Forwards Monthly Operating Rept for Feb 1979
ML19283B747
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/08/1979
From: Murray T
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML19283B748 List:
References
179-176, NUDOCS 7903140320
Download: ML19283B747 (1)


Text

, . -

r--

e~ j TOLEDOEDISON March 8, 1979 L79-176 FILE: RR 2 (P-6-79-02)

Docket No. 50-346 License No. NPF-3 Dr. Ernst Volgenau, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Doctor Volgenau:

Monthly Operating Report, February, 1979 Davis-Besse Nuclear Power Station Unit 1 Enclosed are ten copies of the Monthly Operating Report for Davis-Besse Nuclear Power Station Unit 1, f or the month of February,1979.

The reactor reserve shutdown hours in the Operating Data Report for December, 1978, was re-evaluated and found to be 367.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />. This should be added to the year-to-date and cu=ulative values. It would also change the cumulative value f or January,1979.

l The number sequence for the unit shutdowns and power reductions in January of 1979 was incorrect and has been renuabered. The numbers that were previously 33 through 36 have been changed to 1 through 4.

The duration for number 4 (which was previously numbered 36) in the Unit Shutdowns and Power Reductions for January, 1979, should be 367.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />, which is eight hours more than previously recorded.

Attached are the applicable sheets showing the above revisions.

Yours truly, D

Terry D. Murray Station Superintendent Davis-Besse Nuclear Power Station TDM/ECC/CNA/ljk Enclosures 7 9 0 314 0 31c) cc: Mr. James G. Keppler Mr. William G. Mcdonald ECISON PLAZA 3CO MAO! SON AVENUE TOLEDO OH!O 43552 THE TOLEDO EDiSCN COMPANY