ML19269E653

From kanterella
Jump to navigation Jump to search
Forwards Application for Amend to App a of Tech Specs 4.4.1 Re Voltage Sensing Delays
ML19269E653
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 06/19/1979
From: Millen C
PUBLIC SERVICE CO. OF COLORADO
To: Gammill W
Office of Nuclear Reactor Regulation
Shared Package
ML19269E655 List:
References
P-79133, NUDOCS 7906290419
Download: ML19269E653 (1)


Text

June 19, 19 79 Fort St. Ursin Unit No.1 P-79133 Mr. Williart P. Cann111 Assistant Director for Standardization and Advanced Reactors Division of Project Management U. S. Nuclear Regulatory Cormuission Washington, D.C. 20555 Docket No. 50-267

SUBJECT:

Technical Specification Change LCO 4. 4.1, SR 5. 4.1 REFERENCE : (1) IE Inspection Report No.

50-267/78-01

Dear Mr. Gannill:

This letter is to propose the following changes to the Fort St. Vrain Technical Specifications:

LCO 4.4.1 and SR 5.4.1 (Attachmnt 1)

This change supersedes the chanEe to LCO 4.4.1 cs requested in our let-ter, P-78008, dated January 20, 1978.

In accordance with the provisions of 10CFR170, we believe that the pro-posed changes are amendcent Class III, but are exempt from fees since the auendcents are to clarify the Technical Specifications involved, have only minor safety significance, and are being issued for the conve-nience of the Commission.

We request your concurrence with the proposed revisions as soon as possible.

If you have any questions, please contact Mr. D. W. Warembourr;, (303) 571-7436.

Very truly yours, 2147 10eD a 'b C. K. Millen Set.ior Vice President Cxx/alk 7000200M I (

Enclosure