Forwards Proposed Change to QA Manual APL-TOP-1A,Revision 5, Paragraph 7.3.2 Re Purchased Matl Control,Per NRC 800116 Telcon.Change Incorporates ANSI N187-1976,Section 5.2.14 Requirements
ML19262B979
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 01/16/1980
From: Trimble D
ARKANSAS POWER & LIGHT CO.
To: Haass W
Office of Nuclear Reactor Regulation
Shared Package
ML19262B980 List:
References
NUDOCS 8001220369
Download: ML19262B979 (1)


Text

.. s ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 UTTLE ROCK. ARKANSAS 72203 (501)371-4000 January 16, 1980 1-010-20 2-010-16 Mr. Walter P. Haass, Chief Quality Assurance Branch Division of Project Management U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Subject:

Arkansas Nuclear One - Units 1 & 2 Docket Nos . 50-313 and 50-368 License Nos. DPR-51 and NPF-6 Quality Assurance Program TOPICAL Paport (APL-TOP-1A Rev. 5)

(File: 1510.1, 2-1510.1, 0233.1)

Ref: 1) Letter D. C. Trimble to W. P. Haass dated 1/9/80 regarding AP&-TOP-1A Rev. 5

2) Telecon L. W. Humphrey and J. Conway dated 1/16/80

Dear Mr. Haass:

As discussed during the reference 2 telecon, attached are twenty five copies of a proposed change to paragraph 7.3.2 of APL-TOP-1 A Revision 5 not included in the reference 1 letter. -

This change incorporates requirements of ANSI N187-1976 section 5.2.14 (second paragraph, first sentence) .

Sincerely, AN$f David C. Trimble Manager, Licensing DCT:LWH: tw Attachment cc: Messrs. D. A. Rueter D. R. Sikes J. M. Griffin .