NOV 2 4 B78 APPENDIX A NOTICE OF VIOLATION Georgia Power Company License No. NPF-5 Based on the results of the NRC inspection conducted on October 17-20, 1978, it appears that certain of your activities were not conducted in full compliance with NRC requirements as indicated below.
These items have been categorized as described in our correspondence to you dated December 31, 1974.
Technical Specification 6.8.1 states, in part, that " Written procedures shall be established, implemented and maintained covering the applicable procedures recommended in Appendix "A" of Regulatory Guide 1.33, Revision 2, February, 1978." Regulatory Guide 1.33, Revision 2, Appendix A, Paragraph 7e(2) recommends that the performance of radiation surveys be covered by written procedures.
Plant Procedure HNP-2-10090 " Radiation Measurements" requires that radiation survey instruments be checked against a known source strength with + 20% accuracy."
Contrary to the above, Procedure HNP-2-10090 " Radiation Measure-ments" was not followed, in that neutron survey instruments were not checked against a known source strength as required by steps B.4.b, D.3.b and F.3.b of the procedure prior to signing the procedure steps as completed.
This is an infraction.
geo1170M/
NOV 2 41978
., Georgia Power Company In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room. If th s report contains any information that you (or your contractor) believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure. Any such application must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so that pro rietary information identified in the application is contained r
in a separate part of the document.
If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss them with you.
Sincerely, I
Q JA J. T. Sutherland, Chief Fuel Facility and Materials Safety Branch
Enclosures:
1.
Appendix A, Notice of Violation 2.
Inspection Report Nos. 50-321/78-34 and 30-366/78-42 cc w/ enc 1:
Mr. C. E. Belflower Site QA Supervisor Plant E. I. Hatch P. O. Box 442 Baxley, Georgia 31513 Mr. M. Manry, Plant Manager Plant E. I. Hatch P. O. Box 442 Baxley, Georgia 31513