Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19269C325 + (11:57:01, 3 January 2025)
- ML19269C313 + (11:57:03, 3 January 2025)
- ML19269C312 + (11:57:04, 3 January 2025)
- ML19269C310 + (11:57:05, 3 January 2025)
- ML19269C307 + (11:57:06, 3 January 2025)
- ML19269C308 + (11:57:06, 3 January 2025)
- ML19269C305 + (11:57:07, 3 January 2025)
- ML19269C301 + (11:57:08, 3 January 2025)
- ML19269C304 + (11:57:08, 3 January 2025)
- ML19269C298 + (11:57:09, 3 January 2025)
- ML19269C300 + (11:57:09, 3 January 2025)
- ML19269C297 + (11:57:10, 3 January 2025)
- ML19269C295 + (11:57:11, 3 January 2025)
- ML19269C294 + (11:57:12, 3 January 2025)
- ML19269C292 + (11:57:12, 3 January 2025)
- 05000302/LER-1979-001-03, /03L-0 on 790101:during Operating Daily Surveillance Log Survey (SP-300),noted That Pressure in B Core Flood Tank Was 630 Psi.Caused by Operator Error During Repressurization + (11:57:14, 3 January 2025)
- 05000368/LER-1978-029-03, /03L-0 on 781227:in Mode 1 Operation,During Main Turbine Roll,Main Steam Relief Valve 2PSV1053 Lifted,Due to Steam Dump Valve Failures.Valve Failed to Reseat,Causing RCS Temp to Drop 107 Feet within 52 Min + (11:57:16, 3 January 2025)
- 05000302/LER-1979-001, Forwards LER 79-001/03L-0 + (11:57:17, 3 January 2025)
- 05000368/LER-1978-032-03, /03L-0 on 781228:during Mode 2 operation,2P7A, Emergency Feedwater Pump a Tripped on Overspeed When Feeding Steam Generators.Cause Was Damaged Lead in Speed Control Unit + (11:57:19, 3 January 2025)
- 05000334/LER-1978-065-03, /03L-0 on 781228:during a Surveillance Test on Control Room Emergency Habitability Sys,Sys Could Not Maintain the Room at Required 1/8 Inch Wc Above Outside Atmosphere.Caused by Leaks in Control Room + (11:57:24, 3 January 2025)
- 05000334/LER-1978-065, Forwards LER 78-065/03L-0 + (11:57:26, 3 January 2025)
- 05000368/LER-1978-030-03, /03L-0 on 781227:in Mode 1 Operation,During Main Turbine Roll,Main Steam Relief Valves 2PSV1053 Lifted,Due to Steam Dump Valve Failures.Failed to Reseat,Causing Excessive RCS Cooldown + (11:57:27, 3 January 2025)
- ML19269C281 + (11:57:28, 3 January 2025)
- ML19269C279 + (11:57:30, 3 January 2025)
- ML19269C280 + (11:57:30, 3 January 2025)
- 05000213/LER-1978-021-03, /03L-0 on 781227:bi-weekly Rod Motion Control Test SUR5.1-23 Not Completed within Required Period.Central Dispatch Station Requested Test Not Be Done Due to Sys Load Considerations.Subsequently Overlooked & Not Rescheduled + (11:57:32, 3 January 2025)
- 05000213/LER-1978-021, Forwards LER 78-021/03L-0 + (11:57:34, 3 January 2025)
- ML19269C275 + (11:57:35, 3 January 2025)
- ML19269C273 + (11:57:36, 3 January 2025)
- ML19269C272 + (11:57:36, 3 January 2025)
- ML19269C271 + (11:57:37, 3 January 2025)
- ML19269C270 + (11:57:37, 3 January 2025)
- ML19269C269 + (11:57:38, 3 January 2025)
- ML19269C268 + (11:57:38, 3 January 2025)
- ML19269C265 + (11:57:39, 3 January 2025)
- ML19269C263 + (11:57:40, 3 January 2025)
- ML19269C264 + (11:57:40, 3 January 2025)
- ML19269C262 + (11:57:41, 3 January 2025)
- ML19269C259 + (11:57:42, 3 January 2025)
- ML19269C258 + (11:57:44, 3 January 2025)
- ML19269C255 + (11:57:45, 3 January 2025)
- ML19269C254 + (11:57:46, 3 January 2025)
- ML19269C252 + (11:57:47, 3 January 2025)
- ML19269C251 + (11:57:49, 3 January 2025)
- ML19269C250 + (11:57:50, 3 January 2025)
- ML19269C246 + (11:57:51, 3 January 2025)
- ML19269C245 + (11:57:53, 3 January 2025)
- ML19269C244 + (11:57:54, 3 January 2025)
- ML19269C242 + (11:57:57, 3 January 2025)
- ML19269C240 + (11:57:58, 3 January 2025)
- ML19269C239 + (11:57:59, 3 January 2025)