Forwards List of Applications for Amends to Ol.Requests Approval Before Refueling Outage Scheduled for Mar 1980. Physical Mods to Several safety-related Sys Will Be Delayed If License Amends Are Delayed Further
ML19262C010
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/11/1980
From: Crouse R
TOLEDO EDISON CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
NUDOCS 8001220430
Download: ML19262C010 (3)


Text

b* s TOLEDO EDISON AcsAnc P CacuSE Docket No. 50-346 C'"

(4131259-5221 License No. NPF-3 Serial No. 574 January 11, 1980 Director of Nuclear Reactor Regulation Attention:

Mr. Darrell G. Eisenhut, Acting Director Division of Operating Reactors United States Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Eisenhut:

This letter is in regard to our previous applications for amendments to Facility Operating License No. NPF-3 for Davis-Besse Nuclear Power Station, Unit No. 1.

The attached list includes those applications for amendments for which your approval is requested before our refueling outage presently scheduled for March 1980.

The Technical Specification (TS) change identified as Item 2 of the attached list has to be approved before modification can be made at Davis-Besse Unit 1 to meet or remove the unit's Operating License (OL) Conditions 2.C. (3)(d) and 2.C. (3)(j). These two conditions pertain to overpressure protection for the reactor coolant and decay heat removal systems.

The TS change identified as Item 5 of the attached list is required due to changes that were made at Davis-Besse Unit 1 to meet its OL Condition 2.C. (3)(g), which pertained to degraded offsite grid conditions.

The TS change identified as Item 8 of the attached list has been requested to correct an undesirable operating condition that is required by our present TS.

Toledo Edison requests your immediate attention and expeditious review of the subject amendment applications so we will be able to meet our mutual commitments.

S' I 22:

"'N S!

THE TOLECO ECISCN CCMPANY EDISCN PLAZA 300 MACISCN AVENUE TCLEDO, CHIO 43652 8001220

Docket No. 50-346 License No. NPF-3 Serial No. 574 January 11, 1980 We are willing to meet with you, as necessary, to discuss any of these applications. We are concerned that these amendments have not yet been issued and we can appreciate the extreme workload we have all been under.

However, as you can see from the enclosure, physical modifications to several safety related systems will be delayed if these license amend-ments are delayed any further. We solicit your help in this matter.

Very truly yours, ff

= = d-RPC:FRM:rs Enclosure eN

as Docket No. 50-346 License No. N P F-3 Serial No. 574 January 11, 1980 LICENSE AMENDMENT REQUESTS (Refueling Outage Required)

Toledo Edison Item Date Company Number Description of the Amendment Submitted Serial Number 1

Battery Surve illance 1/11/78 412 2

Pressurizer lleater laterlocks and Associated Instrumentation 3/20/78 421 3

Nuclear Instrumentation Surveillance 3/22/78 422 4

Emergency Core Cooling System Venting 10/23/78 462 5

Blocking Low Voltage Trips of Essential Buses When Starting 3/23/79 487 13.8KV Motors 6

Change Incident Levels for Seal Injection, Seal Retuni and 3/23/79 487 Make up Valves 7

Safety Features Actuation System Surveillance for Containment 3/23/79 487 Vessel Radiation Detection

~

~%j 8

Safety Features Actuation System Incident Level 5 Trip Change 7/13/79 527 CX)

(J7 9

Toledo Edison Company organizational changes 12/6/79 563 10 Reactor Internals Vent Valve Operation and Inspection 1/10/80 575

.