00.Corrective Actions:Fill & Vent Procedures for ECCS Piping Sys Will Be Formalized & Completed Prior to Start of Sixth Refueling Outage + (01:59:31, 4 December 2024)
- ML20216B888 + (01:59:32, 4 December 2024)
- ML20216B890 + (01:59:32, 4 December 2024)
- ML20216B886 + (01:59:33, 4 December 2024)
- ML20216B887 + (01:59:33, 4 December 2024)
- ML20216B885 + (01:59:34, 4 December 2024)
- ML20216B884 + (01:59:35, 4 December 2024)
- ML20216B883 + (01:59:35, 4 December 2024)
- ML20216B880 + (01:59:36, 4 December 2024)
- ML20216B881 + (01:59:36, 4 December 2024)
- ML20216B879 + (01:59:37, 4 December 2024)
- ML20216B877 + (01:59:38, 4 December 2024)
- ML20216B876 + (01:59:39, 4 December 2024)
- 05000455/LER-1987-004-01, :on 870221,permission Given to Adjust Containment Isolation Valve 2PS9357A W/O Initiating Appropriate Limiting Condition for Action Requirement.Caused by Personnel Error.Shift Engineer Counseled + (01:59:45, 4 December 2024)
- ML20216B870 + (01:59:46, 4 December 2024)
- ML20216B872 + (01:59:46, 4 December 2024)
- ML20216B867 + (01:59:47, 4 December 2024)
- ML20216B868 + (01:59:47, 4 December 2024)
- ML20216B866 + (01:59:48, 4 December 2024)
- ML20216B865 + (01:59:49, 4 December 2024)
- ML20216B862 + (01:59:49, 4 December 2024)
- ML20216B859 + (01:59:50, 4 December 2024)
- U-602952, Part 21 Interim Rept 21-98-001:ITT Barton Model 580A Series Dp Indicating Switch Operating Force Concerns.Initially Reported on 980107.Evaluation of Subj Issue Will Be Completed by 980530 + (01:59:50, 4 December 2024)
- ML20216B858 + (01:59:51, 4 December 2024)
- ML20216B855 + (01:59:52, 4 December 2024)
- ML20216B857 + (01:59:52, 4 December 2024)
- ML20216B851 + (01:59:53, 4 December 2024)
- 05000461/LER-1998-009, :on 980203,failure to Account for Design Basis Sys Pressures & Voltages for EDG Air Start Sys Was Noted. Caused by Failure of Design Engineer.Changed Spring Size in Solenoid Valve for Division III EDG Air Start Sys + (01:59:55, 4 December 2024)
- ML20216B848 + (01:59:56, 4 December 2024)
- ML20216B847 + (01:59:56, 4 December 2024)
- ML20216B845 + (02:00:03, 4 December 2024)
- ML20216B843 + (02:00:05, 4 December 2024)
- ML20216B840 + (02:00:06, 4 December 2024)
- ML20216B839 + (02:00:07, 4 December 2024)
- ML20216B838 + (02:00:09, 4 December 2024)
- ML20216B832 + (02:00:11, 4 December 2024)
- ML20216B830 + (02:00:12, 4 December 2024)
- ML20216B829 + (02:00:14, 4 December 2024)
- ML20216B825 + (02:00:15, 4 December 2024)