B&W Site Inspector Daily Rept on 790415.Plant Status:Reactor in Cold Shutdown for Maint Outage
ML19269E695
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 04/15/1979
From: Baker K, James Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19269E688 List:
References
FOIA-79-98 NUDOCS 7906290484
Download: ML19269E695 (2)


Text

=. -

iM#

OFFICE OF INSPECTION AND ENFORC".E.NT M6W STTE INSPECTOR DAILY R'IPORT Dcvis-Besse Unit 1 (50-346)

Date: 4/15/79 In sp e c t n.-(s) :

K. R. Baker J. D. Smith Cencral Plant Statua: Mode 5 - Cold Shutdown for Maintenance Outage 1.

Sumary of Licenxea Rauponse to TK solletin 19-05 cnd Supplements:

Review of Similar Transients (Ite.m 2 of IED 70-05A) n.

Cumpletod.

b.

Review and Revision of Operating and Maint enance Procedurcu (Items 3, 4, 5, 7, 8, 9, 10 of IER 79-03A):

In progress.

Neview and Tmplementation of Changes in Containrant Innlation c.

(Irem 6 1EB 79-05A):

Liceuwee awaiting NER action on 3.icense amendment.

t Qt@ Okkbs

.=

8880 4c 'Jer 2147 139

Davis-Besse Unit 1 4/15/79 d.

Training of Plant l'ersonnel (Itens 1, 4,

11 nd plant /procedinc" changes):

No citange in status from 4/12/79 report.

2.

Suminary of NRC inspection Activity During Period 0710-1610 hre, 4/14/79 Obocrved plant activities on day shif t.

Referenec:

4/13/79-TT 2595/2 St trus (Report dared 4/14/79).

TTT C.1 - 80%*

C.4 - 20%*

C.6 - Completed 3.

Status of Inspector Discussionr. with Plant Personnel:

Compi.eted.

4.

Descriptien of General Plater St alus:

No change in status from 4/12/79 report.

  • Liconeoe is lu the process of changing procedures. May need tu redo portion of this review.

Q3 lkdNks 2147 140 i

.