Requests NRC Approval of Design Criteria Re Cable Tray Fire Stops.Fire by 800215 Stops Will Be Installed During Outage Scheduled for First Wk of Mar 1980
ML19262B984
Person / Time
Site: Rancho Seco
Issue date: 01/14/1980
From: Mattimoe J
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Harold Denton, Reid R
Office of Nuclear Reactor Regulation
References
NUDOCS 8001220380
Download: ML19262B984 (3)


Text

I

- 2SMUD SACRAMENTO MUNICIPAL UTILITY DISTRICT C 6201 s street. Box 15830. sacramento, California 95813; (916) 452-3211 January 14, 1980 Director of Nuclear Reactor Regulation Attention: Mr. Robert W. Reid, Chief Operating Reactor, Branch 4 U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Docket No. 50-312 Rancho Seco Nuclear Generating Station, Unit No. 1

Dear Mr. Reid:

Paragraph 3.1.21(4) of the Fire Protection Safety Evaluation Report (SER) attached to License Amendment No.19, dated February 28, 1978, describes the following modification for fire area 34, the grade level electrical penetration area:

" install a fire stop to prevent a cable tray fire from bridging the gap between redundant channels."

Paragraph 3.1 of the SER requested that design details be submitted to the NRC for the approval of the modification proposed in Paragraph 3.1.21(4). The design details are listed below:

Desian Details for Imolementino Paraaraoh 3.1.21(4)

To prevent the cable tray fire from bridging the gap between redundant channels, the District will install cable tray fire stoos.

The fire stops will divide the room and orevent loss of redundant cables for a design basis fire.

The fire stops will be constructed as indicated on Sketch 1.

The materials used in the construction of the fire stops are the same materials used in the District's three hour wall penetration fire stop.

The three hour fire stop was qualified in the District's Fire Stop Test Report, Test Section III, which was submitted to the NRC on March 1,1978.

Table 3.1 of the SER requires that the fire stops be installed the end of the 1979 - 1980 refueling outage.

The completion of the 1979 -

1980 outage is scheduled for the first week of March. To complete the modification when required, the District is requesting NRC corTnents and/or 005 S

8001220 380 785 195'

e 2

Mr. Robert W. Reid January 14, 1980 approval on the design criteria by February 15, 1980.

Sincerely, 7/ John 'O. Mattimoe Assistant General Manager and Chief Engineer 1785 196

t.

  • / +.

.1-

.A.

...s+~...

3 W

J i*

.~

s f,

)

f 3

t 7

g-f LSUPPOHT BOAPD FRrA4 I

T T' s

i Ex1 STING UNSTHUT Ft.L ALL VOso:i WITH s

2 TRAY $5 PORTS MACWOOL B US'I FL AME-M ASTIC

  • TI A MASTIC TO FLL Ey!$Tp4G%

{

g

. WSTNUT

, ( r ATTACH MARINITE BOARD TO

(_

},.

THE SEAus tETbvEEN THE TRAY a 00ARD's If UN: STRUT TRAf SUPPOR TS SEE NOTE '2 E

WITH 1/4"80s.TS 8 NUTS 7

p*

/

WITH FENDER WASHERS /

3

,e /4* 8/ANINITE iiOARD FL OR

]

q

/

QJ o....' 0 0..j i.~

I N

oTE s t i r-3/4* MARINITE 80ARO iL OR I (TYP)'

[

/

'/u' G P MAX s

I I2 ILL VOl0S WITH b

b

/*

SE E

M AOWOOL &

Ir CAtA.E TRAf i STIC Q,

1 1 '

FL A*.tE MASTC 71 4 A

O 4

i,,,

l-tLn u.

.. c a. L ;1, l

/

g_Q ll f.E b i l

I

,2= T

,=

g.

<-Sa N m.,

eA u S m9 SEE NOTE e4 1

i 9,

.s I

e

.j END y(y(

geyg.g,g.

fi

!!Q111

(

l. TO WALL OR TO A0JC:TUNG 00ARD
2. OR AS FIELD Cr/DTIOrc. DCTATE I

d 3 6*OH AS FIELD CONDITOJ3 DICTATE E9 h

4. FLAMEMASTIC e 714 IS TO BE SPRAYED ON ALL* SURFACES INCLUDING CABLES, MAR NITE BOARD Q T RAYS WITHIN 82* FROM IHE BMRDS /MtlCATt0N TO YlELD A FINISH ORY COAT APPROX t/B' THICK.