Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19283B821 + (02:59:38, 3 January 2025)
- ML19283B819 + (02:59:39, 3 January 2025)
- ML19283B817 + (02:59:40, 3 January 2025)
- ML19283B816 + (02:59:40, 3 January 2025)
- ML19283B815 + (02:59:41, 3 January 2025)
- ML19283B814 + (02:59:42, 3 January 2025)
- ML19283B812 + (02:59:43, 3 January 2025)
- ML19283B811 + (02:59:44, 3 January 2025)
- ML19283B810 + (02:59:44, 3 January 2025)
- ML19283B809 + (02:59:45, 3 January 2025)
- ML19283B808 + (02:59:46, 3 January 2025)
- ML19283B806 + (02:59:47, 3 January 2025)
- ML19283B807 + (02:59:47, 3 January 2025)
- ML19283B805 + (02:59:49, 3 January 2025)
- ML19283B803 + (02:59:50, 3 January 2025)
- ML19283B804 + (02:59:50, 3 January 2025)
- ML19283B802 + (02:59:51, 3 January 2025)
- ML19283B800 + (02:59:52, 3 January 2025)
- ML19283B799 + (02:59:53, 3 January 2025)
- ML19283B797 + (02:59:55, 3 January 2025)
- ML19283B795 + (02:59:56, 3 January 2025)
- ML19283B794 + (02:59:57, 3 January 2025)
- ML19283B792 + (02:59:58, 3 January 2025)
- ML19283B789 + (02:59:59, 3 January 2025)
- ML19283B787 + (03:00:00, 3 January 2025)
- ML19283B786 + (03:00:01, 3 January 2025)
- 05000302/LER-1979-019-03, /03L-0 on 790223:motor Driven Emergency Feedwater Pump Discharge Pressure Gauge EF-2-PI Was Out of Calibr. Caused by Inoperable Dampening Snubber Located in Sensing Line.Snubber Was Replaced + (03:00:03, 3 January 2025)
- ML19283B779 + (03:00:05, 3 January 2025)
- ML19283B780 + (03:00:05, 3 January 2025)
- ML19283B777 + (03:00:07, 3 January 2025)
- 05000348/LER-1979-011-03, /03L-0 on 790221:while Doing FNP-1-STP-28.7,LOSP B1F Sequencer Failed to Meet Time Requirement for Picking Up Step 6.Caused by Agastat Timer Setpoint Drift.Agastat Timer Adjusted & Satisfactorily Retested + (03:00:08, 3 January 2025)
- 05000348/LER-1979-010-03, /03L-0 on 790218:while Doing FNP-1-STP-215.1B, Steam Flow/Feed Flow Bistable (FB478A)failed to Meet Table 2-1 Trip Setpoint Valve.Caused by Bistable Setpoint Drift Below That Specified in Surveillance Test.Bistable Adjusted + (03:00:10, 3 January 2025)
- 05000348/LER-1979-009-03, /03L-0 on 790216:during Plant Startup W/Reactor & Steam Generator Controls Manual & Steam Dumps in Automatic, Steam Dumps Occurred.Temp Average Reduced to 538 F.Personnel Reinstructed + (03:00:12, 3 January 2025)
- ML19283B773 + (03:00:14, 3 January 2025)
- 05000348/LER-1979-008-03, /03L-0 on 790216:during Review of Surveillance Test FNP-1-STP-15.0,containment Main Personnel & Emergency Air Leak Outer Doors Failed to Meet Acceptance Criteria. Leakage Probably Caused by Dirty Door Seals &/Or Seal Set + (03:00:17, 3 January 2025)
- 05000348/LER-1979-007-03, /03L-0 on 790212:during Review of Surveillance Test Data,Noted That RCS Leakage Test (FNP-1-STP-9.0) Had Not Been Done within Time Specified.Caused by Personnel Failure.Supervisors Instructed Re Matter + (03:00:21, 3 January 2025)
- ML19283B769 + (03:00:29, 3 January 2025)
- ML19283B768 + (03:00:31, 3 January 2025)
- 05000348/LER-1979-007, Forwards LER 79-007/03L-0,LER 79-008/03L-0,LER 79-009/03L-0, LER 79-010/03L-0, & 79-011/03L-0 + (03:00:33, 3 January 2025)
- ML19283B764 + (03:00:35, 3 January 2025)
- IR 05000247/1978035 + (03:00:42, 3 January 2025)
- ML19283B756 + (03:00:44, 3 January 2025)
- ML19283B755 + (03:00:45, 3 January 2025)
- ML19283B754 + (03:00:48, 3 January 2025)
- ML19283B753 + (03:00:49, 3 January 2025)
- ML19283B751 + (03:00:51, 3 January 2025)
- ML19283B749 + (03:00:53, 3 January 2025)
- ML19283B747 + (03:00:55, 3 January 2025)
- ML19283B745 + (03:00:57, 3 January 2025)
- ML19283B744 + (03:00:58, 3 January 2025)
- ML19283B743 + (03:00:59, 3 January 2025)