Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19323H708 + (23:49:40, 31 December 2024)
- 05000346/LER-1980-036, Forwards LER 80-036/03L-1 + (23:49:41, 31 December 2024)
- 05000339/LER-1980-004-03, /03L-0:on 800519,during Mode 3 Operation,Steam Generator Level Channel LT-2475 Indicated Level 9% Lower than Two Redundant Channels.Caused by Voltage Drift.Channel Was Placed in Trip Mode + (23:49:45, 31 December 2024)
- 05000339/LER-1980-004, Forwards LER 80-004/03L-0 + (23:49:46, 31 December 2024)
- ML19323H700 + (23:49:48, 31 December 2024)
- ML19323H699 + (23:49:50, 31 December 2024)
- ML19323H697 + (23:49:51, 31 December 2024)
- ML19323H698 + (23:49:51, 31 December 2024)
- ML19323H695 + (23:49:53, 31 December 2024)
- ML19323H696 + (23:49:53, 31 December 2024)
- ML19323H693 + (23:49:56, 31 December 2024)
- ML19323H692 + (23:49:58, 31 December 2024)
- ML19323H691 + (23:50:00, 31 December 2024)
- ML19323H689 + (23:50:01, 31 December 2024)
- 05000339/LER-1980-008-03, /03L-0:on 800521,during Mode 3 Operation,Redundant Channel Protection Was Lost.Caused by Personnel Not Placing Tave Protection Loop Failed Channel in Trip Mode within Required Time.Failed Channel Placed in Trip Mode + (23:50:02, 31 December 2024)
- 05000339/LER-1980-008, Forwards LER 80-008/03L-0 + (23:50:09, 31 December 2024)
- ML19323H684 + (23:50:11, 31 December 2024)
- ML19323H681 + (23:50:13, 31 December 2024)
- B10009, Forwards Reload Safety Analysis, Demonstrating That Cycle 4 Reload Assures Continued Conformance to Design & Safety Limits of Facility + (23:50:14, 31 December 2024)
- ML19323H680 + (23:50:14, 31 December 2024)
- ML19323H677 + (23:50:16, 31 December 2024)
- B10011, Provides Descriptive Info & Design Assessment of Proposed Low Level Radwaste Storage Facility Onsite.No NRC Review Required.Facility Will Be Operational Late 1980 + (23:50:17, 31 December 2024)
- ML19323H674 + (23:50:19, 31 December 2024)
- ML19323H673 + (23:50:21, 31 December 2024)
- ML19323H672 + (23:50:21, 31 December 2024)
- ML19323H671 + (23:50:22, 31 December 2024)
- ML19323H670 + (23:50:23, 31 December 2024)
- ML19323H668 + (23:50:23, 31 December 2024)
- 05000267/LER-1980-024-03, /03L-0:on 800512,at 47% Thermal power,1C Circulator Seal Differential Pressure Decreased Significantly Due to Unknown Causes.Equalizing Valve Closed & 1C Circulator Buffer Helium Pressure Returned to Normal + (23:50:24, 31 December 2024)
- 05000267/LER-1980-024, Forwards LER 80-024/03L-0 + (23:50:26, 31 December 2024)
- ML19323H664 + (23:50:27, 31 December 2024)
- ML19323H662 + (23:50:28, 31 December 2024)
- ML19323H661 + (23:50:32, 31 December 2024)
- ML19323H659 + (23:50:33, 31 December 2024)
- 05000219/LER-1980-018-03, /03L-0:on 800507,during Monthly Surveillance Testing of Reactor High Pressure Scram sensors,RE03D Found to Be Less Conservative than Specified.Caused by Sensor Repeatability.Sensor Reset + (23:50:34, 31 December 2024)
- ML19323H657 + (23:50:36, 31 December 2024)
- ML19323H656 + (23:50:37, 31 December 2024)
- 05000219/LER-1980-018, Forwards LER 80-018/03L-0 + (23:50:38, 31 December 2024)
- ML19323H652 + (23:50:39, 31 December 2024)
- ML19323H651 + (23:50:40, 31 December 2024)
- ML19323H650 + (23:50:41, 31 December 2024)
- ML19323H648 + (23:50:41, 31 December 2024)
- ML19323H647 + (23:50:44, 31 December 2024)
- ML19323H646 + (23:50:44, 31 December 2024)
- 05000029/LER-1950-029, Advises That LER 50-29/80-05 Was Not Used for 1980 + (23:50:46, 31 December 2024)
- ML19323H643 + (23:50:47, 31 December 2024)
- ML19323H642 + (23:50:48, 31 December 2024)
- ML19323H641 + (23:50:48, 31 December 2024)
- ML19323H640 + (23:50:49, 31 December 2024)
- ML19323H639 + (23:50:49, 31 December 2024)
- ML19323H637 + (23:50:51, 31 December 2024)