l m

4,,.} ? E APR 2 61979 ME!'0?.A!lDUM FOR: Chaiman Hendrie Comissioner Gilinsky Comissioner Kennedy Comissioner Bradford Cc=fssioner Ahearne THP.U:

\\,LeeV.Gossick 1stped) T 1. *

{ E.xecutive Director for Operations FR0!!:

John G. Davis, Acting Director Office of Inspection and Enforcement

SUBJECT:

STATUS OF SE'd PLETS 11ITH OPERATING LICE!!SES Enclosed for your infor at'.cn is a sc.mry of the status of Rabccck and Wilcox plants for April 20, 1979.

Since conditions at these plants appear to be stable, we have instructed our inspectors to discontinue the submission of daily reports. Henceforth, only significant chances in the m.

status of Eatcock and 'dilcox plants will be reported. Ve will fontard such infomation via the Daily Staff Notes or Preliminary.'iotifications.

John G. Davis Acting Director Office of Inspectica and Enforcement tnclosure:

Distribution:

3%' Status Report -

IE Files 0

W H] uu O

'O M 'l y( b I

4/20/79 B. Paulus, IE

'f)]']"

i i

"4 J. G. Davis, IE ccy.</ encl :

D. Thompson, IE

<2! [ M Incident Resoonse. Center. IE L.

n.

uncerwoca, ii.

5,.

L. V. Gossick, ED0 V. Stello, NRR 2168 00l!

[dolNM 7906290447 71-n M 356 CC.'iTACT:

D. Thceoson 49-2C407 o r ric. >

gbf rO00 J /D-T U '

CnO J.;p2N R hoIpson

.hdiM LVGossick so.=...*

41,u(47.9

?4n,$7o

.. hJbl19

..sL. l79 l

o,,

  • NRC FOIO! 318 (9 76) NROf 0240

@ u. s. oovan=mt=,==i=ti=o orrects s ore - sas-saa

I

!=

Ref.e rence : TI 2592/2 n

Page 1 of 1

'.':4',.

OFFICE OF INSPECTION AND ENFORCEMENT B&W SITE INSPECTOR DAILY REPORT Date 4/20/79 Inspector (s) T. J. McHenry.-

D. S. Price Site Crystal River 3 1.

GENERAL PLANT siATUS

...u'..

Unit at 74*4 power.

One reactor coolant pump secured ta prevent seal degrada. tion.

No major equipment out of service.

Refueling outage to commence 4/24/79.

Scheduled to enter Mode 5 (cold shutdown) 4/25/79.

2.

SUMMARY

OF NRC INSPECTION ACTIVITY DURING PERIOD 4/19/79 Performed inspections of some control room operations on all shifts.

Toured portion of auxiliary building and spent fuel pool area.

Br'efed two operating shift personnel on NRC concerns on Three Mile Island.

Total operating shift personnel briefed is 41 of 41.

Held meeting with plant manager to discuss the RII inspection status with regard to the TMI incident.

Obtained. plant design information requested by NRR.

2163 002 l

7906290450 Q (3:}

'f j 11A9 I JV L t tt

x

Reference:

TI 2592/2

=

Page 1 of 1 f.4if 0FFICE OF INSPECTION AND ENFORCEMENT

[

S&W 3ITE INSPECTOR DAILY REPORT Date 4/20/79

~

Inspector (s)

F. Jape Site Oconee 1,2, and 3 1.

GENERAL PLANT STATUS All three units operating with no major problem.

Oconee 1 at 100% Power on Unit 2 reduced due to water leak in turbine Oconee 2 at 92% condenser box.

Oconee 3 at 100%

No significant mainten,ance scheduled.

~

9:30 a.m., 4/19 2.

SUliMARY OF NRC INSPECTION ACTIVITY DURING PERIOD 9:30 a.m., 4/20 Reviewed plant n?erations en all three shifts.

Witnessed performance of monthly routine test of Unit 3 EGDH pump.

Four operators were stationed at ea.ch valve througnout the test (2.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />) with radio communication to cuntrol room. Test was' satisfactory.

System valving restored and valves padlocked in proper position for emergency use.

Several operators returning from Lynchburg simulator training on TMI stated the simulation was good, useful and worth the trouble going.