Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19260C374 + (18:22:44, 3 January 2025)
- ML19260C373 + (18:22:46, 3 January 2025)
- 05000346/LER-1979-112, Forwards LER 79-112/03L-0 + (18:22:49, 3 January 2025)
- 05000321/LER-1979-095-03, /03L-0:on 791126,during Normal Plant Operation, Discovered That 791126 Battery Individual Cell Surveillance Procedure Not Performed.Caused by Personnel Oversight. Procedure Performed on 791127 + (18:22:54, 3 January 2025)
- 05000321/LER-1979-095, Forwards LER 79-095/03L-0 + (18:22:58, 3 January 2025)
- ML19260C366 + (18:23:00, 3 January 2025)
- ML19260C364 + (18:23:02, 3 January 2025)
- 05000302/LER-1979-107-03, /03L-0:on 791120,following Routine Pressurizer Sampling,Chemical Addition Isolation Valve Would Not Close. Caused by Inadequate Design.Installed Mod 79-11-81 Providing Pneumatic Assist During Valve Closing + (18:23:06, 3 January 2025)
- ML19260C361 + (18:23:08, 3 January 2025)
- ML19260C360 + (18:23:09, 3 January 2025)
- 05000302/LER-1979-107, Forwards LER 79-107/03L-0 + (18:23:12, 3 January 2025)
- ML19260C356 + (18:23:14, 3 January 2025)
- 05000346/LER-1979-105, Revised LER 79-105/01T-1:on 791109,during Review of IE Bulletin 79-21 Response,Noted Steam Generator Low Level Trip Setpoints to Steam & Feedwater Rupture Control Sys Channels 1 & 2 Were Below Tech Specs.Caused by Error in Poin + (18:23:20, 3 January 2025)
- ML19260C353 + (18:23:29, 3 January 2025)
- ML19260C350 + (18:23:34, 3 January 2025)
- ML19260C349 + (18:23:37, 3 January 2025)
- ML19260C348 + (18:23:39, 3 January 2025)
- 05000312/LER-1979-019-03, /03L-0:on 791125,during Routine Plant Equipment Insp,Discovered Weld Leak on Seal Injection Line.Cause Not Stated.Defective Portion of Weld Ground Out & Weld Dye Penetrant Checked + (18:23:41, 3 January 2025)
- 05000312/LER-1979-019, Forwards LER 79-019/03L-0 + (18:23:45, 3 January 2025)
- ML19260C343 + (18:23:49, 3 January 2025)
- ML19260C342 + (18:23:51, 3 January 2025)
- 05000366/LER-1979-126-03, /03L-0:on 791121,during Plant Svc Water Pump Operability Test,Svc Water Pump Failed to Meet ASME Section II Requirements.Caused by Distortion of Impeller by Metal Foreign Object.Pump Rebuilt + (18:24:28, 3 January 2025)
- ML19260C340 + (18:24:38, 3 January 2025)
- 05000366/LER-1979-126, Forwards LER 79-126/03L-0 + (18:25:12, 3 January 2025)
- ML19260C337 + (18:25:19, 3 January 2025)
- 05000312/LER-1979-004-04, /04T-0:on 791203,plant Effluent Samples Indicated Chlorine Levels Exceeded Tech Spec Limits.Caused by Partial Blockage of Sewage Sys Inlet Line.Dilution Flow Increased & Sewage Sys Hypochlorite Pump Stroke Reduced + (18:25:24, 3 January 2025)
- ML19260C333 + (18:25:27, 3 January 2025)
- 05000312/LER-1979-004, Forwards LER 79-004/04T-0 + (18:25:32, 3 January 2025)
- ML19260C330 + (18:25:35, 3 January 2025)
- ML19260C329 + (18:25:37, 3 January 2025)
- ML19260C328 + (18:25:38, 3 January 2025)
- ML19260C327 + (18:25:40, 3 January 2025)
- ML19260C325 + (18:25:41, 3 January 2025)
- ML19260C323 + (18:25:43, 3 January 2025)
- ML19260C322 + (18:25:46, 3 January 2025)
- ML19260C321 + (18:25:47, 3 January 2025)
- ML19260C320 + (18:25:48, 3 January 2025)
- ML19260C319 + (18:25:51, 3 January 2025)
- ML19260C318 + (18:25:52, 3 January 2025)
- ML19260C317 + (18:25:53, 3 January 2025)
- ML19260C315 + (18:25:55, 3 January 2025)
- ML19260C314 + (18:25:56, 3 January 2025)
- ML19260C313 + (18:25:57, 3 January 2025)
- ML19260C312 + (18:25:59, 3 January 2025)
- ML19260C310 + (18:26:08, 3 January 2025)
- ML19260C305 + (18:26:09, 3 January 2025)
- IR 05000367/1979004 + (18:26:12, 3 January 2025)
- ML19260C301 + (18:26:14, 3 January 2025)
- ML19260C299 + (18:26:17, 3 January 2025)
- ML19260C298 + (18:26:18, 3 January 2025)
- ML19260C297 + (18:26:20, 3 January 2025)