Responds to NRC Re Violation Noted in IE Insp Rept 50-328/80-11.Corrective Actions:Rept of Ultrasonic Examination Will Be Revised to Include Space to Document Incomplete Scans
ML19331C851
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 07/17/1980
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19331C845 List:
References
NUDOCS 8008190624
Download: ML19331C851 (2)


Text

'g TENNESSEE VA. LL..EY AUTHORITY pn n n,

CH ATTANOOG A; TEsp' SEC 37.501 l,

O 400 Chestnut Street Tower 11 k7k 980

) dOb b Ju Mr. James P. O'Reilly, Director Of fice of Inspection and Enforcement U.S. Nuclear Regulatory Commission Region II - Suite 3100 101 Marietta Street Atlanta, Georgia 30303

Dear Mr. O'Reilly:

SEQUOYAH NUCLEAR PLANT UNIT 2 - NRC REGION II LETTER RII:LD:' 50-328/

80 INSPECTOR REPORT - RESPONSE TO DEFICIENCY The subject letter dated June 25, 1980, cited TVA with one deviation in accordance with 10 CFR 2.201.

Enclosed is our response to this deviation.

If you have any questions concerning this matter, please get in touch with D. L. Lambert at FTS 857-2581.

Very truly yours, TENNESSEE VALLEY AUTHORITY 3

. bl. Mills,.fanager Nuclear Regulation and Safety Enclosure cc:

Mr. Victor Stello, Jr., Director (Enclosure)

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 WhCIAL An Eaual Opportunity Employer 8008190

$2Y

o o

o l

ENCLOSURE SEQUOYAH NUCLEAR PLANT UNIT 2 RESPONSE TO NRC DEFICIENCY FAILURE OF ULTRASONIC PROCEDURE TO ADEQUATELY PROVIDE INSTRUCTIONS AND FAILURE OF THE ULTRASONIC EXAMINERS TO COMPLY WITH THE PROCEDURE Deficiency 50-328/80-11-02 As required by 10 CFR 50, Appendix B, Criterion V, and implemented by Paragraph 17.1A.5, " Activities affecting quality shall be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and shall be accomplished in accordance with these initructions, procedures, or drawings." TVA's ultrasonic examination p ocedures N-UT-1, Rev. 3, and N-UT-6, Rev. 1, require scan limitations and wall thickness measurements to be recorded.

Contrary to the above, ultrasonic examination personnel have not recorded scan limitations, nor does the procedure provide a space on the report form for recording such data.

Corrective Action Taken and Results Achieved The NDE examiners were cautioned and reminded that any and all failure to obtain complete scans must be documented on the report of ultrasonic examination.

Steps Taken to Avoid Further Recurrence The report of ultrasonic examination will be revised to include a space to document incomplete scans.

Date of Full Compliance The NDE examiners were cautioned immediately af ter the NRC inspector brought the concern to TVA's attention. The report of ultrasonic examina-tion data sheet will be revised by August 29, 1980. TVA will be in full compliance by September 5, 1980.

e

.~ -

... - - -