Forwards Rept Bedrock Deformation in the Cooling Water Sys Intake Tunnel Re Bedrock Fault Discovered by Excavation During Week of 780417.Requests Timely Review & Comments Since Const Scheduled to Begin Aug 1978.W/o Encl
ML19289C580
Person / Time
Site: Perry  
Issue date: 06/07/1978
From: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
To: Varga S
Office of Nuclear Reactor Regulation
Shared Package
ML19289C581 List:
References
NUDOCS 7901190088
Download: ML19289C580 (1)


Text

THE CLEVELAND ELECTRIC ILLUMIN ATING COMPANY ILLUMIN ATING DLOG. e PUBLIC SOUA?.E e CLEVELAND. OHIO 44101 e TELEPHONE (216) 623-1350 e Mall ADDRESS: P. O. BOX 5000 Semng The Best Location in the Nation Dalwyn R. Davidson VICE PRESIDENT - ENGINEERING June 7, 1978 Director of Nuclear Reactor Regulation Attn:

Mr. Steven A. Varga, Chief Light Water Reactors Branch No. 4 Division of Project Manage =ent U. S. Nuclear Regulatory Co==ission Washington, D. C.

20555 Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Bedrock Deformation in the Perry Intake Tunnel

Dear Mr. Varga:

During the mapping and geologic investigation of the Che6rin shale in the Perry Cooling Water Intake Tunnel excavation, a bedrock fault was discovered.

The fault was intersected by excavation during the week of April 17, 1978, but could not be observed until April 25, 1978, subsequent tc the a cancement of the t,unnel machine.

Our consultants, Gilbert Associates, Inc., have investigated the bedrock deformation and have prepared a detailed report on the observed fault which is attached for your information. We concur with the conclusions of our consultants which include, in part, that the tunnel fault is attributable to glacitectonic deformation, is similar to the structures exposed in the onshore excavations, and is neither earthquake related nor capable.

Therefore, our conclusions as to the suitability of the founding bedrock are not changed.

We welcome your review of the attached report and would appreciate any co=ments you may have.

Inasmuch as our construction schedule indicates that concreting of the intake tunnel will begin in, early August,1978, further investigation of the faulted area, if required, should be ca=pleted by that time.

Therefore, your timely review of the attached report will be appreciated.

If you desire further information concerning the bedrock deformation, please let me know.

Very truly yours,

}

D)

Dalvyn Davidson V'ce President-Engineerirg Attachment 79011900 3