ML20216B865
| ML20216B865 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point |
| Issue date: | 05/01/1987 |
| From: | Roberts E EG&G IDAHO, INC., IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY |
| To: | Carrington M Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20216B869 | List: |
| References | |
| CON-FIN-D-6001, CON-FIN-D-6002 EWR-113-87, GL-83-28, NUDOCS 8706300167 | |
| Download: ML20216B865 (1) | |
Text
_ _ _ _
Pon.
l
/NEA 16ho Neuend EM Laboomwr May 1. 1987 Mr. M. Carrington, Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 TRANSMITTAL OF FINAL REPORT, "CONFORMANCE TO GENERIC LETTER 83-28, ITEM 2.2.2--VEND 0R INTERFACE PROGRAMS FOR ALL OTHER SAFETY-RELATED COMPONENTS: NINE MILE POINT-1 AND -2," EGG-NTA-7611, APRIL 1987 i
(FINS D6001 AND D6002) - EWR-113-87 Ref: NRC Form 189, " Evaluation of Conformance to Generic Letter 83-28 For ors (Project 2)" (D6001); " Evaluation of Conformance to Generic Letter 83-28 For OLs (Project 3)" (D6002)
Dear Mr. Carrington,
j i
Transmitted herewith is the above subject report.
]
The report documents INEL's evaluation of the licensee / applicant actions in response to NRC Generic Letter 83-28, Item 2.2.2--Vendor Interface Programs for All Other Safety-Related Components.
Based on the licensee / applicant submittals, we conclude that the plant conforms to the generic letter on this item.
However, a formal interface with vendors of major safety-related equipment needs to be established.
Very trul yours E. W. Roberts, Manager NRC Headquarters Support ACU:gp
Enclosure:
As Stated cc:
G. L. Jones, DOE-ID 1
D. Lasher, SICB (2)
J. O. Zane, EG&G Idaho, Inc. (w/o Encl.)
8706300167 870501 PDR ADOCK 05000220 P
$4E G s G wa..
114to nockvise rike suite tro nockvnte, Mo 20est