ML19269C265

From kanterella
Jump to navigation Jump to search
Forwards Environ Monitoring Rept Summary of Environ Protection Program Respecting Const of Grand Gulf Nuclear Station Units 1 & 2 for 6 Months Ending 781031 Per NRC Exhibit 2-A Referenced in Const Permit
ML19269C265
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 12/29/1978
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: Ballard R
Office of Nuclear Reactor Regulation
Shared Package
ML19269C266 List:
References
AECM-78-98, NUDOCS 7901310024
Download: ML19269C265 (1)


Text

_

MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi P. O. B O X 164 0. J A C K S O N, MIS SIS SIP PI 3 9 2 0 5 paooucTeoN oEpaaTMENT December 29, 1978 Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commissian Washington, D. C.

20555 AUention:

Mr. Ronald L. Ballard, Chief Environmental Projects Branch No. 1 Division of Site Safety And Environmental Analysis

Dear Mr. Ballard:

SUBJECT:

Grand Gulf Nuclear Station Units 1 and 2 CPPR-118 and CPPR-119 Docket Nos. 50-416 and 50-417 File 0272/15970/15983 Transmittal of Environmental Protection Program Report For Six Months Ending October 31, 1978 AECM-78/98 Attached is a report entitled " Summary of Environmental Protection Program Respecting Construction of Grand Gulf Nuclear Statio# Units 1 and 2 for Six Months Ending October 31, 1978."

This report is submitted as required by Staff Exhibit 2-A referenced in subsection 3.E.1 cf Applicant's Construction Permit Nos. CPPR-118 and CPPR--119.

Yours truly,

((J.P.McGaughy,Jr.

Director of Power Production WG/GEO:pa Attachment cc:

Mr. Troy B. Conner, Jr., (w/ Attachment)

Mr. R. C. Travis (w/ Attachment)

I 0

o 7 9 01310 OM\\

l k

Member Middle South Utilities System