Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000271/LER-1978-020-01, /01T-1 on 780701:growing Crack Was Observed in Torus Shell Adjacent to Weld.Caused by Failure of a Certain Welding Process to Produce the Desired Results in Metallurgical Properties + (02:28:00, 3 January 2025)
- ML19289C600 + (02:28:01, 3 January 2025)
- 05000338/LER-1978-130-03, /03L-0 on 781220:during incore-excore Detector Cross Calibr,Axial Flux Deviated Contrary to Tech Specs. Caused by Personnel Error + (02:28:02, 3 January 2025)
- 05000271/LER-1978-020, Forwards LER 78-020/01T-1 + (02:28:07, 3 January 2025)
- ML19289C596 + (02:28:11, 3 January 2025)
- 05000338/LER-1978-130, Forwards LER 78-130/03L-0,78-133/03L-0 & 78-135/03L-0 + (02:28:15, 3 January 2025)
- ML19289C593 + (02:28:19, 3 January 2025)
- AECM-78-104, Findings of Investigation of Normal Reactor Protection Sys Power Supplies Will Be Available by 790301,rather than 790103 as Reported in + (02:28:23, 3 January 2025)
- 05000278/LER-1978-024-03, /03L-0 on 781212:reactor Core Isolation Cooling Valve Mo-13-15 Failed to Close During Surveillance Test 6.11.Caused by Cocked Packing Follower Jamming Valve Stem + (02:28:28, 3 January 2025)
- 05000338/LER-1978-051-01, /01X-1 on 780614:auxiliary Feedwater Pump start-up Delay Due to Improper Adjustment of Instantaneous Contracts on an Aquastat 2400 Series Relay + (02:28:34, 3 January 2025)
- 05000338/LER-1978-051, Forwards LER 78-051/01X-1 + (02:28:35, 3 January 2025)
- ML19289C587 + (02:28:36, 3 January 2025)
- ML19289C586 + (02:28:39, 3 January 2025)
- ML19289C584 + (02:28:40, 3 January 2025)
- ML19289C583 + (02:28:44, 3 January 2025)
- ML19289C582 + (02:28:45, 3 January 2025)
- ML19289C580 + (02:28:46, 3 January 2025)
- ML19289C577 + (02:28:48, 3 January 2025)
- ML19289C576 + (02:28:49, 3 January 2025)
- ML19289C575 + (02:28:56, 3 January 2025)
- ML19289C574 + (02:28:58, 3 January 2025)
- ML19289C573 + (02:29:02, 3 January 2025)
- ML19289C571 + (02:29:04, 3 January 2025)
- ML19289C570 + (02:29:07, 3 January 2025)
- IR 05000321/1978034 + (02:29:10, 3 January 2025)
- ML19289C568 + (02:29:12, 3 January 2025)
- IR 05000466/1978003 + (02:29:14, 3 January 2025)
- ML19289C566 + (02:29:15, 3 January 2025)
- ML19289C565 + (02:29:17, 3 January 2025)
- ML19289C564 + (02:29:17, 3 January 2025)
- TXX-2927, Responds to NRC Re Violations Noted in IE Insp Repts 50-445/78-18 & 50-446/78-18.Corrective Actions:Review of Welding Procedures & 2 Week Cycle of QA Surveillance of Welding + (02:29:19, 3 January 2025)
- ML19289C562 + (02:29:19, 3 January 2025)
- ML19289C559 + (02:29:22, 3 January 2025)
- ML19289C555 + (02:29:30, 3 January 2025)
- ML19289C553 + (02:29:41, 3 January 2025)
- ML19289C552 + (02:29:42, 3 January 2025)
- ML19289C551 + (02:29:43, 3 January 2025)
- ML19289C550 + (02:29:45, 3 January 2025)
- ML19289C548 + (02:29:47, 3 January 2025)
- ML19289C549 + (02:29:47, 3 January 2025)
- ML19289C546 + (02:29:48, 3 January 2025)
- ML19289C545 + (02:29:49, 3 January 2025)
- ML19289C543 + (02:29:54, 3 January 2025)
- ML19289C541 + (02:29:57, 3 January 2025)
- ML19289C539 + (02:29:58, 3 January 2025)
- ML19289C537 + (02:30:02, 3 January 2025)
- ML19289C535 + (02:30:04, 3 January 2025)
- ML19289C532 + (02:30:05, 3 January 2025)
- ML19289C529 + (02:30:06, 3 January 2025)
- ML19289C530 + (02:30:06, 3 January 2025)
- 05000133/LER-1978-004-03, /03L-0 on 781213:during Routine Testing,Redundant Gas Treatment Sys Fan Operated But Did Not Produce Design Flow of 134 Cfm in Tech Specs.Abnormally High Drop in Pressure Across Gas Scrubber Column Was Observed + (02:30:08, 3 January 2025)