Text
_,
<
g Mr
Y
o
UNITED STATES
I
!
NUCLEAR REGULATORY COMMISSION
~
e
$
$
REGION 11
g
[
101 MARIETTA ST,. N.W., SulTE 3100
'
- j'
ATLANTA, GEORCIA 30303
JUN 2 51980
In Reply Refer To:
RII:LDZ
50-328/80-11
Tennessee Valley Authority
ATTN:
H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, TN 37401
Gentlemen:
This refers to the inspection conducted by L. D. Zajac of this office on May 19-22,
1980, of activities authorized by NRC Construction Permit No. CPPR-73 for the
Sequoyah facility, and to the discussion of our findings held with T. Northern
at the conclusion of the inspection.
Arras examined during tne inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Two new unresolved items resulted from this inspection and are discussed in the
enclosed report. These items will be examined during subsequent inspections.
During the inspectica, it was found that certain activities under your license
appear to be in noncompliance with NRC requirements. This item and references
to pertinent requirements are listed in the Notice of Violation enclosed here-
with as Appendix A.
This notice is sent to you pursuant to the provisions of
Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations.
Section 2.201 requires you to submit to this office, within 20
days of your receipt of this notice, a written statement or explanation in reply
including:
(1) corrective steps which have been taken by you and the results
achieved; (2) corrective steps which will be taken to avoid further concom-
pliance; and (3) the date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the informatior. s proprietary, and should be prepared so
that proprietary information ident.iied in the application is contained in a
separate part of the document.
If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
.8008290 g
.. -
,
- - -
.
-
.
s'
9
Jul4 2 51980
Tennessee Valley Authority
-2-
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
M)
.?
C. E. Murph , efiieff
Resitor Construction and Engineering
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report No. 50-328/80-11
!
cc w/ encl.
G. G. Stack, Project Manager
P. O. Box 2000
Daisy, TN 37319
J. M. Ballentine
Plant Superintendent
P. O. Box 2000
Daisy, TN 37319
J. F. Cox
400 Commerce Street
W10C131 C-K
Knoxville, TN 37902
M. J. Burzynski, Project Engineer
400 Chestnut Street Tower II
Chattanooga, TN 37401
T. B. Northern
Construction Engineer
Post Office Box 2000
Spring City, TN 37381
H. N. Culver
249-A HBB
400 Commerce Avenue
Knoxville, TN 37902