Forwards Insp Repts 50-313/98-02 & 50-368/98-02 on 980104- 0214 & Notice of Violation Re Failure of Unit 1 Instrumentation & Control Technicians to Remove Three Electrical Jumpers Prior to Restoring RPS
ML20216B839
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 03/10/1998
From: Collins E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Hutchinson C
ENTERGY OPERATIONS, INC.
Shared Package
ML20216B842 List:
References
50-313-98-02, 50-313-98-2, 50-368-98-02, 50-368-98-2, NUDOCS 9803130200
Download: ML20216B839 (5)


See also: IR 05000313/1998002

Text

e

gemas % ,

UNIT ED ST ATES

f

.t

NUCLEAR REGULATORY COMMISSION

.

.

R EGION IV

611 RYAN PLAZA DRIVE, SUITE 400

9....*[

V

5

AR LINGTON, T E XAS 76011-8064

MAR I 01998

C. Randy Hutchinson, Vice President

Operations

Arkansas Nuclear One

Entergy Operations, Inc.

1448 S.R. 333

Russellville, Arkansas 72801-0967

SUBJECT: NRC INSPECTION REPORT 50-313/98-02; 50-368/98-02 AND NOTICE OF

VIOLATION

Dear Mr. Hutchinson:

From January 4 through February 14,1998, a routine resident inspection was conducted at your

Arkansas Nuclear One, Units 1 and 2, reactor facility. The enclosed report presents the scope

and results of that inspection.

During the 6-week period covered by this inspection, your conduct of activities at the ANO

facility was generally characterized by safety-conscious operations, sound engineering and

maintenance practices, and appropriate radiological controls. One violation of NRC

requirements was identified. The violation resulted from the failure of Unit 1 instrumentation and

control technicians to remove three electricaljumpers prior to restoring a reactor protection

system channel to service following surveillance testing.

The violation is cited in the enclosed Notice of Violation (Notice) and the circumstances

surrounding this violation are described in detail in the enclosed report. Please note that you are

required to respond to this letter and should follow the instructions specified in the enclosed

Notice when preparing your response. The NRC will use your response, in part, to determine

j

whether further enforcement action is necessary to ensure compliance with regulatory

requirements. In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this

c[

letter, its enclosure (s), and your response will be placed in the NRC Public Document

Room (PDR).

Should you have any questions concerning this inspection, we will be pleased to discuss them

with you.

Sincerely,

i1

w,)

)duc

2

.

c

l

w

Elmo E. Collins, Chief

Project Branch C

Division of Reactor Projects

9803130200 900310

PDR

ADOCK 05000313

g

PDR

'

,,

.

Entergy Operations, Inc.

-2

Docket Nos.: 50-313

50-368

License Nos.: DPR-51

NPF-6

Enclosures:

1. Notice of Violation

2. NRC Inspection Report

50-313/98-02; 50-368/98-02

cc w/ enclosures:

Executive Vice President

& Chief Operating Officer

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286-1995

Vice President

Operations Support

Entergy Operations, Inc.

P.O. Box 31995

Jackson, Mississippi 39286

Manager, Washington Nuclear Operations

ABB Combustion Engineering Nuclear

Power

12300 Twinbrook Parkway, Suite 330

Rockville, Maryland 20852

County Judge of Pope County

Pope County Courthouse

Russellville, Arkansas 72801

Winston & Strawn

l

1400 L Street, N.W.

Washington, D.C. 20005-3502

David D. Snellings, Jr., Director

Division of Radiation Control and

Emergency Management

Arkansas Department of Health

4815 West Markham Street, Mail Slot 30

Little Rock, Arkansas 72205-3867

}

-

.

Entergy Operations, Inc.

3-

Manager

i

Rockville Nuclear Licensing

Framatome Technologies

1700 Rockville Pike, Suite 525

Rockville, Maryland 20852

.

.

Entergy Operations, Inc.

-4-

E-Mail report to T Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

bec to DCD (IE01)

bec distrib. by RIV:

Regional Administrator

Resident inspector

DRP Director

MIS System

Branch Chief (DRP/C)

RIV File

Project Engineer (DRP/C)

DRS-PSB

Branch Chief (DRP/TSS)

DOCUMENT NAME: R:\\_ANO\\AN802RP.KMK

To receive copy of document, indicate in box:"c" = Copy without enclosures "E" = Copy with enclosures "N" = No copy

RIV:RI

RIV:RI

RIV: SRI

C:D@/S

SCBurton

JFMelfi

KMKennedy

EECollins

2/27/98

2/27/98

2/27/98

2Q98

OFFICIAL RECORD CORP

.a

.e

N I b '"~

Entergy Operations, Inc.-

-4

E-Mail report to T. Frye (TJF)

E-Mail report to D. Lange (DJL)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

E-Mail report to Richard Correia (RPC)

E-Mail report to Frank Talbot (FXT)

bec to DCD (IE01)

bec distrib. by RIV:

Regional Administrator

Resident inspector

DRP Director

MIS System

Branch Chief (DRP/C)

RIV File

Project Engineer (DRP/C)

DRS-PSB

Branch Chief (DRP/TSS)

l

!

l

DOCUMENT NAME: R:\\_ANO\\AN802RP.KMK

To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy

RIV:RI

RIV:RI

RIV: SRI

C:DfilP/f

f.

SCBurton

JFMelfi

KMKennedy

EEColiins

2/27/98

2/27/98

2/27/98

JLf98

OFFICIAL RECORD COFF

130020