Forwards Safety Evaluation Re Postulated Fuel Handling Accident Inside Containment.Util Evaluation of Incident Is Acceptable
ML19262B949
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 12/20/1979
From: Ziemann D
Office of Nuclear Reactor Regulation
To: Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML19262B950 List:
References
TASK-15-20, TASK-RR NUDOCS 8001220271
Download: ML19262B949 (2)


Text

>

- *; u v..

,n f'

,+ * * * %

f, UNITED STATES

[(, 3 e i

NUCLEAR REGULATORY COMMISSION E

WASHINGTON, D. C. 20555 a

A

.. f

%; v,/

December 20, 1979

%.=

Docket No. 50-213 Mr. W. G. Ccunsil, Vice President Nuclear Engineering and Operations Connecticut Yankee Atcmic Power Ccapany Post Office Box 270 Hartford, Connecticut 06101

Dear Mr. Counsil:

By letter dated January 14, 1977, we requested the Connecticut Yankee Atomic Power Company to submit an evaluation of a postulated fuel handl5g accident insida ce,.tainment at Hadda: Neck.

The :ctential consequences of an accident involving the handling of spent fuel inside containment had not been evaluated previously in a Safety Evaluation for Haddam Neck.

By letters dated March 21, 1977, and October 14, 1977, you submitted the evaluation of this accident, as supacrted by the additional information transmitted by letter dated March 5,1979. We have reviewed your submittals and have concluded that althcugh the potential consequences are screwhat larger than estimated by you, they are appropriately within the exposure guidelines of 10 CFR Part 100 and are, therefore, acceptable.

We have included an evaluation of a 1cwer ;:robability event involving two assembly failures and find the consequences are also within the ex::osure guidelines of 10 CFR Part 100 and are, therefore, acceptable.

Enclosed is our Safety Evaluation of the postulated fuel handling accident inside containment for Haddam Neck.

Sincerely,

%s n

' M" Dennis L. Ziemann,.C ief Operating Reactors ranch #2 Division of Operating React:rs

Enclosure:

Safety Evaluation ec w/ enclosure:

See next page 1785 321 80013c0

December 20, 1979 Mr. W. G. Counsil cc w/ enclosure:

Day, Berry & Howard U. S. Environmental Protection Counselors at Law Agency One Constitution Plaza Region I Office Hartford, Connecticut 06103 ATTN:

EIS CCCRDINATOR JFK Federal Building Superintendent Boston, Massachusetts 02203 Haddam Neck Plant RFD ?l Post Office Box 127E East Hampton, Connecticut 06424 Mr. James R. Himmelwright Nortneast Utilities Service Company P. O. Box 270 Hartford, Connecticut 06101 Russell Library 119 Broad Street Middletown, Connecticut 06457 Board of Selectmen Town Hall Haddam, Connecticut 06103 Connecticut Energy Agency ATTN: Assistant Director Research and Policy Development Department of Planning and Energy Policy 20 Grand Street Hartfura, Connecticut 06106 Director, Technical Assessment Division Office of Radiation Programs

( AW-459)

U. S. Environcental Protection Agency Crystal Mall 42 Arlington, Virginia 20460 178;5 322