y -
Tl 2595/2 Attachment I Page 1 of 2 jgg
-.S.Na a;.ln_..
OFFICE OF INSPECTION AND ENFORCEMENT
='
B&W SITE INSPECTOR DALLY R8 PORT Date 4/15/79 Site Oconee 1, 2, 3 Inspector (s)
G. A. Beliste B. T. Moon General Plant Status: ALL three units operating 100% power.
la.
Review of Similar Transients (Item 2 of IEB 79-05A):
No change from April 12.
b.
Review and Revision of Operating and Maintenance Procedures (Items 3, 4, 5, 7, 8, 9, 10 of IEB 79-05A):
No change from April 12.
Review and Implementation of Changes in Containment c.
Isolation (Item 6 IEE 79-054A):
No change f rom April 12.
d.
Training of Plant Personnel (Items 1, 4, 11 and plant / procedures changes):
No change from April 12.
2147 137 7906 2 90 4to
~.
~
Oconee 1, 2, 3 TI 2595/2 Page 2 of 2 2.
SUMMARY
OF NRC INSI'ECTION ACTIVITY DURING PERion 9:00a.m. 4/14-9:00a.m. 4
- x _. -
(Address items 1.a thru 2.d above, give other independent /significant effort, identify shifts on which activity was dono during past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />)
Observed control room operations day / swing shif t and nite / day shif t.
Reviewed shif t control operators logs.
3.
STATUS OF INSPECTOR DISCUSSIONS WITH PLANT PERSONNEL:
Discussed with Unit 1, 2, and 3 operators on day / swing, night shift changes in EP's for operation of RCP's.
A total of 12 operators were interviewed.
4.
DESCRIPTION OF CENERAL PLANT STATUS (i.e., operating power level, planned changes, scheduled outages, ESF out of service, major maintenance, reportable occurrences, etc.)
Uni t' 1, 100%
{NoESFequipmentoutofservice.
Unit 2, 100%
Unit 3, 100%
Jk) major maintenance.
b 2147 138
.