Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000325/LER-1979-110, Forwards LER 79-110/03L-0 + (14:10:56, 3 January 2025)
- ML19262C010 + (14:11:00, 3 January 2025)
- 05000324/LER-1979-097-03, /03L-0:on 791217,during Normal Plant Operation, torus-to-drywell Vacuum Breaker CAC-X18E Had No Closed Indication.Caused by Valve Flapper Not Completely Closing. Replaced Permanent Magnet Holding Flapper Closed + (14:11:03, 3 January 2025)
- ML19262C008 + (14:11:06, 3 January 2025)
- 05000324/LER-1979-097, Forwards LER 79-097/03L-0 + (14:11:09, 3 January 2025)
- ML19262C004 + (14:11:11, 3 January 2025)
- ML19262C003 + (14:11:12, 3 January 2025)
- ML19262C002 + (14:11:14, 3 January 2025)
- 05000313/LER-1979-023-03, /03L-0:on 791221,during Normal Makeup Operation, Boric Acid Pumps Left Operating,Resulting in Overboration of Reactor Coolant & Automatic Withdrawal of Rod.Caused by Reactor Operator Oversight.Operator Counseled + (14:11:16, 3 January 2025)
- ML19262C000 + (14:11:19, 3 January 2025)
- 05000313/LER-1979-023, Forwards LER 79-023/03L-0 + (14:11:21, 3 January 2025)
- 05000348/LER-1979-066-03, /03L-0:on 791220,while Performing Surveillance One Containment Pressure Channel Declared Inoperable Due to Faulty Connection in B Train Sodium Selection Panel Input Cabinet 1.Caused by Contact Film Build Up + (14:11:26, 3 January 2025)
- 05000368/LER-1979-102-03, /03L-0:on 791221,during Mode 1 Operation,Core C Protection Calculator Failed.Caused by Speed Input Failure. Since Failure Was in Conservative Direction,Unit Returned to Svc + (14:11:35, 3 January 2025)
- ML19262B994 + (14:11:37, 3 January 2025)
- 05000368/LER-1979-101-03, /03L-0:on 791217,during Mode 1 Operation,Refueling Water Tank Level Indicator 2LI-5636-1 Failed High.Caused by Freeze Protection Heat Tracing Not Operating Properly, Allowing Transmitter Sensing Line to Freeze + (14:11:40, 3 January 2025)
- 05000348/LER-1979-066, Forwards LER 79-066/03L-0 + (14:11:43, 3 January 2025)
- 05000368/LER-1979-102, Forwards LER 79-102/03L-0 & Updated LER 79-008/03X-1 + (14:11:45, 3 January 2025)
- 05000368/LER-1979-101, Forwards LER 79-101/03L-0 + (14:11:48, 3 January 2025)
- ML19262B986 + (14:11:49, 3 January 2025)
- ML19262B985 + (14:11:51, 3 January 2025)
- ML19262B984 + (14:11:53, 3 January 2025)
- ML19262B983 + (14:11:54, 3 January 2025)
- ML19262B982 + (14:11:54, 3 January 2025)
- 05000302/LER-1979-109-03, /03L-0:on 791221,following Reactor Trip,Chem/Rod Sampling Showed Reactor Coolant Dose Equivalent I-131 Exceeded 1.0 Uci Per G Contrary to Tech Specs.Caused by Leaking Fuel Pins & Iodine Transient + (14:11:57, 3 January 2025)
- ML19262B979 + (14:11:59, 3 January 2025)
- ML19262B978 + (14:12:00, 3 January 2025)
- 05000302/LER-1979-109, Forwards LER 79-109/03L-0 + (14:12:02, 3 January 2025)
- 05000324/LER-1979-093-03, /03L-1:on 791120,during Normal Reactor Startup, Rods 42-33 & 26-07 Gave Rod Overtravel Alarm When Withdrawn to Notch 48.Probably Caused by Loose Inner Filter on Drive Engaging Uncoupling Rod.Units to Be Overhauled + (14:12:06, 3 January 2025)
- 05000324/LER-1979-093, Forwards LER 79-093/03L-1 + (14:12:10, 3 January 2025)
- ML19262B972 + (14:12:13, 3 January 2025)
- ML19262B970 + (14:12:14, 3 January 2025)
- ML19262B968 + (14:12:15, 3 January 2025)
- ML19262B962 + (14:12:16, 3 January 2025)
- ML19262B961 + (14:12:17, 3 January 2025)
- ML19262B960 + (14:12:18, 3 January 2025)
- ML19262B959 + (14:12:19, 3 January 2025)
- ML19262B958 + (14:12:20, 3 January 2025)
- IR 05000440/1979010 + (14:12:21, 3 January 2025)
- ML19262B954 + (14:12:22, 3 January 2025)
- ML19262B953 + (14:12:24, 3 January 2025)
- ML19262B952 + (14:12:28, 3 January 2025)
- ML19262B951 + (14:12:29, 3 January 2025)
- ML19262B949 + (14:12:30, 3 January 2025)
- ML19262B948 + (14:12:31, 3 January 2025)
- ML19262B947 + (14:12:32, 3 January 2025)
- ML19262B946 + (14:12:33, 3 January 2025)
- ML19262B944 + (14:12:34, 3 January 2025)
- ML19262B943 + (14:12:36, 3 January 2025)
- Spent fuel rack + (14:12:38, 3 January 2025)
- ML19262B942 + (14:12:38, 3 January 2025)
- ML19262B941 + (14:12:39, 3 January 2025)