Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19331C883 + (08:53:15, 31 December 2024)
- ML19331C879 + (08:53:16, 31 December 2024)
- ML19331C877 + (08:53:18, 31 December 2024)
- ML19331C878 + (08:53:18, 31 December 2024)
- ML19331C875 + (08:53:19, 31 December 2024)
- ML19331C874 + (08:53:19, 31 December 2024)
- ML19331C872 + (08:53:20, 31 December 2024)
- ML19331C870 + (08:53:21, 31 December 2024)
- ML19331C871 + (08:53:21, 31 December 2024)
- B10038, Forwards Revised & Addl Electrical Qualification Work Sheets & Qualification Documentation Work Sheets for Components Located Outside Containment & Subj to High Radiation Levels + (08:53:22, 31 December 2024)
- ML19331C867 + (08:53:24, 31 December 2024)
- ML19331C866 + (08:53:25, 31 December 2024)
- ML19331C865 + (08:53:26, 31 December 2024)
- ML19331C864 + (08:53:27, 31 December 2024)
- ML19331C863 + (08:53:34, 31 December 2024)
- ML19331C860 + (08:53:37, 31 December 2024)
- ML19331C859 + (08:53:38, 31 December 2024)
- ML19331C858 + (08:53:39, 31 December 2024)
- IR 05000328/1980011 + (08:53:40, 31 December 2024)
- ML19331C856 + (08:53:42, 31 December 2024)
- ML19331C855 + (08:53:43, 31 December 2024)
- ML19331C854 + (08:53:44, 31 December 2024)
- ML19331C853 + (08:53:45, 31 December 2024)
- ML19331C852 + (08:53:46, 31 December 2024)
- ML19331C851 + (08:53:46, 31 December 2024)
- 05000333/LER-1980-063-03, /03L-0:on 800717,during Normal Shutdown, Surveillance Revealed That Average Power Range Monitor E Indicated 48 When Required to Read Between 49 & 51.Caused by Instrument Drift.Monitor Recalibr + (08:53:48, 31 December 2024)
- 05000327/LER-1980-118-03, /03L-0:on 800711,upper & Lower Containment Air Radiation monitors,1-RM-90-112 & -106,declared Inoperable. Caused by Upstream Sample Air Valves Closing on Loss of Control Air.Cause of Loss of Control Air Unknown + (08:53:49, 31 December 2024)
- 05000333/LER-1980-062, Forwards LER 80-062/03L-0 + (08:53:51, 31 December 2024)
- ML19331C846 + (08:53:53, 31 December 2024)
- ML19331C844 + (08:53:54, 31 December 2024)
- 05000333/LER-1980-063, Forwards LER 80-063/03L-0 + (08:53:55, 31 December 2024)
- 05000267/LER-1980-040-03, /03L-0:on 800712,plant Liquid Effluent Sample Required by SR Nr 1.1 Not Taken.Caused by Personnel Time Required to Perform Semiannual Auxiliary Cooling Method Test.Sampling Resumed Next Shift + (08:53:57, 31 December 2024)
- ML19331C840 + (08:53:58, 31 December 2024)
- 05000327/LER-1980-118, Forwards LER 80-118/03L-0 + (08:53:59, 31 December 2024)
- A800039, Updates Re Status of Mark I Containment Program Mods.Installation of Torus Miter Joint Saddles,Mod of Torus Internal Structures & Mod of 45 Piping Supports on Discharge Lines Will Be Completed by Sept 1981 + (08:54:00, 31 December 2024)
- ML19331C836 + (08:54:03, 31 December 2024)
- ML19331C835 + (08:54:05, 31 December 2024)
- ML19331C834 + (08:54:10, 31 December 2024)
- 05000267/LER-1980-040, Forwards LER 80-040/03L-0 + (08:54:11, 31 December 2024)
- ML19331C829 + (08:54:16, 31 December 2024)
- ML19331C828 + (08:54:17, 31 December 2024)
- ML19331C826 + (08:54:18, 31 December 2024)
- 05000267/LER-1980-035-03, /03X-1:on 800625,during Regeneration,Condensate Polisher Resin,Waste Water Was Discharged to Plant Effluent Sys Rather than Waste Neutralizing Tank.Caused by Failed Beckman Conductivity Cell.Cell Replaced + (08:54:19, 31 December 2024)
- ML19331C824 + (08:54:21, 31 December 2024)
- 05000213/LER-1980-011-03, /03L-0:on 800801,investigation Revealed That Surveillance Leak Testing of Containment Personnel Hatch Had Not Been Performed Since Refueling Outage.Caused by Personnel Oversight.Computerized Schedule Sys Developed + (08:54:23, 31 December 2024)
- 05000267/LER-1980-035, Forwards LER 80-035/03X-1 + (08:54:25, 31 December 2024)
- ML19331C820 + (08:54:27, 31 December 2024)
- 05000213/LER-1980-012-03, /03L-0:on 800717,during Precritical Checks,Reactor Coolant Pump 2 Seal Water Supply Bypass Valve Stem Bushing Broke,Allowing Valve to Go Full Open.Caused by High Closing Torque & Valve Misapplication.Vendor Will Investigate + (08:54:32, 31 December 2024)
- ML19331C817 + (08:54:35, 31 December 2024)
- 05000327/LER-1980-126-03, /03L-0:on 800627,while in Mode 3,two Sets of Lower Containment Purge Exhaust Valves Found Open.Caused by Reactor Operator Error.Operator Cautioned & Further Training Initiated + (08:54:36, 31 December 2024)
- ML19331C814 + (08:54:37, 31 December 2024)