B&W Site Inspector Daily Rept on 790415.Plant Status:Reactor Operating at Full Power W/No Known Problems.No Significant Maint Scheduled
ML19269E697
Person / Time
Site: Rancho Seco
Issue date: 04/15/1979
From: Andrea Johnson, Miller L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML19269E688 List:
References
FOIA-79-98 TI-2595-2, NUDOCS 7906290489
Download: ML19269E697 (2)


Text

.

_s_._

-==

~~~=:

TI 2595/2 Page 1 of i 0FFICE OF IH5PECTION AND ENFor.;EliENT PAW SITE Ill5PECTOR DAILY HEPORT Date 4/15/79 S*te _ _ Rancho Soco Insptetor(s)J. Johnson L. Miller G.:reral Plant Status:

100'J Power - No known problems.

1.

EUtW.RY OF LICEl:SEE RESPONSE TO IE BULLETING 79-05 AND SUPPLEHENTS:

R9 view of Similar Transients (Item 2 of IEB 70-05A):

n.

Completed (as specified in 4/14/79 report).

b.

Review and Revision of Oparating and Maintanance Procedures (It6ms 3, 4, 5, 7, 8, 9,10 of IEB 79-05A):

Same as state.d in 4/14/79 report; licensee received verbal response from NRC clarifying item 4 of IE talletin 79-05A and is expecting written confirmation from NRC.

c.

Review anti Implementation of changes in Containment Isolation (Item 6 IEB 79-054/,):

Completed (as specified in 4/10/79 report).

d.

Training of Plant Personnel (Items 1, 4,11 and plant / procedures changes):

Same as reported in 4/12/79 report.

2147 141 b **R *E v Yn 79o829043q a

m,M eM 1h

~

17 2595/2

~

D ^" ^"

16D

}

Attachacot 1 Page 2 of 2 11 l

o w-o.

a 2.

SUFntlY OF HRC INSPECTION ACTIVITY DURING PERIOD 3L14ng _

(Address Items 1.a. thru 2.d. cbove, plus other iEdapendent/significant

~

effort, identify shifts on which activity was done during pact 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />):

Inspection coverage from 5:45 AM to 5:30 PM.. Completed review on TI 2595/2 item III.C.7 -- licensee does comprehensive valve lineup /

position checks folicwing extended outages which require one operator to perform.

No requirement that operator doing these checks be someone other than. operator who positioned valves initially.

3.

STATUS OF INSPECTOR DISCUSSIGHS WITH PLMT PERSONHEL-Same as reported in 4/14/79 report.

4.

DESCRIPTION OF GEhERAL PLANT STATUS (i.e., operating power levo),

planned changes, scheduled outages, ESP out of service, major caintenance, reportable occurences, etc.)

100% Power, no known problems.

No significant maintenance or surveillance scheduled.

No planned changes in power level.

Next scheduled outage is in 'tay 1979 (brief maintenance outage with reactor remaining critical in sub-power range).

No ESF systems out of service.

Summary of TI 2595/2 items completed to date:

Same as reported on 4/14/79 plus item III.C.7 discussed in 2 above.

t 2147 142 4

.