Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19269E721 + (11:30:17, 3 January 2025)
- ML19269E718 + (11:30:18, 3 January 2025)
- ML19269E717 + (11:30:19, 3 January 2025)
- ML19269E712 + (11:30:20, 3 January 2025)
- ML19269E713 + (11:30:20, 3 January 2025)
- ML19269E707 + (11:30:21, 3 January 2025)
- ML19269E703 + (11:30:22, 3 January 2025)
- ML19269E700 + (11:30:23, 3 January 2025)
- ML19269E697 + (11:30:24, 3 January 2025)
- ML19269E694 + (11:30:26, 3 January 2025)
- ML19269E695 + (11:30:26, 3 January 2025)
- ML19269E693 + (11:30:27, 3 January 2025)
- IR 05000413/1979007 + (11:30:28, 3 January 2025)
- ML19269E687 + (11:30:30, 3 January 2025)
- ML19269E686 + (11:30:31, 3 January 2025)
- ML19269E684 + (11:30:32, 3 January 2025)
- ML19269E680 + (11:30:33, 3 January 2025)
- ML19269E672 + (11:30:34, 3 January 2025)
- ML19269E669 + (11:30:35, 3 January 2025)
- ML19269E670 + (11:30:35, 3 January 2025)
- ML19269E667 + (11:30:36, 3 January 2025)
- ML19269E664 + (11:30:40, 3 January 2025)
- ML19269E661 + (11:30:41, 3 January 2025)
- ML19269E659 + (11:30:42, 3 January 2025)
- ULNRC-06534, RERP Appendix J, Revision 005 Callaway Plant On-Shift Staffing Analysis Report + (11:30:43, 3 January 2025)
- ML19269E653 + (11:30:43, 3 January 2025)
- ML19269E649 + (11:30:45, 3 January 2025)
- ML19269E651 + (11:30:45, 3 January 2025)
- ML19269E646 + (11:30:46, 3 January 2025)
- ML19269E642 + (11:30:47, 3 January 2025)
- ML19269E634 + (11:30:48, 3 January 2025)
- 05000325/LER-1979-039-03, /03L-0 on 790613:during Normal operation,1B Standby Gas Train de-energized for Approx 40 Minutes.Caused by Hot Spot Breaker for 1B Reactor Water Cleanup Pump Causing Feeder from E-6 to 1XF to Trip.Breaker Removed + (11:30:49, 3 January 2025)
- 05000325/LER-1979-039, Forwards LER 79-039/03L-0 + (11:30:51, 3 January 2025)
- 05000324/LER-1979-041-01, /01T-0 on 790612:during Normal Operation,Reactor Scrammed Due to MSIV Problem & After Scram MSIV Indications Were de-energized.Caused by Power Lead to Dc Solenoid of 2B21-F022D Terminating at Ac Solenoid.Wiring Corrected + (11:30:53, 3 January 2025)
- 05000324/LER-1979-041, Forwards LER 79-041/01T-0 + (11:30:55, 3 January 2025)
- 05000325/LER-1979-043-03, /03L-0 on 790609:during Normal Reactor Startup, Control Rod Drive 18-23 Had No Indication at Notch 30.Logic Checked Correctly.Drywell Instrumentation Will Be Checked During Next Outage + (11:30:56, 3 January 2025)
- 05000325/LER-1979-043, Forwards LER 79-043/03L-0 + (11:30:58, 3 January 2025)
- 05000334/LER-1979-013-03, /03L-0 on 790522:during Surveillance of Control Room Habitability Sys,Pressure Regulators for Control Room Pressurization Were Found Cycling.Caused by Improper Calibr. Controls Tuned & Procedure Revised + (11:31:00, 3 January 2025)
- ML19269E596 + (11:31:01, 3 January 2025)
- 05000334/LER-1979-009-03, /03L-0 on 790320:during Surveillance Test,Diesel Generator 1 Output Breaker Failed to Close Upon Actuation of Control Switch.Cause of Inoperable Breaker Unknown.Operators Reinstructed in Test Circuit & Surveillance Increased + (11:31:04, 3 January 2025)
- ML19269E592 + (11:31:05, 3 January 2025)
- ML19269E584 + (11:31:06, 3 January 2025)
- ML19269E583 + (11:31:06, 3 January 2025)
- ML19269E581 + (11:31:07, 3 January 2025)
- ML19269E579 + (11:31:08, 3 January 2025)
- 05000321/LER-1979-037-01, /01T-0 on 790612:GE Review of Class IE Drywell Equipment Per IE Bulletin 79-01 Found Incomplete Documentation of Limit Switches on MSIV B21-F022 A,B,C & D. Caused by Changed Requirements.New Switch Ordered + (11:31:09, 3 January 2025)
- ML19269E572 + (11:31:11, 3 January 2025)
- 05000321/LER-1979-037, Forwards LER 79-037/01T-0 + (11:31:12, 3 January 2025)
- ML19269E566 + (11:31:13, 3 January 2025)
- ML19269E564 + (11:31:14, 3 January 2025)
- 05000336/LER-1977-056-03, /03X-2 on 771118:during Routine Operation,Aerated Waste Evaporator Concentrates Tank Was Pressurized W/Air & Ruptured.Caused by Application of 100 Psi Air to Tank W/Blockage in Tee in Unvalved Vent Line.No Repair Planned + (11:31:18, 3 January 2025)
- ML19269E562 + (11:31:19, 3 January 2025)